05000416/LER-1982-068, Forwards LER 82-068/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-068/03L-0
ML20065N361
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/08/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065N363 List:
References
AECM-82-468, NUDOCS 8210220181
Download: ML20065N361 (1)


LER-2082-068, Forwards LER 82-068/03L-0
Event date:
Report date:
4162082068R00 - NRC Website

text

.Y o -

MISSISSIPPI POWER & LIGHT COMPANY N

] Helping Build Mississippi P. O. B OX 1840, J AC K S O N. MIS SIS SIP PI 3 9 2 05 October 8, 1982

. Nii[5N?i7d*[

Office of Inspection & Enforcement 'c ^

N U. S. Nuclear Regulatory Commission Region 11 $

101 Marietta St., N.W., Suite 3100 -# C$

~

Atlanta, Georgia 30303 4 ;J o^

." :n Attention: Mr. J. P. O'Reilly, Regional Administrator 2 c::a o tri r, O

Dear Mr. O'Reilly:

. k' o -

SUBJECT:

Grand Gulf Nuclear SYhition .

Unit 1 Docket No. 50-416 License No. NPF-13 -

File 0260/L-835.0 Reactor Pressure Vessel Flange and lhad Flange Temperature Measureme'nt

Reference:

LER 82-068/03 L-0 AECM-82/468 Reactor pressure vessel flange and head flange temperatures were not monitored with periodicity required by T.S.4.4.6.1.4.a. This is a reportable event under T.S.6.9.1.13.b. Attached is LER 82-068/03 L-0 with supplementary information.

Yours truly, JPM: sap [v @ O $

Attachment cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T.

n 8210220181 821000 DR ADOCK 05000 ggyL Member Middle South Utiitties System