Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement
ML20245K013
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/21/1989
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8905040304
Download: ML20245K013 (2)


LER-2088-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement
Event date:
Report date:
3442088019R00 - NRC Website

text

- _ _ _ _ _ _ _ _ _ - - _ _ . . _ - __ _ _ _ ._ ._ _ . - _ _ _ _ _ - - -

, w

. [' 4*g' .p l .. , RECEIVED l mh summa t4RC

, , , . Portland General Electric Coiripiniy REGl0'i r a El David W. Cockfield Vice President, Nuclear p WR 24 PIE ' O April 21, 1989 Trojan Nuclear Plant Docket 50-344 License NPF-1 kr. John B. Martin Regional Administrator, Region V

') . S . Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek CA 94596-5368

Dear Mr. Martin:

Deficiencies. Identified in Licenseo Event Report (LER) 88-19, Revision 1, " Surveillance Required by Technical Specifications Not Performed Following Containment Hydronen Vent System Absorber Replacement" Your letter of February 8, 1989 identified deficiencies with Revision 1 to LER 88-19 issued on November 11, 1988. Revision 2 was subsequently issued on March 31, 1989 and addresses the concerns raised in your letter. The LER now includes a discussion on: j i

1. Failure of craftsman to adequately recognize that the system (CS-9B) f being worked on was not under clearance, q l
2. An apparent violation of Plant Safety Procedure 3-30, Revision 18 j regarding proper description of the wor'k to be performed, the equipment j to be worked on, and the area in which the work would be performed. ]

l

3. The apparent inconsistencies between two test results on the "A" Train j filter of the hydrogen vent system. l
4. Field observation of the work by the Maintenance Work Group Supervisor in accordance with Administrative Order 3-9, " Maintenance Requests".
5. Independent reviews of the completed maintenance request by the Shift Supervisor and the Maintenance Work Group Supervisor.
6. Timeliness of LER revisions.

8905040304 890421 PDR S

ADOCK 05000344 [ j l

PNU

\ \ 4 121 SW Salmon Stwet. Port and Oregon 97204

, 0, ,

W W WCM Mr. John B. Martin April 21, 1989 Page 2 We concur that each of these concerns should have been addressed by the original LER. Revision 2 to LER 88-19 reflects the high quality that we intend to achieve on every LER issued. We will strive to maintain this quality in future LERs and welcome your suggestions for improvement. LER revisions are now being more closely monitored to ensure their timely issuance.

Sincerely, c: U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Mr. William T. Dixon ,

State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan kvuclear Plant