Forwards Draft Tech Specs for Certification as Prerequisite for Issuance of Low Power OL & Consistency W/Fsar,Ser & as-built Facility.Tech Specs Do Not Delete Fire Protection Elements Per 851108 Discussion.W/O Encl
ML20136G957
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/19/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8511220512
Download: ML20136G957 (3)


Text

'

NOV 191985 Docket No.: 50-440

'Mr..Murr_ay R. Edelman .

Vice President - Nuclear Group-L The Cleveland Electric Illuminating Company P. O. Box 5000-Cleveland, Ohio -44101

Dear Mr._Edelman:

Subject:

Request for Certification of the Perry Nuclear Power Plant, Unit 1 Technical Specifications Enclosed is the final draft of the Perry Unit 1 Technical Specifications which

' you are requested to certify as a prerequisite for issuance of a low-power op-erating license. You should certify that the enclosed Technical Specifications

~

are consistent with the Final Safety Analysis Report, the NRC Safety Evaluation Report (NUREG-0887), and the as-built facility. The resources and processes used to review and certify the Technical Specifications should be detailed-in your response. ,

It should be noted that the enclosed final draft of the Perry Unit 1 Technical Specifications do not at this time delete the fire protection elements as dis-cussed with.your staff on November 8,-1985. We understand that your staff.will be providing a Perry Unit 1 plant-specific recommendation to assist the NRC in its objective of simplifying the Technical Specifications, which will propose to document CEI's consnitment to implement the fire protection elements in an FSAR amendment prior to licensing. This action will require some modification to the fire protection license condition delineated in Section 2.C. of the draft Perry Unit l' Operating license, provided to you for comment by my letter dated October 31, 1985.

If there are any questions please direct them to the Perry Project Manager, John Stefano.

Sincerely, T. M. Novak, Assistant Director Division of licensing _ 'l Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

  • SEE PREVIOUS CONCURRENCES (B#1/DL. TSRB/DL LB#1/DL- /

l -

l .

(

  • JStefano/mac *MVirgilio *8JYoungblood 1 vak 11/14/85' 11/14/85 11/if/85 11//7/85 8511220512 851119 PDR ADOCK 05000440 P PDR
c. 2 7

. 'I Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric -

Units 1 and 2 Illuminating Company cc:

Jay Silberg, Esq. Mr. Larry O. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W. Illuminating Company Washington, D. C. 20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 e

Resident Inspector's Office (3)

U. S. Nuclear Regulatory Commission

. Pannly at Center Road  ;

+ IT - ~ Perry. 0hio 44081 _

Regional Administrator, Region III (2)

-U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.

Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt OCRE Interim Representative ,

8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.

618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.

Prosecuting Attorney Ashtabula County Courthouse l Jefferson, Ohio 44047

4,

g w/o enclosures C~PDR" " "

Local PDR PRC System' NSIC LBf1-Rdg MRushbrook JStefano OELD .

ACRS(16)

JPartlow EJordan BGrimes HRDenton/DGEissnhut HLThompson, Jr.

TMNovak-DMCrutchfield

-MVirgilio SBrown CPWoodhead d

-T p

t

. .. - -. .- .-- - . . - . _ . . . . . . . . - . - . - . . - - . . . _ .