ML20006C566

From kanterella
Jump to navigation Jump to search
Provides Certification Re Implementation of Fitness for Duty Program Per 10CFR26 at Plants
ML20006C566
Person / Time
Site: Peach Bottom, Limerick, 05000000
Issue date: 01/31/1990
From: Helwig D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002080235
Download: ML20006C566 (2)


Text

'

, V1

'. 10 CFR 26.73(d)

. .~

.- l l

PHILADELPHI A ELECTRIC COMPANY

]

I

. NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.

  • WAYNE. PA 19087 5691 ';

(215) 640 6550 i

DAVID R. HELWlO

=S*5[.".*'I

, "c' . January 31, 1990 Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 U.S. Nuclear Regulatory Commission  !

Attn Document Control Desk Washington, DC 20555  ;

SUBJECT:

Peach Botton Atomic Power Station, Units 2 and 3 '

Limerick Generating Station, Units 1 and 2 .

i 10 CFR 26 - Fitness-for-Duty Programs >

b Certification of Implementation of a Fitness-  !

for-Duty Program that Meets the Requirements of 10 CFR 26 i l

Gentlemen:

l i

l The final rule, " Fitness-for-Duty Programs," 10 CFR 26,  ;

j was issued in the Federal Register (FR) on June 7, 1989 (54 FR ,

j 24468). This rule became effective on July 7, 1989 and, in

  • L accordance with 10 CFRR2 6 .2(c), is required to be implemented no 3 later than January 3, 1990. Furthermore, 10 CFR 26.73(d) requires that each licensee chall certify to the NRC that it has implemented ,

a fitness-for-duty program that meets the requirements of 10 CFR 26, ,

and that the certification shall describe any licensee chemical ,

testing cut-off-levels more stringent than those imposed by 10 CFR

26. .Our letter dated January 3, 1990 stated that we were performing a confirmatory review of the fitness-for-duty program implemented at the Philadelphia Electric Company (PECo), and that upon completion of this review by the end of January, 1990, I would certify by  !

l January 31, 1990, that PEco has implemented a fitness-for-duty program that meets the requirements of 10 CPR 26. Our January 3, .

1990. letter also specified the chemical testing and associated cut- l 1

9002080235 900131 j

-PDR ADOCK 05000277 x '

.P PDC d T

i

m -

I=

t j

, U.S. NuclCOr Cegulotcry Cosmiccicn JOnunry 31, 1990  !

.-Document Control Deck Page 2 off levels included in the PECo fitness-for-duty program which are in addition to the testing for substances at the cut-off levels l specified by 10 CFR 26. Our confirmatory review has been completed and this letter provides our certification regarding the implementation of a fitness-for-duty program at PECo.

Accordingly, I certify that to the best of my knowledge a fitness-for-duty program that meets the requirements of 10 CPR 26, has been implemented at PECo. While the PECo fitness-for-duty I program includes the requirements of 10 CPR 26, confirmation that '

vendor supervisors located off-site (i.e., at the vendor location) received the required training from the vendor organization will be performed as part of our normal audit program.

If you have any questions, or require additional l information, please contact us.

j Ver truly yours, I l

g j , t._-- -

cc: W. T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector, LGS J. J. Lyash, USNRC Senior Resident Inspector, PBAPS  :

i Swomte dsubscribedbefortfRf this _ 9 d4DNl" 1D

(){%L/x, J '"'^^

NOTARIAL SE AL ANGELA O OLENGINSKL Notary PutAc Wayne. Ches* County My Commrss:on Expres Aug 01.1002 i

,-_