ML20055D114

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revs to Emergency Response Procedures,Including Rev 9 to ERP-140 & Rev 3 to ERP-315
ML20055D114
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/08/1990
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055D115 List:
References
NUDOCS 9007030228
Download: ML20055D114 (2)


Text

- .. . . - - . . _ ._._-..---- -

10 CFR 50,54(q) i 10 CFR 50, Appendix E

\

. PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD, WAYNE PA 19087 5691  !

(als)saosooo t

June 8, 1990 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 -

P U. S. Nuclear Regulatory Connission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan implementing Procedures

Dear Sir:

Enclosed is revision number 38 to the Emergency Response Procedures for Peach Botton Atomic Power Station Units 2 and 3. These procedures are being submitted in accordance with 10 CfR 50.54(q), 10 CFR 50 - Appendix E, and 10 CfR 50.4. 'the following revised procedures are enclosed, o ERP-140, App. 1. Rev. 9 -

"EmergencyDirectors(ED)" *

(Callin2) o ERP-315, Rev. 3 - " Operation of the Peach Botton Computer Dose Assessment System" In accordance with 10 CFR 2.790(a)(6), we request that names and telepaone numbers in the above procedures be withheld from public disclosure since such disclosures would constitute an unwarranted invasion of the personal privacy of the individuals involved. ,

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, l . h. , 14 V 4 l . ,, 'G. A. Hunger, r.

l ofe , Manager-Licensing t

Nuclear Engineering & Services 9007030228 90060s PDR Ed we ADOCK 0500 7

! cc: J. J. Lyash, USNRC Senior Resident Inspector, PBAPS

T.T. Martin, Administrator,RegionI,USNRC(2 copies) \

Ifl

. . . ~ - . - .

l EMERGENCY RESPONSE PROCI:DURES INDEX ERP Index i

  • Page 1 PEACH BOTTOM UNITS 2 AND 3 Rev. 38
  • l 05/17/90
  • l Sponsor Reviest Rev. Revision  :

Number Title Number .. Date_._ L Date ERP-101 CLASSIFICATION OF (000000) 06/02/88 5 02/02/90

, ,. EMERGENCIES ERP-110 EMERGENCY NOTIFICATIONS (000000) 03/27/90 3 09/16/88 i g ERP-110 EMERGENCY (000000) 02/02/90 13 02/02/90

APPENDIX 1 CLASSIFICATION NOTIFICATION TELEPHONE LIST FOR AN UNUSUAL ,

EVENT OR ALERT ,

i ERP-110 EMERGENCY (000000) 02/02/90 10 02/02/90 '

APPENDIX 2 CLASSIFICATION NOTIFICATION TELEPHONE LIST FOR A SITE EMERGENCY OR GENERAL EMERGENCY -

ERP-120 PARTIAL PLANT EVACUATION (000000) 03/27/90 1 01/12/89 ERP-130 SITE. EVACUATION (000000) 03/27/90 2 12/28/88 ERP-140 TELEPHONE LISTS FOR (000000) 06/02/88 3 05/08/89 EMERGENCY USE ERP-140 EMERGENCY DIRECTORS (000000) 05/15/90 9 05/15/90*

l APPEL' DIX 1 (ED) (CALL IN 2) .. .

ERP-140 TECHNICAL SUPPORT TEAM (000000) 03/27/90 11 03/27/90 APPENDIX 2 LEADER (TSTL)

ERP-140 DOSE ASSESSMENT TEAM (000000) 02/02/90 11 02/02/90 APPENDIX 3 LEADER (DATL)

ERP-140 CHEMISTRY SAMPLING & (000000) 03/16/90 9 03/16/90 APPENDIX 4 ANJ.:J3IS TEAM LEADER (CE ;L)

ERP-140 DAMAGS REPAIR TEAM (000000) 03/16/90 9 03/16/90 APPENDIX 5 LEADER (DRTL) t

- ERP-140 SECURITY TEAM LEADER (000000) 03/~16/90 7 03/16/90 APPENDIX 6 (STL)

-ERP-140 PERSONNEL SAFETY TEAM (000000)- 03/16/90 10 03/16/90-APPENDIX 7 LEADER (PSTL)

ERP-140 COMPANY CONSULTANTS AND (000000) 06/02/89 5 06/02/89 APPENDIX 8 CONTRACTORS

. m m -- ---= m.n m m m. m w m u- -

7.r, ~ ws - y =~w m

i

.1

.. . . h i

EMERGENCY RESPONSE PROCEDURES INDEX ERP Index Page 2 -

PEACH BOTTOM UNITS 2 AND 3 Rev. 38

  • l 05/17/9 3 l Sponsor Review Rev. Revision Number Title Ntmne r Date ESA_ Date 1

ERP-140 NEARBY PUBLIC AND (000000) 03/16/90 6 03/16/90

, -APPENDIX 9 INDUSTRIAL USERS OF '

i

! DOWNSTREAM WATER ERP-200 EMERGENCY DIRECTOR (ED) (000000) 12/13/89 5 03/16/90 f ERP-210 EMERGENCY RESPONSE (000000) 03/27/90 2 07/25/89 MANAGER (ERM)

ERP-215 PLANNING & SCHEDULING (000000) 03/27/90 0 06/02/88  !

COORDINATOR (P&SC)

ERP-220 OPERATIONS SUPPORT (000000) 03/27/90 2 12/28/88 i CENTER (OSC) OPERATIONS PERSCNNEL ERP-230 OPERATIONS SUPPORT (000000) 04/11/90 3 01/12/89 i CENTER (OSC) ACTIVATION ERP-240 AUXILIARY OPERATIONS (000000) 08/01/88 SUPPORT CENTER (AUX I

OSC) ACTIVATION

-CANCELLED- NO '

REPLACEMENT ERP-250 TECHNICAL SUPPORT (000000) 03/30/90 3 03/28/89

.. w - ;. .u . . . -. n .- = .

ERP-260 EMERGENCY OPERATIONS (000000) 02/02/90 5 02/02/90 FACILITY (EOF)

ACTIVATION >

ERP-270 ALTERNATE EMERGENCY (000000) 04/11/90 1 08/29/88 l OPERATIONS FACILITY i

(ALT EOF) ACTIVATION ,

ERP-300 DOSE ASSESSMENT TEAM (000000) 06/02/88 2 03/20/89 LEADER (DATL)

ERP-305 DOSE ASSESSMENT TEAM (000000) 03/16/90 2 03/16/90 LEADER (DAGL)

ERP-310 DOSE ASSESSMENT GROUP (000000) 06/02/88 2 03/20/89 ERP-315 OPERATION OF THE PEACH- (000000) 05/11/90--3 -- 05/11/90*

BOTTOM COMPUTER DOSE ASSESSMENT SYSTEM )

ERP-316 CUMULATIVE POPULATION (000000) 12/19/89 3 03/27/90 DOSE CALCULATIONS FOR AIRBORNE RELEASES -

f EMERGENCY RESPONSE PROCEDURES INDEX ERP Index ,

~,

Page 3 i

PEACH BOTTOM UNITS 2 AND 3 Rev. 38 * '

l 05/17/90 * .

1 Sponsor Review Rev. Revision l

Number Title Number Date Egt. Date l

L MANUAL METHOD o !

ERP-317 DETERMINATION OF (000000) 06/02/88 2 02/02/90 PROTECTIVE ACTION RECOMMENDATIONS

\

l

ERP-318 LIQUID RELEASE DOSE (000000) 06/02/88 1 08/29/88 L CALCULATIONS AT l Dr'fMSTREAM WATER INTAKE l Thu1LITIES

! i- 'ERP-319 LIQUID RELEASE DOSE (000000) 06/02/88 1 08/29/88 CALCULATIONS FOR FISH INGESTION ERP-320 USE OF THE CONTAINMENT (000000) 06/02/88 1 08/29/88 RADIATION MONITOR TO -

ESTIMATE RELEASE SOURCE TERM AND NOBLE GAS MONITOR READINGS l

l ERP-3JO FIELD SURVEY GROUP (000000) 06/02/88 4 03/27/90 L LEADER (FSGL)

ERP-340 FIELD SURVEY GROUP (000000) 06/02/88 1 08/29/88 ERP-350 THYROID DOSE COMMITMENT (000000) 04/18/90 0 04/18/90

"*"-- - USING TCS AIR S AMPLINGe < - - -'- s~ e e - -w. u " - -

SYSTEM ERP-400 CHEMISTRY SAMPLING AND (000000) 03/27/90 1 08/29/88 ANALYSIS TEAM LEADER (CSATL)

ERP-410 CHEMISTRY SAMPLING AND (000000) 03/27/90 1 08/29/88 ANALYSIS TEAM L ERP-500 SECURITY TEAM LEADER (000000) 02/02/90 2 02/02/90 ,

L (STL) l ERP-510 PERSONNEL ACCOUNTABILITY (000000) 02/02/90 3 02/02/90 ERP-520 SECURITY TEAM ACTIVATION (000000) 02/02/90 1 02/02/90 ERP-600- PERSONNEL ~ SAFETY TEAM (000000) 04/05/90 3 03/20/89 LEADER (PSTL)

'ERP-610 FIRST AID / SEARCH AND (000000) 06/02/88 2 12/28/88 RESCUE GROUP l

=m-- r --:n - % .w.m.- - m w. m wu.% m.uw w - w. - um . . w

r 1

'l i

EMERGENCY RESPONSE PROCEDURES INDEX ERP Indek l Page 4' i PEACH BOTTOM UNITS 2 AND 3 Rev. 38 * <

05/17/9 , l Sponsor Review Rev. Revision Title Number Date H2A_ Date Number ERP-620 PLANT SURVEY GROUP (000000) 04/05/90 2 01/12/89  ;

1 ERP-630 DOSIMETRY, BIOASSAY, (000000) 04/05/90 1 08/29/88 AND RESPIRATORY .

PROTECTION GROUP

'! ERP-640 VEHICLE AND EVACUEE (000000) 04/05/90 1 02/01/89  ;

CONTROL GROUP 4 ERP-650 TRANSPORT OF (000000) 04/05/90 2 12/28/88 CONTAMINATED INJURY i OFF-SITE  ;

ERP-660 ENTRY FOR EMERGENCY (000000) 04/05/90 2 05/04/89 REPAIR AND OPERATIONS l ERP-670 EMERGENCY RADIATION (000000) 04/05/90 0 06/02/88 l EXPOSURE GUIDELINES AND l CONTROLS ERP-680 CONTROL OF THYROID (000000) 04/05/90 1 07/25/P" i l

BLOCKING POTASSIUM IODIDE (KI) TABLETS ERP-700 ' TECHNICAL SUPPORT TEAM (000000) 03/30/90 2 03/20/89 LEADER (TSTL)

. %a.ggp.71o,. __ m,"-TECHNICAL SUPPORT TEAM "(OOOOOO)uO3/30/90 - 3 01/04/90 ERP-800 DAMAGE REPAIR TEAM (000000) 03/30/90 1 01/13/89 LEADER (DRTL)

ERP-810 DAMAGE REPAIR GROUP (000000) 04/11/90 2 01/13/89 l ERP-900 RECOVERY PHASE (000000) 04/11/90 0 06/02/88 l IMPLEMENTATION l ERP-910 RECEPTION AND (000000) 04/11/90 0 06/02/88 ORIENTATION OF SUPPORT '

PERSONNEL I

i e a ,,

&#=4e m ,-~ ~ ~ - - n =,.- - - . _ . i