Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/87-01
ML20214K065
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/14/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8705280311
Download: ML20214K065 (2)


Text

-- -

,

,

MAY 14 W Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06141 Gentlemen:

Subject: Inspection No. 50-213/87-01 This refers to your letter dated March 10, 1987, in response to our letter dated February 11, 198 Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be e.tamined during a future inspection of your licensed progra Your cooperation with us is appreciate

Sincerely, Original Signed 371 F. F.. Ecpen William V. Johnston, Acting Director Division of Reactor Safety .

cc w/ encl:

D. B. Miller, Station Superintendent D. O. Nordquist, Manager of Quality Assurance R. M. Kacich, Manager, Generation Facilities Licensing W. D. Romberg, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut B705280311 870514 k G

PDR g

ADOCK 05000213 PDR>

\\

0FFICIAL RECORD COPY RL HN 87-01 - 0001. /28/87

,

_

. . - _ .

.

i g-bcc w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP :

M. McBride, RI, Pilgrim

.J. Shediosky,-SRI, Millstone 1&2 T. Rebelowski, SRI, Millstone 3 J. Akstulewicz, LPM, NRR R. Bores, DRSS

.

.

!

R S RI:DRS I Chaudhary/ca Blumberg E oth 4ks/87 W 5/87 5 /87 0FFICIAL RECORD COPY- RL HN 87-01 - 0002. /28/87

1

f. ..

[ CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N, CONNECTICUT P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 TELEPHONE 203ms-s000 March 10, 1987 Docket No. 50-213 A06374 Re: 10 CFR 50, App. B U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Reference: (1) S. Ebneter letter to Opeka, dated February 11, 1987, transmitting Inspection Report No. 50-213/87-0 Gentlemen:

Haddam Neck Plant Response to I&E Inspection No. 50-213/87-01 Pursuant to the provisions of Section 2.201 (" Notice of Violation") and Appendix C (Enforcement Policy) of the NRC Rules of Practice Reference (1), (10CFR2), this report is submitted in reply to Company (CYAPCO)which informed Connecticut Yankee Atomic Power of a violation identified during a routine inspection at the Haddam Neck Plant from January 6-9, 198 Requirement

10 CFR 50, Appendix B, Criterion V, states in part that )

activities instructions, affecting quality shall be prescribed by documented i procedures, or drawings and shall be accomplished in accordance Criterion II with these instructions, procedures, and drawings; further states that the quality assurance program shall provide control over activities affecting qualit Finding Contrary to the above, as of January 9, 1987, the control provided by procedure ACP 1.2-6.4, Temporary Procedure Change, Rev. 18, over changes and substitution of test equipment was not adequate in that it permitted test personnel to change, modify, and/or substitute test methods without any higher supervisory or technical review, and without documenting such changes, modification or substitutions in the test procedure m A ,1 M '/ E IUM W l

Sy -

, .. _ __ _ _

l . ..

, U. S. Nuclear Regulatory Commission i

, A06374/Page 2 March 10, 1987 Root Cause The intent of paragraph 6.4.2.2 of ACP 1.2-6.4, Temporary Procedure Change, Rev. 18, was to allow substitute methods for data acquisition. However, the procedure did not specify the level of review required or the method of documenting substitution.

Resolution / Corrective Action ACP 1.2-6.4 had the following changes made on January 15, 198 . Added the caveat that substitutions could be made only if the substitute instrumentation has equal or better accuracy and adequate range to measure the desired paramete .

Added'that instrument equivalence can be determined only by a Level 2 or higher certified individua . Added that any instrument substitution shall be noted in the applicable portion of the procedur Additionally, the changes made to ACP 1.2-6.4 were reviewed with the Isc Department during a department meetin Copies of these changes were transmitted to the NRC on or about January 15, 198 Actions to Prevent Recurrence The above corrective action will prevent recurrenc Very truly yours,

!

CONNECTICUT YANKEE ATOMIC POWER COMPANY

"

E.60. Mroczka Senior Vice President

cc: Dr. T. E. Murley, Region I Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant P. Swetladd, Resident Inspector, Haddam Neck Plant i