Text
. _ _ _ _
i i
I[p 844 p
o, UMTED STATES l
- .c g
NUCLEAR REGULATORY COMMISSION q
l WASHINGTON, D. C. 2066s r
k..../
October 22, 1990 Docket No. 50-213 l
i Mr. Edward J. Mroczka I
Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
ISSUANCE OF AMENDMENT (TAC NO. 77537)
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-61 for the Haddam Neck Plant,-in response to your application dated August 25, 1990 and supplemented in a letter dated August 29i 1990.
As requested the amendment was reviewed on an emergency basis, i
The amendment will add a footnote to Technical Specification (TS) Table 3.3-2 Item 3, " Auxiliary Feedwater", Table 3.3-3 Item 2 " Steam Line Isolation" and Table 4.3-2 Item 3 " Engineered Safety Features Actuation System Instrumentation Surveillance Requirements." The-footnote would redefine the operability of the auxiliary feedwater (AFW) automatic initiation system as i
l including credit for operator action to' adjust auxiliary feedwater to full t
flow following automatic initiation and reliance on the control air system to ensure successful automatic' auxiliary feedwater initiation.
CYAPC0 has committed to resolve both deficiencies of the AFW automatic initiation system prior to restart for Cycle 17.
The proposed resolution will meet the TMI requirements of Item II.E.1.2, " Auxiliary Feedwater Initiation and Flow Indication" for a fully automatic'and safety grade system.
The NRC staff proposes to meet with CYAPC0 as soon as the design review has been completed for these modifications.
In addition, because of the importance the staff places on the auxiliary feedwater system and the apparent weaknesses of the current AFW system, the staff recommends that CYAPCO-investigate other improvements to improve AFW system reliability (i.e., upgrade of the electric AFW pump).
p P
4.'.
_.,,s
i l-i
. October 22, 1990 A copy of the related Safety Evaluation is also enclosed.
The notice of issuance will be included in the Commissio6's bi-weekly Federal Register notice.
Sincerely, Original' signed by Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.132 to DPR-61 2.
Safety Evaluation cc w/ enclosures:
See next page l
l 5
h b
O f
D.
A 0FC
- PDI-4: LAg.... :. POI-4 : PM
..........(.............. g......:.
- PDI D
- OGC p
- AD:DR 7g gion I
...!..$(( I.........!..![ [b....!
.$........!..'..h.h.k..! $!.[........!..
$p/1/90 i 1 0' # 90
$ 0/7//90
$//
l DATE G/fs/90 p / /90
/ 9
/
f OFFICIAL-RECORD COPY Document Name:
~
i i
Mr. Edward J. Mroczka Haddam Neck Plant &
l Connecticut Yankee Atomic Power Company Millstone Nuclear Power Station, Northeast Nuclear Energy Company Unit No. 1
)
cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Wayne D. Romberg i
Vice President, Nuclear Operations Board of Selectmen Northeast Utilities Service Company Town Hall Post Office Box 270 Haddam, Connecticut 06103 Hartford, Connecticut 06141-0270 Superintendent State of Connecticut Haddam Neck Plant Office of Policy and Management RFD #1 1
ATTN: Under Secretary Energy Post Office Box 127E Division East Hampton, Connecticut 06424 r
80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Plant Richard M. Kacich, Manager c/o U.S. NRC Generation Facilities Licensing East Haddam Post Office Northeast Utilities Service Company East Haddam, Connecticut 06423 Post Office Box 270 Hartford, Connecticut 06141-0270 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy Company ATTN:
Superintendent Millstone Nuclear Power Station P.O. Box 128 Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P.O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385
,r.,.-
.-a,--
~ ~.,,
AMENDMENT NO. 132 TO FACILITY OPERATING LICENSE NO.
i DISTRIBilT ON eM FJ, NRC & Local PDR Plant File S.Varga(14E4)
B. Boger (14A2)
J. Stolz S. Norris A. Wang OGC D.Hagan(MNBB3302)
G. Hill (4)(MNBB 3302)
E. Jordan s
(P1-137)
W. Jones (P-130A)
J. Calvo (11F23)
ACRS (10)
GPA/PA OC/LFMB N. Wagner C. Liang J. Bongarra R. Correia i
f l
~yn r
DFo \\
%s