MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19980061999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination IR 05000213/19980031998-10-14014 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/98-03 Issued on 980821.Ack That Program Improvements for Violations That Occurred During Sys Decontamination,Still in Progress IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970101998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970071997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 IR 05000213/19970031997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19960121997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19962011996-11-0505 November 1996 Ack Receipt of Requesting Schedule Change for pre-decisional EC Re Plant Insp Repts 50-213/96-201, 50-213/96-06,50-213/96-08.Originally Scheduled EC for 961018 Requested to Be Delayed Until Dec 1996 IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls IR 05000213/19960091996-10-10010 October 1996 NRC Operator Licensing Exam Rept 50-213/96-09 During Wk of 960819-24.Exam Results:Six RO & Six SRO Candidates Passed Written & Operating Exams 2024-08-27
[Table view] Category:Letter
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation CY-24-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2024-03-11011 March 2024 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-010, Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2)2023-04-24024 April 2023 Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) CY-23-008, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20222023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-003, And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-009, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20192020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2020-01-22022 January 2020 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report ML19070A0332019-02-20020 February 2019 Letter to C. Pizzella Nuclear Regulatory Commission'S Analysis of Connecticut Yankee Atomic Power Company'S Initial and Updated Decommissioning Funding Plans for the Haddam Neck Plant Independent Spent Fuel Storage Installation CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan 2024-08-27
[Table view] |
Text
November 20, 2007
SUBJECT:
INSPECTION 05000213/2007001, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT
Dear Mr. Norton:
On October 31, 2007, the United States Nuclear Regulatory Commission completed an announced inspection at your Haddam Neck facility. The enclosed report documents the inspection results which were discussed with Mr. G. van Noordennen and other members of your staff on November 13, 2007.
The inspection examined decommissioning activities conducted under your License Termination Plan (LTP), as they related to safety and compliance with the Commissions rules and regulations. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. The report also includes one letter report and two survey reports from the Oak Ridge Institute for Science and Education (ORISE).
Based on the results of this inspection, no violations were identified.
In accordance with Section 2.390 of the NRCs Rules and Practices, Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No response to this letter is required. Your cooperation with us is appreciated.
Sincerely,
/RA/
Raymond Lorson, Chief ber 20, 2007
SUBJECT:
INSPECTION 05000213/2007001, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT
Dear Mr. Norton:
On October 31, 2007, the United States Nuclear Regulatory Commission completed an announced inspection at your Haddam Neck facility. The enclosed report documents the inspection results which were discussed with Mr. G. van Noordennen and other members of your staff on November 13, 2007.
The inspection examined decommissioning activities conducted under your License Termination Plan (LTP), as they related to safety and compliance with the Commissions rules and regulations. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. The report also includes one letter report and two survey reports from the Oak Ridge Institute for Science and Education (ORISE).
Based on the results of this inspection, no violations were identified.
In accordance with Section 2.390 of the NRCs Rules and Practices, Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No response to this letter is required. Your cooperation with us is appreciated.
Sincerely,
/RA/
Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety Docket No. 05000213; ISFSI Docket No. 07200039 License No. DPR-61 Distribution DNMS FSME FSME w/encl: R. Lorson, DNMS T. Smith, FSME D. Screnci, PAO S. Collins, RA G. West, OEDO T. Youngblood, N. Sheehan, PAO M. Dapas, DRA K. McConnell, FSME R. Temps, NMSS B. Holian, DNMS FSME B. Watson, FSME S. Weerakkody, A. Persinko, D. Schmidt, DOCUMENT NAME: C:\FileNet\ML073250040.wpd SUNSI Review Complete: LKauffman After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: C = Copy w/o attach/encl E = Copy w/ attach/encl N = No copy OFFICE DNMS/RI N DNMS/RI NAME Lkauffman RKL RLorson DATE 11/20/07 11/20/07 OFFICIAL RECORD COPY ADAMS ACCESSION NO. ML073250040
Enclosures:
1. NRC Inspection Report No. 05000213/2007001 w/Attachment: Supplemental Information 2. Letter Report for Analysis of 32 Soil Samples Associated with the Connecticut Yankee Facility at Haddam Neck, Connecticut [Inspection Report #05000213/2007001] (RFTA 06-001), dated April 3, 2007 [ADAMS A
REGION I==
INSPECTION REPORT Inspection Nos. 0500213/2007001 Docket No. 05000213 License No. DPR-61 Licensee: Connecticut Yankee Atomic Power Company (CYAPCO)
Facility: Haddam Neck Plant (Haddam Neck)
Location: 326 Injun Hollow Road East Hampton, Connecticut 06424 Inspection Dates: April 23-26, 2007 June 6-7, 2007 July 17, 2007 September 4, 2007 October 29, 2007 Inspectors: Laurie A. Kauffman, Health Physicist, Decommissioning Branch Approved By: Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety
EXECUTIVE SUMMARY
Connecticut Yankee Atomic Power Company
NRC Inspection Report No. 05000213/2007001 The inspection included aspects of decommissioning activities regarding dismantlement and decommissioning of the facility, and storage of spent fuel. The report covers announced safety inspections conducted by one regional inspector. The report includes evaluations of the self-assessment and corrective action program, Independent Spent Fuel Storage (ISFSI) program, decommissioning and final status survey program, radiation protection program, and radioactive waste transportation program. The report also includes one letter report and two confirmatory survey reports by the NRCs contractor, Oak Ridge Institute for Science and Education (ORISE).
Facilities Management and Control
- The CYAPCO staff maintained an adequate self-assessment and corrective action program. (Section 1.1)
- The CYAPCO security personnel maintained an adequate program for surveillance and monitoring of the ISFSI and stored spent fuel. (Section 1.2)
Decommissioning Performance and Status Review
- The CYAPCO staff conducted decommissioning activities in accordance with the approved License Termination Plan (LTP) requirements and adequately implemented sampling and survey procedures and protocols to support the final status survey program. (Section 2.0)
Radioactive Waste Management
- The CYAPCO radiation protection staff implemented an effective program to control and limit occupational radiation exposures. The CYAPCO staff effectively implemented the radioactive waste transportation program. (Sections 3.1 and 3.2)ii
REPORT DETAILS
Summary of Facility Status Haddam Neck is continuing to operate their Independent Spent Fuel Storage Installation (ISFSI). Building demolition activities, soil excavation, debris removal and final status survey activities have been completed.
1.0 Facilities Management and Control 1.1 Self-Assessment and Corrective Action Program
a. Inspection Scope
(IP 40801)
The inspector reviewed Connecticut Yankee Atomic Power Companys (CYAPCO)
License Termination Program (LTP) self-assessment report, SCA-07-01 Review of Final Status Survey (FSS) Release Records for Phase IV, Phase V, and Phase VI, dated March 2007. The inspector also reviewed several condition reports (CRs) for issues related to the FSS program, the safeguards program, the radiation protection program, and the transportation of radioactive waste program.
b. Observations and Findings
No findings of significance were identified.
The inspector noted that the self-assessment program identified strengths and potential areas of declining performance. The CYAPCO staff ensured that the FSS program conformed to the LTP requirements and implementing procedures. The inspector also noted that the program for reporting potential safety issues by generating and entering CRs into the corrective action program for resolution appeared to be effective.
c.
Conclusion The CYAPCO staff maintained an adequate self-assessment and corrective action program.
1.2 Independent Spent Fuel Storage Installation
a. Inspection Scope
(IP 60855)
The inspector reviewed procedures, maintenance and surveillance records, and interviewed selected ISFSI operations personnel. The inspector toured the ISFSI, observed shift rounds, and discussed ISFSI operations with the ISFSI Manager and ISFSI Shift Manager.
b. Observation and Findings No findings of significance were identified.
The inspector noted that the vertical concrete casks were in good material condition, the ventilation openings were unobstructed, and the perimeter fence was intact and properly posted. The inspector verified that the control room systems were operable. The inspector noted that the ISFSI Shift Supervisor (ISS) implemented routine maintenance and surveillance activities in accordance with the associated procedures.
c. Conclusion The CYAPCO security personnel maintained an adequate program for surveillance and monitoring of the ISFSI and stored spent fuel.
2.0 Decommissioning Performance and Status Review 2.1 Inspection of Final Surveys
a. Inspection Scope
(IPs 71801 and 83801)
The inspector reviewed the status of decommissioning activities and the FSS program to confirm that the decommissioning activities were performed in accordance with the LTP. The inspector and the NRCs contractor, Oak Ridge Institute of Science and Education (ORISE), performed independent confirmatory inspections in April and June 2007. Areas inspected included the Emergency Operations Facility (EOF) and the open land area survey units (SU) for Phases IV, V, VI, and VII.
b. Observations and Findings
No findings of significance were identified.
In March 2007, the inspector split two soil samples from the pond and 30 soil samples from discharge canal and sent them to ORISE for independent analysis. The inspector compared these results to CYAPCOs sample results and determined that they were comparable. The inspector noted that both sets of sample results were below the derived concentration guideline levels (DCGLs) listed in the approved LTP. The ORISE soil sample results are contained in the enclosed ORISE report, Letter Report for Analysis of 32 Soil Samples Associated with the Connecticut Yankee Facility at Haddam Neck, Connecticut, dated April 3, 2007. [ADAMS Accession No. ML073120571]
In April and June 2007, ORISE performed confirmatory surveys of the remaining open land area SUs for Phases IV, V, VI, and VII. These confirmatory surveys included surface scans and soil sampling. Also in June 2007, ORISE performed surface scans and surface swipes in the EOF. The details of both confirmatory surveys are contained in the following ORISE reports: Confirmatory Survey Results for the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant, Haddam Neck, Connecticut, dated July 3, 2007, and Revised Confirmatory Survey Results of Open Land Area Survey Units for Phases V, VI, and VII at the Connecticut Yankee Haddam Neck Plant, Haddam Neck Connecticut, dated September 12, 2007, which are enclosed. [ADAMS Accession Nos. ML073120613 and ML073120392, respectively.]
The NRC had completed a review of the final release records for all phases of the CYAPCOs decommissioning process. The results of the surveys were less than the DCGLs specified in the LTP.
c. Conclusion The CYAPCO staff conducted decommissioning activities in accordance with the LTP requirements and adequately implemented sampling and survey procedures and protocols to support the FSS program.
3.0 Radioactive Waste Management 3.1 Radiation Protection
a. Inspection Scope
(IP 83750)
The inspector reviewed CYAPCOs radiation protection program in order to determine the adequacy of the Radiation Protection (RP) program and to assess the capability to monitor and control radiation exposure to employees.
b. Observations and Findings
No findings of significance were identified.
The inspector noted that the RP staff had implemented a free release program, which included conducting surveys of tools and equipment prior to release from the site. The inspector reviewed selected survey records and verified that no detectable activity above background was identified on any tools or equipment prior to release. The inspector noted that field survey instruments were properly calibrated and maintained.
c. Conclusion The CYAPCO RP staff implemented an effective program to control and limit occupational radiation exposure.
3.2 Transportation of Radioactive Waste
a. Inspection Scope
(IP 86750)
The inspector reviewed CYAPCOs program for transportation of radioactive waste to determine whether the radioactive materials were properly packaged, stored, and shipped. The inspector reviewed the radioactive waste shipments, which included dry active waste and low-level radioactive demolition debris. The inspector observed the CYAPCO staff conduct surveys and prepare shipments for transport.
b. Observations and Findings
No findings of significance were identified.
The selected radioactive waste shipment records included completed copies of characterization reports, waste manifest shipping papers, emergency response information, survey record forms, and related documentation (i.e. shipment inspection plans and truck inspection records). The CYAPCO staff met the applicable radiation and transportation requirements for the shipments reviewed.
c.
Conclusion The CYAPCO staff effectively implemented the radioactive waste transportation program.
4.0
Exit Meeting Summary
On November 13, 2007, a summary of the inspection findings for the entire inspection period was presented during a telephone conversation with Mr. G. van Noordennen and members of your staff. The inspector confirmed that proprietary and safeguards information were not included in this inspection report.
- Supplemental Information
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Licensee
- J. Arnold, Executive Staff Assistant
- B. Couture, Project Support Resource Conservation and Recovery Act Coordinator
- R. Haight, Waste Management Coordinator, Decommissioning
- J. Lenois, ISFSI Manager
- R. McGrath, Radiation Protection/FSS Manager
- W. Norton, President and Chief Executive Officer
- C. Newson, Technical Support Supervisor/FSS
- J. Wagner, FSS Supervisor
- D. Roberson Heath Physics Supervisor, FSS
- G. van Noordennen, Director of Regulatory Affairs and Quality Assurance
INSPECTION PROCEDURES USED
40801 Self-Assessment, Auditing, and Corrective Action
60855 Operation of Independent Spent Fuel Storage Installation
71801 Decommissioning Performance and Status Reviews
83750 Occupational Radiation Exposure
83801 Inspection of Final Status Surveys
86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials
ITEMS OPEN, CLOSED, AND DISCUSSED
Opened None
Closed None
Discussed None
LIST OF ACRONYMS USED
CR Condition Reports
CYAPCO Connecticut Yankee Atomic Power Company
DCGL Derived Concentration Guideline Level
EOF Emergency Operations Facility
FSS Final Status Survey
ISFSI Independent Spent Fuel Storage Installation
ISS Shift Supervisor
LTP License Termination Plan
ORISE Oak Ridge Institute for Science and Education
RP Radiation Protection
SU Survey Unit
Attachment