Forwards Safety Insp Rept 50-213/90-12 on 900621-0731. Good Mgt Attention Given to Correction of Deficiencies Identified During Process & Verification That Tech Spec & Procedural Requirements Met Prior to Plant Heatup
ML20059E662
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/28/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20059E663 List:
References
NUDOCS 9009100268
Download: ML20059E662 (2)


See also: IR 05000213/1990012

Text

.

,

, , .

r

-e

JAUG 2 81990

Docket No. 50-213.

Connecticut Yankee-Atomic Power Company

ATTN: Mr. E. J. Mroczka-

Senior Vice President - Nuciaar

Engineering and Operations

P. O. Box 270.

Hartford, Connecticut.06141-0270

Gentlemen:

'

Subject:- NRC Region I Inspection No. 50-213/90-12

This letter transmits the report of the routine resident safety-1nspection.

conducted by Mr. J. Shedlosky and others off this office during the period June

21 to July 31, 1990 at the W.ddam Neck Plant, Haddam Neck, Connecticut.

The

,

report covers activities authorized by NRC License No. DPR-61. The inspection

findings were discussed by Mr. Shedlosky with Mr_. G. Bouchard of 'your_ staff at-

the_ conclusion of theLinspection.

Areas examined during this inspection are. described in the NRC Region I

Inspection Report which -is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representa-

tive' records, interviews with personnel and observations by the inspectors.

This inspection covered the primary plant startup after an extended refueling

and maintenance outage.

The inspectors observed that the startup was

conducted deliberately and cautiously. Good management attention was given.to

the correction of deficiencies identified during the-process and- verification

that Technical Specification and procedural requirements were fully met' prior

L

to commencement of plant heatup.

Your cooperation with us is appreciated.

l

Sincerely,

1

Edward C. Wenzinger, Chief

Projects Brar.ch No. 4

i

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-213/90-12

l

!

l

i

l

02115

0FFICIAL RECORD COPY

IR HN 90 12 - 0001.0.0

08/20/90

1\\

9009100268 900828

{DR

ADOCK 0500

3

y [.~- g/

L

d

. - -

' * '

'

AUG 2 81990

Connecticut' Yankee Atomic-

2

.

Power Company

ec w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations-_

E.~A. DeBarba, Nuclear = Station Director,.Haddam Neck Plant

-G. H. Bouchard, Nuclear-Unit Director, Haddam Neck Plant

.

D. O. Nordquist, Director _of Quality Services

1

R. M. Kacich, Managor, Generation Facilities Licensing

i

Gerald Garfield, Esquire

Public Document Room (PDR),

Local'Public Document-Room (LPDR)

Nuclear. Safety Information Center (NSIC)

.

i

NRC Resident Inspector

State of Connecticut

j

bec w/ encl:

-

,

Region I Docket Room (with concurrences)

Management Assistant, DRMA.(w/o encl)

Section Chief, DRP-

_

J. Caldwell, EDO

r

A.' Wang, NRR/PD I-4

W. Raymond, SRI, Millstone

R. Bellamy, DRSS-

f

R. Winters, DRS

,

bec w/ Report Cover Sheet and Executive Summary only:

C. Hehl, DRP

J.-Wiggins, DRP

W. Hodges, DRS

W. Johnston, DRS

J. Durr, DRS

R. Gallo, DRS

,

M. Knapp, DRSS

R. Cooper, DRSS