1
- o August 14, 1990 Docket No. 50-213 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company P.O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
HADDAM NECK PLANT - NEW SWITCHGEAR ROOM SUPPLEMENTAL SAFETY EVALUATION (TAC No. 65034)
By letter dated June 11, 1990, Connecticut Yankee Atomic Power Company (CYAPCO) commented on the staff's January 22, 1990, Safety Evaluation (SE) on the electrical design of the new switchgear room.
CYAPC0 providea clarifications to certain statements in the staff's SE and provided additional information on changes that have occurred since the initial staff review, We have reviewed l
this. additional information and determined it does not change our original conclusion that the electrical design is acceptable.
A supplemental Safety l
Evaluation is enclosed.
Sincerely,
/s/-
Alan Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION t M et File
- NRC & Local PDRs Plant File S. Varga (14E4)
B. Boger (14A2)
S. Norris A. Wang OGC (for information only)
E. Jordan (MNBB 3302)
ACRS (10)
E. Wenzinger (Region I)
A. Toalston (7E4) 0FC
- LA: PDI-4
- PM:PDI-4 4
."I.
DATE $8/f/90
$8/l)/90 8/I/90 OFFICIAL RECORD COPY Document Name:
HNSSER n 0 0.4 7
)
900513O?25 9cw314 PDR ADOCK 05000213
/
[n P
PDC v
e
- s Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant CC' Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilitics Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations 0; rector of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shediosky, Resident Inspector Haddam Neck Plant E. A. DeBarba, Nuclear Station Director c/o V. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East haddam Post Office RFD 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Nuclear Unit Director Haddam Neck Plant Connecticut Yankee Atomic Power Company RFD ', Post Office Box 127E East riampton, Connecticut 06424 i