IR 05000213/1987015

From kanterella
Jump to navigation Jump to search
Physical Security Insp Rept 50-213/87-15 on 870520-21.No Violations Noted.Major Areas Inspected:Security Plan, Implementing Procedures & Physical Barriers (Protected & Vital Areas)
ML20236K767
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/13/1987
From: Keimig R, Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20236K752 List:
References
50-213-87-15, NUDOCS 8708070243
Download: ML20236K767 (3)


Text

_ _ _ . _ - _ _ - _ _ - -

's.;

i l' ,-

U.S. NUCLEAR REGULATORY COMMISSION  !

l REGION I l Report No. 50-213/87-15 i

Docket No. 50-213 j License No. 'DPR-61 Licensee: Connecticut Yankee Atomic Power Company  :'

P.O. Box 270 Hartford, Connecticut 06101

,

Facility Name: Haddam Neck Plant Inspection At: Haddam Neck, Connecticut Inspection Conducted: May 20-21, 1987 i Type of Inspection: Routine, Announced Physical Security Inspection Inspector : p 7/3 87 W

J Mer G. Ma in, P sic Security Inspector date

/ Inspector-

'

Approved by: 7-/S 8 7 pchard R. Khimig ief, Safeguards date

/ Section Nuckar terials Safety i and Safeguards ranch {

I Inspection Summary: Routine, Announced Physical Security Inspection on l May 20-21, 1987 (Report No. 50-213/87-15) l

)

Areas Inspected: Security Plan and Implementing Procedures and Physical Barriers (Protected and Vital Areas).

Results: The licensee was found to be in compliance with NRC requirements in the areas inspecte PDR ADOCK 05000213 G PDR

_ _ _ - -

2

.

l Details  ;

1. My Persons Contacted Mr. E. DeBarda, Station Services Superintendent l

  • Mr. G. Hallberg, General Services Supervisor
  • Mr. P. Marchese, Security Supervisor Mr. P. Swetland, USNRC Resident Inspector The inspector also interviewed other licensee personnel and members of the proprietary guard forc . Security Plan and Implementing Procedures >

The inspector reviewed the Haddam Neck Plant Physical Security Plan and implementing procedures, including Revision 13 to the Plan submitted February 27, 1987 and additional information submitted on March 10, 1987, in accordance with 10 CFR 50.54(p). No discrepancies were identifie . Physical Barriers - Protected Area The inspector conducted an on-site review of the changes (Revision 13) to the physical barrier at the perimeter of the protected area that had been made to accommodate the construction of a Nuclear Records Facility building additio The changes that were made to the barrier in that area by the licensee were found to have resulted in enhancements in the overall effectiveness of the security progra The inspector was advised that the licensee is contemplating the submittal, in the near future, of a temporary change to the security plan that involves modifications to the protected area barrier to accommodate construction of another new building on site. The modifications to the barrier, the compensatory measures, and other controls to be exercised, will be described by the licensee in a submittal to the NRC under the provisions of 10 CFR 50.54(p).

The inspector observed that all portions of the protected area barrier were maintained in accordance with the licensee's NRC-approved security pla . Vital Area Barriers l The inspector observed that the vital area barriers were maintained in accordance with NRC-approved security plan. Random tests of vital area alarms were requested by the inspector and performed by the license The results of the tests were satisfactory.

l l _ _______ _