ML20246K045
| ML20246K045 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 08/28/1989 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20246K049 | List: |
| References | |
| RTR-NUREG-1021 NUDOCS 8909050353 | |
| Download: ML20246K045 (2) | |
See also: IR 05000213/1989006
Text
g.
'
'
H
s
9
.9
3
,
,,
t } g.:
.
1
,
,
28 AUG 19891
Docket'No. 50-213
Connecticut-Yankee Atomic Power Company
ATTN: Mr.: E. :J. Mroczka
. Senior.Vice President - Nuclear
Engineerig and Operations Group
,
P.-0.LBox 270
LHartford, Connecticut 06141
. Gentlemen:
SUBJECT: .REQUALIFICATION PROGRAM EVALUTATION REPORT NO. 50-213
- 0n May 1 -
- 5, 1989, the NRC administered requalification examinations to
employees of your company who' operate the Haddam Neck Power Plant. -The evalu-
ation was conducted in accordance with Revision 5 (1/1/89), to NUREG-1021,
10perator Licensing Examiner Standards, ES-601,'." Administration of NRC Requali-
fication Program. Evaluations." The evaluation had two purposes, evaluation of-
the effectiveness of the li' censed operator requalification training-program at
. maintaining- the competency of. the licensed operators, and examination of the -
individual operators to determine-if they would satisfy the regulatory require-
ment of passing an NRC~ administered examination prior to license renewal. At
the' conclusion of the examination / evaluation, any generic findings that evolved
as a ' result of the examination were discussed with those members of your staff
identified in:the enclosed report.
As a.~ result of this evaluation, your requalification program has been assigned
~ an overall program rating of satisfactory. As evaluated by the NRC, eleven
of 12 operators passed all parts of the examination. One facility evaluator-
was deemed unsatisfactory in his performance as an evaluator during the conduct
of job' performance. measures. These evaluations were conducted in accordance
- with the criteria of NUREG 1021, ES-601, noted above.
In accordance.with-10 CFR 2.790 of the Commission's regulations, a copy of
this11etter and the enclosure will be placed in the NRC Public Document Room.
Should you have any questions regarding ti.is examination, please contact the
undersigned at 215-337-5291.
! ).s
Sincerely,
Cr$21C"ED
Robert M. Gallo, Chief
Operations Branch
Division of Reactor Safety
t
t-
Enclosure: Requalification Program Evaluation Report No. 50-213/89-06 (OL-RQ)
w/ Attachments I, 2, 3, and 4
L
8909050353 890828
ilf,
ADOCK 05000213
- y:
fNU
__
_ _ _
_ _ - - - -- -----
O
-
- --
_
i
.,-
.
-
Connecticut Yankee Atomic Power Co.
2
.
cc w/ enclosure and Attachments 1, 2, 3, and 4:
D. B. Miller, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Romberg, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enclosure and Attachments 1, 2, 3, and 4:
Region I Docket Room (with concurrences)
Section Chief, DRP
W. Raymond, SRI, Millstone 1&2
A. Wang, LPM, NRR
J. Dyer, EDO
P. Eselgroth, DRS
P. Bissett, DRS
Master Exam File
end
bec w/ enclosure; w/c Attachments 1, 2, 3, and 4:
OL Facility File
bcc w/o enclosure and Attachments 1, 2, 3, and 4:
Management Assistant, DRMA
DRS Files (2)
<
l
-
1
I
D
Bissett/dmg,
E
h
G
d
0lIEl0S
t,t~ (
glztlffi
i,
t
1
0FFICIAL RECORD COPY
BISSETT/H. N. REPORT /8/21/89 - 0002.0.0
!
08/21/89
I
!
i
l
l
_ __- _ _ _ _ _ _ __ - -