Reviews 891227 Response to Generic Ltr 89-10 Re safety- Related motor-operated Valve Testing & Surveillance. Justification Should Be Provided If Initial Testing Program Cannot Be Completed within 5 Yrs or Three Refueling Outages
ML20055F737
Person / Time
Site: Millstone, Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/11/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
GL-89-10, NUDOCS 9007190118
Download: ML20055F737 (3)


Text

___

[@ceog'o,%

i UNITEO STATES NUCLEAR REGULATORY COMMIS$10N f

WASHINGTON,D.C 20sss l

Ouly 11, 1990 Docket Nos. 50-213 50-336 50-423

?

Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering 3nd Operations Connecticut Yankee n omic Power Company

'i i

Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

RESPONSE TO GENERIC LETTER 89-10. " SAFETY-RELATED MOTOR-OPERATED VALVE (MOV) TESTING AND SURVEILLANCE" HADDAM NECK AND MILLSTONE NUCLEAR POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. 75667, 75683, AND 75684)

On December 27, 1989, you submitted a letter in response to Generic Letter 89-10. " Safety-Related Motor-Operated Valve Testing and Surveillance,"

regarding the Haddam Neck Plant and the Millstone Nuclear Power Station.

l Therein, you stated that you are developing detailed programs that will encompass the guidance in the generic-letter and that the precise manner in which the guidance of the generic letter will be addressed will be provided in the motor-operated valve (MOV) programs.

In the generic letter, the NRC staff requested that a description of the

[

generic letter program be available for review by NRC personnel by June 28, 1990, or the first refueling outage after December 28, 1989, whichever is later.

In accordance with this schedule, you indicated that the programs will be available for review by April 1991, December 1990, and January 1991, for Haddam Neck, and Millstone Units 2, and 3, respectively.

The staff does not-object to this schedule for program description availability.

At the public workshops held in September 1989 to discuss the generic letter, the NRC staff indicated the information that should be contained in the program description.

The staff positions on questions presented during the workshops has been issued as a supplement to the generic letter.

With respect to completion of the initial test program, you indicated that the programs-at the Millstone units will be completed by the third refueling outage as recommended in the generic letter.

The initial program for the Haddam Neck Plant, however, might not be completed until the fourth refueling outage, which is scheduled for 1996. While the staff is sensitive to ALARA considerations and your participation in the integrated safety assessment program (ISAP), the staff does not believe that resolution.of this important MOV operability issue should extend beyond the generic letter schedule to any significant degree.

The staff recommends that CYAPCO reconsider the proposed k[0 9007190118 900711 l

PDR ADOCK 05000213 A

[%

I P-PDC 1

= _ - -

l Mr,' Edward J. Mrotzka

  • t schedule.

If the initial program still cannot be completed within recommended five years or three refueling outages, please provide justification for exten'ing J

the schedule in your program description and identify those valves which cannot be tested wiv.hin the staff recommended schedule.

It should also be understood that specific operability rroblems that are identified must be corrected without delay notwithstanding the five year schedule of the generic letter.

Sincerely, f

Y ohn T. Stolz, D rector i

Pro ect Directorato I-4 Di ision of Reactor Projects - I/II ffice of Nuclear Reactor Regulation cc:

See next page i

l l

1

i

  • Mr. Edward J. Mroczka July 11,1990

/

schedule.= If the initial program still cannot be completed within recommended five years or three refueling outages, please provide justification for extending the schedule in your program description and identify those valves which cannot be tested within the staff recommended schedule.

It should also be understood that specific operability problems that are identified must be corrected l

without delay notwithstanding the five year schedule of the generic letter, i

Sincerely,

/s/

' 1 1

John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/II Office of. Nuclear Reactor Regulation cc:

See next page DISTRIBUTION waIniiliiitTfj)ei NRC & Lochi PDRs Plant-File S. Varga (14E4)

B. Boger (14A2)

S. Norris D. Jaffe A. Wang.

G. Vissing OGC E. Jordan (MNBB-3302)

ACRS (10)

E. Wenzinger (Region I)

A. Gody, Jr. (10A19)

J. Stolz TMarsh LA:PDI-4 PM:PDI-4 PM:PDI-4 PM:PDI-4 BC: EMER PD:

4 SNorris*

DJaffe:rc*

GVissing*

AWang*

TMarsh*

JStol-04/06/90 06/05/90 06/06/90 06/08/90 07/9/90

.o}/ll/ 0 w/ comments

  • See previous concurrence DOCUMENT NAME:

T 75667, 683, 684

-.a