November 16, 1990 I
MBoyle
(
50-336
'NRC & Local PDRs DJaffe 50-423 Plant File GVissing SVarga OGC Mr. Edward J. Mroczka BBoger EJordan Senior Vice President ACRS(10)
$Norris Nuclear Engineering and Operations EWenzinger RI RErickson Connecticut Yankee Atomic Power Company DMiller RScholl Northeast Nuclear Energy Company Post Office Box 270 HartforA O nnecticut 06141-0270
Dear Mr. droczka:
SUBJECT:
UNIMPLEMENTED GENERIC SAFETY ISSUES AT HADDAM NECK AND MILLSTONE UNITS 1, 2 AND 3 On April 25, 1990, the staff issued Generic Letter 90-04 which requested information concerning the implementation status of certain generic safety issues (GSis) at your facilities.
Based on your response to this Generic Letter, dated June 27, 1990, our own records and discussions with your staff, we have updated our database on GSI implementation status. The results of this effor+ nre presented to the Commission at a meeting on October 25, 1990.
Enclos# es 1 through 4 to this letter summarize the staff's understanding of the current status of those GSis which remain unimplemented at Haddam Neck and Millstone Units 1, 2 and 3, respectively. We appreciate the assistance you provided in responding to Generit Letter 90-04 and we encourage your timely completion of those GSIs listed in the enclosure.
Please contact me if you have any questions or comments about the enclosed information.
Sincerely,
/S John F. Stolz, Director-Project Directorate I-4 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page P L1-4(is:rmgL U PD PDI-M PDI-4:P Q P
efM ng JStg MBoy)/90 i
11/p 1 ////90 11/
/90 11/fii'90 11/
90 11/\\ /90 t
u)f0{
- n u*oz
,0, n s I
[DR ADOCK 05000213 g
I PDC
)
-~
Fr. Edward J. Mroczka Haddam Neck & Millstone Nuclear Power hortheast Nuclear Energy Company Station Unit Nos. 1, 2 & 3 i
cc:
Gerald Garfield, Esquire R. M. Kacich Manager Day, Berry and Howard Generation Fa,cilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 770 Hartford, Connecticut 06103 3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141o0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environme. ital Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 Ki'ig of Prussia, Pennsylvania 19406 Bradford S. Chase Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Nuclear Station Director W. J. Raymond, Resident inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o V. S. Nucle.ar Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Nuclear Unit Director M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 30 Stott Avenue Waterford, Connecticut 06385 Norwich, Connecticut 06360 Ms. Jane Spector Michael L. Jones, Manager Federal Energy Regulatory Commission Project Management Department 825 N. Capitol Street, N.E.
Massachusetts Municipal Wholesale Room 8608C Electric Company Washington, D.C.
20426 Post Office Box 426 Ludlow, Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher, Esq.
271 South Union Street l
Burlington, Vermont 05402 1
~
^]
' )
Mr. Edward J. Mroczka Haddam Neck & Millstone Nuclear Power Northeast Nuclear Energy Company Station Unit Nos. 1, 2 & 3 H. F. Haynes Nuclear Unit Director J. S. Keenan Nuclear Unit Director MillstoneUnItNo.I t1111stoneUnItNo.2 Northeast Nuclear Energy Company Northeast Nuclear Energy Company Post Office Box 128 Post Office Box 128 Waterford, Connecticut 06385 Waterford, Connecticut 06385 Charles Brinkman, Manager Board of Selectmen Washington Nuclear Operations Town Hall C-E Power Systems Haddam, Connecticut 06103 Combustion Engineering, Inc.
12300 Twinbook Pkwy J. T. Shediosky, Resident inspector Suite 330 Haddam Neck Plant Rockville, Maryland 20852 c/o U. S. Nuclear Regulatory Comission Post Office Box 116 East Haddam Post Office J. P. Stetz, Nuclear Station Director East Haddam, Connecticut 06423 Haddam Neck Plant Connecticut Yankee Atomic Power Company RFD 1. Post Office Box 127E East Hampton, Connecticut 06424 G. H. Bouchard, Nuclear Unit Director Haddam Neck Plant Connecticut Yankee Atomic Power Company RfD 1, Post Office Box 127E East Hampton, Connecticut 06424
~>,.3 x
ENCLOSURE 1 i
3ADDAMNECKGSISTATUS
SUMMARY
Projected Implementation GSI No.
Title Date Remarks 43 (B107) Reliability of Air I
Licensee responded to GL 88-14 l
Systems on 2/17/89. The licensee has notified NRC that the loss of-control air test has been performed this outage and any subsequent potential modifica-tions will be addressed in ISAP.
51 (L913) Improving i
Licensee responded to GL 89-13 the Reliability of on 1/25/90 and staff accepted Open-Cycle SWS response in letter dated 2/23/90. Awaiting second response documenting implemen-tation of GL.
67.3.3 (A017) Improved I
RG 1.97 was evaluated by staff Monitoring with an SE issued on 1/18/90.
Implementation of remaining instrumentation in ISAP.
75 (LOO 3) Salem ATWS E
Issued SE dated 5/27/87 that Item 2.2.2 closed this issue.
However.
licensee is looking at GL 90-03 for applicability.
99 (L817)RCS/RHR
'I Being reviewed in ISAP.
Suction Line Valve Interlock on PWRs B-63 (B045) Isolation I
Being reviewed in ISAP of Low Pressure Systems Connected to the Reactor Coolant System Pressure Boundary Valve Interlock on PWRs l
vM:q ENCLOSURE c' UNIMPLEMENTED GSis AT MILLSTONE 1 Projected Implementation GSI No.
Title bate Remarks 43 Reliability of Air Systems 4/91 Additional testing
)
scheduled for 1991 refueling.
51 Improving the Reliability 4/91 Implementation of Open-Cycle Service Water during 1991 refueling.
Systems 67.3.3 Improved Accident Monitoring TBD Staff to issue SER in December 1990 75 Salem ATWS Item 2.2.2 TBD Awaiting staff review of 9/90 response to GL 90-03.
A-35 Adequacy of Offsite 12/90 Staff to complete Power Systems review by 12/31/90.
Licensee modifica-tions implemented in 1989.
c 4
1
1 ENCLOSURE 3 UNIMPLEMENTED GSIs AT MILLSTONE, UNIT NO. 2 Projected l
Implementation GSI No.
Title Date Remarks 51 Improving the Reliability 11/90 Will be comoleted of Open Cycle Service Water during refueling for System Cycle 11.
67.3.3 Improving Accident TBD Staff is evaluating Monitoring need for excore monitoring.
75 Item 2.2.2 - Vendor TBD Received licensee's (LOO 3)
Interface for Safety submittal.
Related Components 99 RCS/RHR Suction Line Approx.
During refueling Valve Interlock on PWRs 6/92 for Cycle 12 e
.a w
_w-
,--e
-, ~,,
ENCLOSURE 4 UNIMPLEMENTED GSIs AT MILLSTONE UNIT NO. 3 Projected Implementation GSI no.
Title Date Remarks 51 Improving the Reliability I 3/91 NRC Ltr dated 2/22/90 of Open Cycle Service Water accepts licensee schedule System for implementation of GL 89-13 67.3.3 Improved Accident Monitoring I
Addressed by NUREG 1031, Supplement #4 (Section 7.5 and Appendix L) and NRC letter dated 10/11/87. Use of Cat. 3 Sump Temperature instru-mentatics under review.
99 RCS/RHR Suction Line Valve I 11/90 Work to be completed Interlock on PWRs during third refueling.
- outage, t
e l
i l
l
!