.c JUL 2 61990 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN:
Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06141 Gentlemen:
Subject:
Inspection of the Emergency Operating Procedures This letter is to formalize requests made in e, conversation between Mr. Don Ray of your staff and Mr. Jim Prell on July 24, 1990.
This conversation was in regards to a planned inspection of Haddam Neck's Emergency Operating Procedures (EOPs) scheduled from October 9 through October 17, 1990.
It is requested that the plant referenced simulator be made available for evaluation of the effectiveness of the E0Ps as part of the inspection. is a 1:st of reference material that is requested to be provided to the NRC no later than August 15, 1990. is a tentativs ::hedule for the inspection period,
. including the required facility support.
Thank you for your cooperation in this matter. -If you have any questions r
regarding this request, please contact the undersigned at 215-337-5291 or the inspection Team Leader, Mr. Jim Prell at 215-337-5108.
Sincerely, Ort r.inal Signed BYA ROBERT M. GALLO Robert M. Gallo, Chief Operations Branch Division of Reactor Safety
Enclosures:
.As stated l
G,0\\
k a d aN n'n 0FFICIAL RECORD COPY CY E0P LTR - 0001.0.0 900807o046 900726 07/24/90 DR ADOCK 05000213 PDC l
e
' 9; y-Connecticut Yankee Atomic Power Company 2
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations E. A. DeBarba, Station Director (Receives 2.790 Information)
D. O. Nordquist, Director of Quality Services R. M.- Katich, Manager, Generation Facilities Licensing S, E. Scace, Station Director, Millstone Gerald Garfield, Esquire Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Conner',1 cut-bec w/ enc 1:
Region-I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
R. Bellamy, DRSS DRP Section Chief M. Conner, SALP Reports Only J. Shediosky, CRI, Haddam Neck W. Raymond, SRI, Millstone K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports J. Caldwell, EDO A. Wang, PM, NRR R.* Gallo, DRS P. Eselgroth, DRS J. Pre 11, DRS DRS Files (3)
RI: RS RI:DRS 10 P
{c P elgroth
/2V/90 7/a1 /90 07 0
0FFICIAL RECORD C' SPY CY E0P LIR - 0002.0.0 07/24/10 1
l l'l.,
1-i 4
g.;t, m 79 W,.. ;, ;
m q
.,ij g i 'iiE e
r 3
p
(
t k 'I -
t ENCLOSURE 1.
J
+
REFERENCE' MATERIAL: REQUIREMENTS-FOR E0P' INSPECTION y
fl.
. Complete procedure index f
r 12.
Emergency Operating Procedures
'[
p q
- 3.,
Abnormal Operating: Procedures f 4..-
Owners'- Group Emergency ' Response. Guidelines (revision used
+
1for the current E0Ps) j l
- 5.
Procedure. Generation. Package, including:
L a.
Plant-Specific TechnicalTGuidelines' q
b.
Writer.'s Guide t
c.'
JVerif.ication and? validation Program I
d.
-l Training Plan forLtheJEOPs-
- g
'6.
. Deviation document-justifying. differences between the N
.0wners' Group ERGS and the plant specific EOPs.
!r
.7.-
Simulator. Malfunction-BookL 1
i 18.
Lesson plans and simulator scenarios used in the. simulator-
- for' training on the-E0Ds j
3 I
9.,
Procedure _ Users Guide il 1
l10.. Technical Specifications 1
{'j i '
h l
,; 1 w 0FFICIAL RECORD COPY CY E0P LTR - 0003.0.0 07/24/90 R
,s ec s,. _,
4 h
j ENCLOSURE 2 TENTATIVE SCHEDULE AND REQUIRED FACILITY SUPPORT Oct. 9 - Tuesday AM : travel to facility PM - training and badging of inspectors Oct. 10 - Wednesday AM - entrance meeting, resolve initial findings with facility, begin inspection of E0Ps, conduct interviews PM - continue inspection and interviews
- Oct. 11 - Thursday through Oct. 13 - Saturday AM & PM - continue inspection and interviews Oct. 15 - Monday AM - 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> _ simulator preparation PM - observe crew of licensed operators using E0Ps in simulator Oct. 16 - Tuesday AM - observe different crew of licensed operators using E0Ps in simulator.
PM - team wrap up and preparction for working pre-exit.
meeting, pre-exit meeting with licensee to resolve findings and obtain comments-
- 0. '. 17 - Wednesday l
AM1-conduct formal exit meeting with facility management
'M - travel
{
i 0FFICIAL RECORD COPY CY E0P LTR - 0004.0.0 l
- 7/24/90