IR 05000213/1987005

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/87-05 on 870112-16 & 0209-17. No Violations Noted.Response Re Violation Noted in Insp Rept 50-213/86-17 That Util Disclaims Will Be Addressed by Separate Correspondence
ML20207R041
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/02/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20207R042 List:
References
NUDOCS 8703110100
Download: ML20207R041 (2)


Text

_.

y, n s.,.:

k

..

MAR 02IMF Docket / License:

50-213/DPR-61

'

Connecticut Yankee Atomic Power Company-ATTN:

Mr. E. 'J. Mroczka Senior Vice President - Nuclear

.

Engineering and Operations

. P. O. Box 270 Hartford, Connecticut 06101-Gentlemen:

Subject: Haddam Neck Inspection 50-213/87-05 l

This transmits the findings of the NRC follow-up inspection of fire protection

!

deficiencies at the Haddam Neck Plant on January 12-16 and February 9-17, 1987.

The findings.have been discussed with Mr. D. 8. Miller of your staff.

No violations were identified during this inspection and no reply. to this letter is required.

The corrective and preventive actions documented in your letters to NRC Region I-dated July 3, August 19, September 3 (meeting notes) and 26, 1986 and

-

Jaruary 9, 1987 were reviewed during this inspection. Those actions pertained to the findings of Inspection Report 50-213/86-17, forwarded to you by our

-

August 1 and December 10, 1986 letters.

NRC response to your position that one item cited in our letters did not constitute a violation of NRC requirements l

will be addressed by separate correspondence.

i.

Your cooperation with us is appreciated.

Sincerely, Original Signed By:

Edward C. Wenzinger, Chief Projects Branch No. 3 J

Division of Reactor Projects l

Enclosure: Haddam Neck Inspection Report 50-213/87-05 i

'

]

R P

l L

e i

l OFFICIAL RECORD COPY IR HN 87-05 - 0001.0.0 02/19/87

/

__ _ _ _ _ __

_ _ _ _ _ _ _ _ _ _ _ _

__

__

.

.

_.

.

.-

Connecticut. Yankee Atomic.

.

MAR 0 21987

..

h Power Company-cc w/ encl:-

r.

. D.. B.= Miller, Jr., Station Superintendent L

D. O. Nordquist, Manager of Quality Assurance O

R.- M. Kacich, Manager, Generation Facilities ^ Licensing H -

W. D. Romberg, Vice President, Nuclear Operations i

. Gerald Garfield, Esquire Public Document Room (PDR).

Local Public Document Room (LPDR).

(

Nuclear Safety Information Center (NSIC)

.

NRC Resident' Inspector

+

State of Connecticut

.

.bec w/ encl:

l:

Region I Docket Room lL

' Management Assistant, DRMA DRP Section Chief

M. McBride, SRI, Pilgrim T. Rebelowski, SRI, Millstone 1 & 2

,

J. Shedlosky, SRI, Millstone 3

'

F. Akstulewicz, LPM, NRR PA0 (2) Salp Reports Only Robert J. Bores, DRSS C. Anderson, DRS

.

t t

y/[b

.

.

Anderson Mgbe inger 2/lf/87 2/j9/87 2/14/87 2/\\h/87

/

87'

-

0FFICIAL RECORD COPY IR H 8 -05 - 0002.0.0 02/19/87

_

.

__

-. -

.

- -

. -

-. - - -.