CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl
ML20199K472
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/18/1999
From: Mellor R
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199K477 List:
References
CY-99-002, CY-99-2, NUDOCS 9901260425
Download: ML20199K472 (4)


Text

VT

+

?.,

1 ONNECTICUT YANKEE ATO MIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPToN. CT 06424-3099 January 18,1999 Docket No. 50-213 CY-99-002 Re: 10CFR50.90 U. S. Nuclear Regulatory Commission 1 Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant i Response to Request for Additional Information i Prooosed Revision To Technical Soecifications - Seismic Monitorina (TAC MA2050)

Introduction On June 2,1998*, the Connecticut Yankee Atomic Power Company (CYAPCO) submitted a proposed license amendment to relocate requirements for seismic monitoring instrumentation from Section 3/4.3.3.3 of the Technical Specifications to our Technical Requirements Manual. On December 3,19B8,* the Nuclear Regulatory Commission (NRC) requested additionalinformation in support of the proposed license amendment. This letter provides the requested infom1ation.

Discussion i

The guidance of NRC Generic Letter GL 95-10* , states that the Seismic Monitoring i instrumentation may be relocated to the UFSAR, and that subsequent changes may be controlled under 10 CFR 50.59. The staff has approved the relocation of this (1) CYAPCO Letter CY-98-084, from R. A. Mellor, to the U. S. Nuclear Regulatory Commission, " Proposed Revision To Technical Specifications - Seismic Monitoring," dated June 2,1998.

(2) NRC Letter from T. L. Fredrichs, to R. A. Mellor, " Proposed Revision T O\

Technical Specifications - Seismic Monitoring" (TAC No. MA2050)," dated gD December 3,1998.

(3) USNRC Generic Letter 95-10," Relocation of Selected Technical Specifications '

Requirements Related to Instrumentation," dated December 15,1995.

9901260425 990118 pnnon PDR ADOCK 05000213:

W PDR _

l

l. . sP.

i

'. U. S. Nucle:r Regulatory Commission CY-99-002/Page 2 in' format' ion to a Licensee's Technical Requirements Manual (TRM) if the TRM has

. been incorporated into the UFSAR by reference. To satisfy these requirements CYAPCO has incorporated the TRM into the UFSAR by reference in Section 1.6. A copy of the approved FSAR change is included as Attachment 1. CYAPCO has also approved the change to the TRM incorporating the seismic monitoring instrumentation (although this change cannot be implemented until the License Amendment is issued).

A copy of the approved TRM section is included as Attachment 2.

The NRC specific requests are satisfied as follows:

1.b) incorporation of the TRM into the UFSAR by reference. (Commitment CY-99-002-01) 2.b) Submittal of updated pages showing the TRM has been incorporated into the UFSAR. (Attachment 1) 3.b) inclusion of updated and approved pages of the TRM showing how the TS will be relocated. (Attachment 2) 4.a) The existing TS requirements will be relocated to the TRM intact except for the correction of the typographical error consistent with the guidance of Reference 2.

This is as shown in Attachment 2. The TRM will subsequently be modified under 10 CFR 50.59 to correctly reflect the newly installed instrumentation.

(Commitment CY-99-002-02)

The NRC staff has also requested, (T. L. Fredrichs discussion with G. P. van Noordennen on November 19,1998) that CYPACO submit corrected technical specification pages to correctly implement this amendment. These editorial corrections are necessitated as Amendment 193 changed the pages originally submitted with our June 2,1998 letter. The following three pages are included as Attachment 3:

1. Index page VI -incorporating the deletion of the seismic monitoring instrumentation into the page from Amendment 193. (An older TS version was submitted with Reference 1.)
2. TS page 3/4 3-1 incorporating the pagos deleted by this proposed amendment.

(This replaces three pages from our June 2,1998 letter, that were marked "This  !

Page Intentionally Left Blank".)  !

3, TS bases page B3/4 3-2 (Updated to Amendment 193)

Marked up pages from Amendment 193 showing these changes are included in l Attachment 4. The changes in Attachments 3 and 4 were previously reviewed by the l Plant Operations Review Committee and the Nuclear Safety Assessment Board. The previous safety assessment, significant hazards consideration and environmental impact discussions of Reference 1 have not changed due to updating them to Amendment 193.

.2 .. .

l*: U. S. Nucirr Regulatory Commission CY-99-002/Page 3 Commitments The following commitments are included in this letter. Other statements are for information only.

CY-99-002-01 CYAPCO will incorporate the Technical Complete l Requirements Manual into the UFSAR by reference in Section 1.6.

CY-99-002-02 If the proposed license amendment is approved Concurrent with ,

by the NRC staff, CYAPCO will relocate the implementation of seismic monitoring instrumentation License l requirements to the Haddam Neck Plant Amendment Technical Requirements Manual.

If the NRC Staff should have any questions regarding this submittal, please contact  ;

Mr. G. P. van Noordennen at (860) 267-3938.

l l

l Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

h. _

R. A. Mellor l Vice President - Operations and Decommissioning i

l I Attachments cc: H. J. Miller, NRC Region i Administrator T. L. Fredrichs, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region I i E. L. Wilds, Jr., Director, CT DEP Monitoring and Radiation Division  !

Subscribed and sworn to before me A

this & day of Mhuary .1999 l $/MJ/w W Date Commission Expires: 8ecem/er 3/

1 i _

L-(lG r, ,

Docket No. 50-213 CY-99-002 -

Attachment 1 Haddam Neck Plant Proposed Revision To The Technical Specifications Revised UFSAR Section 1.6 January 1999

.