CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors

From kanterella
Jump to navigation Jump to search
Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors
ML20210D426
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/20/1999
From: Mellor R
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210D430 List:
References
CY-99-066, NUDOCS 9907270239
Download: ML20210D426 (2)


Text

,.

I.. . .

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPTON. CT 06424-3099 July 20,1999 Docket No. 50-213 CY-99-066 -

4 i

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 l

Haddam Neck Plant Offsite Material Recovery Plan. Revision 1 The purpose of this letter is to provide Connecticut Yankee e c Power Company's (CYAPCO) revised plan for the recovery of licensed material frorn olfsite locations. The l original recovery plan was developed and issued about a year ago") Since then, CYAPCO has made substantial progress in the recovery of offsite material which originated from the Haddam Neck Plant.

CYAPCO's Material Recovery Plan, Revision 1 is included as Attachment 1. The most significant change is found in Section 5.4.3, "Remediation Acceptance Criteria". This section  ;

incorporates the current methodology for comparing the Cesium-137 levels in survey area l

samples to the background Cesium-137 levels. Other changes are also marked by change i indicators (vertical lines) in the right margin. These changes resulted from comments by )

CYAPCO and the Oak Ridge Institute for Science and Education.

CYAPCO plans to complete the implementation of the plan during the summer of 1999.

However, this completion schedule is contingent upon the support extended by the property owners, weather and certain other factors beyond CYAPCO's control.

(1) CYAPCO letter from R. A. Mellor to the NRC, "Offsite Material Recovery Plans",

dated April 29,1998. ,

I b '1 9907270239 990720 \ >

PDR ADOCK 05000213 ^x W PDR

/

CY-99-066/Page 2 If you should have any questions on the above or the attached plan, please contact Mr. G. P. van Noordennen at (860) 267-3938.

Very truly yours CONNECTICUT YANKEE ATOMIC POWER COMPANY l

C .

\l l h ~

L (L R. A. Mellor T Vice President - Operations and Decommissioning l cc: H. J. Miller, NRC Region I Administrator l T. L, Fredrichs, NRC Project Manager, Haddam Neck Plant i R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Region I E. L. Wilds, Jr., Director, CT DEP Monitoring and Radiation Division

!