Forwards Safety Insp Rept 50-213/90-13 on 900801-0911.Strong Performance Noted in Actions to Resolve Failure of SG Feedwater Regulating Valve on 900807 & 0911
ML20058A633
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/19/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20058A637 List:
References
NUDOCS 9010290042
Download: ML20058A633 (2)


See also: IR 05000213/1990013

Text

Lg

i

..

4

Q

4

OCT 191999

Docket No. 50-213

Connecticut Yankee Atomic Power Company

' ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Ccnnecticut 06141-0270

Gentlemen:

Subject: NRC Region I Inspection No. 50-213/90-13

This letter transmits the report of the routine resident safety inspection

conducted by Mr. J, Shedlosky and Ms. A. Asars of this office during the period

August 1 to September 11, 1990 at the Haddam Neck Plant, Haddam Neck, Connecti-

cut. The report covers activities authorized by NRC License No. DPR-61. The

- inspection findings were discussed by Mr. Shedlosky with Messrs. J. Stetz,

G. Bouchard and D. Ray'of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel and observations by the inspectors.

Strong performance was noted in your actions to resolve the failure of the-

steam generator feedwater regulating valve, in the discovery of potential

problems relating to the automatic initiation of auxiliary feedwater and with

the 480 volt safeguards electrical bus undervoltage device setpoint.

However,

actions following an unsuccessful surveillance test of the "A" emergency diesel

generator on. August 7, 1990, were not aggressive enough to prevent a similar

failure on September 11.

Your cooperation with us is appreciated.

Sincerely,

,

0!EliU1 Sil1D DY

EDWARD C. WENZifiGER

4

. Edward C. Wenzinger, Chief

'

Projects Branch No. 4

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-213/90-13

e .m n

.dh

i*

0FFICIAL RECORD CPY

IR HN 90-13 - 0001.0.0

11/29/80

hh $0$$$[1g

M OI

I

PDC

b

..

4

4

g

Connecticut Yankee Atomic Power Company

2

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

J. P. Stetz, Nuclear Station Director, Haddam Neck Plant

G. H. Bouchard, Nuclear Unit Director, Haddam Neck Plant

D. O. Nordquist, Director of Quality Services

R. M, Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

State of Connecticut

'

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1) .

Section Chief, DRP

J. Caldwell, E00

A. Wang, NRR/PD I-4

W. Raymond, SRI, Millstone

J. Joyner, DRSS

R. Winters, DRS

bec w/ Executive Summary only:

C. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

J. Durr, DRS

L. Bettenhausen, DRS.

M. Knapp, DRSS

R. Cooper, DRSS

J. Stolz, NRR/PD I-4

P)

RI

S:DRF

RI

f

A

Shedlosky/geb_

Hg

jamp

We

nger

10/fi/90

10//@/90

10/f/90

- 4

-

0FFICIAL RECORD CDP

IR HN 90-13 - 0002.0.0

11/29/80