ML20244D145

From kanterella
Jump to navigation Jump to search
Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/88-24
ML20244D145
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/12/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8906160121
Download: ML20244D145 (2)


See also: IR 05000298/1988024

Text

_ -

_ _

,

_ - - - - .

.

__

e t

' 3

.,

+. a, =.

In Reply Refer To: M- '

' Docket:< 50-298/88-24

s.

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager'- Nuclear Support:

P.O. Box 499 -

Columbus, NE -68602-0499

Gentlemen:

.

Thank you for your letter, dated May 22,1989, in response to o'urtletter,

dated April 24, 1989. We have Lno further questions at this time and will.

review your corrective action during a future inspection.

Sincerely.

0%,,a g.,oj,,

E M d. A &

James L. Milhoan, Director

Division _of Reactor Projects

cc:

Cooper Nuclear Station

ATTN: Guy Horn, Division Manager

of Nuclear Operations-

P.O. Box 98

Brownville, Nebraska 68321 *

Kansas Radiation Control Program Director

Nebraska Radiation ' Control _ Program Directorf

v

!

/

O

j'

$pt

Rf I:0PS

er/cjg fC

gfagfiardo

D:DR

LJCallan

fg%i '

V

JLMilhoan-

g h/$/89 0 0/f/89~ 6/p891 (/q/89

.

8906160121 890612 , 8

DR ADOCK0500g8

- _ _ - - _ _ _ - _ - _ _ _

,.

^

.

.

.

{ .

Nebraska Public Power District -2-

bec w/ enclosure:

-

bec to DMB (IE01)

J

bec distrib. by RIV:

RRI R. D. Martin, RA

Section Chief (DRP/C) Lisa Shea, RM/ALF

RPB-DRSS MIS System

RIV File Project Engineer-(DRP/C)- 'j

RSTS Operator DRP l

.

P. O'Connor, NRR Project Nanager (MS: 13-D-18) -l '

l

'

DRS ,

.D.' Hunter +

J. Gagliardo

l

,

o

i

.

1

i

!

j

,

1

t

_. . _ - _ . _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _

_ - - . ._ . _ - _ .

. - . - _ - - .. . _ _ _ _ _ . _ _ _ _

. ..

's - 4.

.

.,

. . ,

" .

GENERAL OFFICE

Nebraska Public Power District

_ . .

""?sfoWa#*"^*nP**"" j

q

%

~

NLS8900184 c g ,

May 22, 1989 I ty . -

- .:' l

,

1

!. MAY 3Il989 .

.

!

U.S. Nuclear Regulatory Commission -

ATTN: Document Control Desk i' j

Washington, DC 20555 j

i

Subject: Response to Inspection' Report 88-24-

Cooper Nuclear Station-

NRC Docket No. 50-298, DPR-46

<

References: 1) Letter from L. J. Callan (NRC) to G.. A. Trevors (NPPD) l

dated April 24, 1989, same subject i

2) Letter from G. A. Trevors (NPPD) to USNRC dated j

December 8,1988, same subject

i

Gentlemen:

!

This letter is written in response to your letter dated April 24, 1989',  :

Reference 1, and revises the District's earlier : response to the . subj ect i

Inspection Report and Notice of Violation, Reference 2. l

!

Following is the statement of the violation and our response in accordance

with 10CFR2.201-

4

Statement of Violation

Failure to Adecuatelv Review Procedure Chanrea l

The Cooper Nuclear Station Technical Speci 12 cation (TS) 6.2.1.B.4.a requires

in part, that the safety evaluations for changes to procedures shall be

reported to and reviewed by the Safety Review and Audit Board to verify that

such actions did not constitute an unreviewed safety question.

Contrary to the above the safety evaluation for changes to normal, abnormal,

maintenance, and emergency operating procedures, which were reviewed by the

Station Operations Review Committee in accordance with TS 6.3.1, 6.3.2, 6.3.3,

and 6.3.4,.were not being routinely provided to the Safety Review and Audit

Board for their required review in meetings No. 115 through 130, dated January.

1987 through September 1988.

This is a Severity Level IV Violation. (Supplement I) (298/8824-02)

~

'

-

d On ,v .s

0 ivvv

IG-M4Q3 '

i -

- Powerful Pride in Nebraska

___ _

  • *

NLS8900184

C ' i ,Pags 2

-

'. -

May 22, 1989

Renson for Violation

The violation occurred as a result of the District's misinterpretation of what

constitutes a safety evaluation for changes to procedures. The District now

agrees that the " Safety Evaluation Applicability review" conducted on every

procedure change constituted a safety evaluation and under CNS Technical i

Specification 6.2.1.B.4.a, these evaluations must be provided to end revicued

by the Df. strict's Safety Review and Audit Board (SRAB).

Corrective Stens Which Have Been Taken and the Results Achieved

Commencing with SORC Meeting S88-154, dated October 13 and 14, 1988 the SRAB

began reviewing procedure change cover sheets completed in accordance with CNS

Procedure 0.4, " Preparation, Review and Approval of Procedures". These cover

sheets include the safety evaluation in question.

Corrective Stens Taken to Avoid Further Violation

As indicated in Reference 2, the District has revised CNS Procedure 0.4 to

clarify the purpose of, and difference between, a preliminary and a detailed

safety evaluation. To avoid further violations in this area, all preliminary

and detailed safety evaluations will be presented to the SRAB for review.

Date When Full Compliance Will be Achieved

Full compliance will be achieved by June, 1989. f

Please contact me if you have any questions regarding this response.

Sincerely, l

i

!

l

i

G. A. Trevors j

Division Manager i

Nuclear Support

CAT /kew:jw

cc: Regional Administrator

USNRC - Region IV

NRC Resident Inspector

Cooper Nuclear Station

- _ _ - _ _ .