a,
=.
+.
M-
In Reply Refer To:
'
' Docket:< 50-298/88-24
s.
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager'- Nuclear Support:
P.O. Box 499
-
Columbus, NE -68602-0499
Gentlemen:
.
Thank you for your letter, dated May 22,1989, in response to o'urtletter,
dated April 24, 1989. We have Lno further questions at this time and will.
review your corrective action during a future inspection.
Sincerely.
0%,,a g.,oj,,
E M d. A &
James L. Milhoan, Director
Division _of Reactor Projects
cc:
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations-
P.O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation ' Control _ Program Directorf
v
!
/
O
fg%i
j'
$pt
Rf
I:0PS
fC
D:DR
V
gfagfiardo
LJCallan
'
JLMilhoan-
er/cjg
g h/$/89
0
0/f/89~
6/p891
(/q/89
.
8906160121 890612
8
,
ADOCK0500g8
DR
,.
- _ _ - - _ _ _ - _ - _ _ _
^
{
.
.
.
.
Nebraska Public Power District
-2-
bec w/ enclosure:
bec to DMB (IE01)
-
J
bec distrib. by RIV:
RRI
R. D. Martin, RA
Section Chief (DRP/C)
Lisa Shea, RM/ALF
RPB-DRSS
MIS System
RIV File
Project Engineer-(DRP/C)-
'j
RSTS Operator
l
.
P. O'Connor, NRR Project Nanager (MS:
13-D-18)
-l
l
'
,
'
.D.' Hunter
+
J. Gagliardo
l
i
,
o
.
1
i
!
j
,
1
t
_.
. _ - _ . _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _
_ - - .
._
. _ - _ .
. - .
- _ - -
.. . _ _ _ _ _ . _ _ _ _
.
..
's -
4.
.
. . ,
.,
"
.
GENERAL OFFICE
Nebraska Public Power District
""?sfoWa#*"^*nP**""
j
_ . .
q
NLS8900184
c
g
,
%
~
May 22, 1989
I
ty .
-
- .:' l
1
,
!.
MAY 3Il989
.
!
.
U.S. Nuclear Regulatory Commission
-
ATTN: Document Control Desk
i'
j
Washington, DC 20555
j
i
Subject: Response to Inspection' Report 88-24-
Cooper Nuclear Station-
NRC Docket No. 50-298, DPR-46
References: 1) Letter from L. J. Callan (NRC) to G.. A. Trevors (NPPD)
l
<
dated April 24, 1989, same subject
i
2) Letter from G. A. Trevors (NPPD) to USNRC dated
j
December 8,1988, same subject
i
Gentlemen:
!
This letter is written in response to your letter dated April 24, 1989',
Reference
1,
and revises the District's earlier : response to the . subj ect
i
Inspection Report and Notice of Violation, Reference 2.
l
!
Following is the statement of the violation and our response in accordance
with 10CFR2.201-
4
Statement of Violation
Failure to Adecuatelv Review Procedure Chanrea
l
The Cooper Nuclear Station Technical Speci 12 cation (TS) 6.2.1.B.4.a
requires
in part, that the safety evaluations for changes to procedures shall be
reported to and reviewed by the Safety Review and Audit Board to verify that
such actions did not constitute an unreviewed safety question.
Contrary to the above the safety evaluation for changes to normal, abnormal,
maintenance, and emergency operating procedures, which were reviewed by the
Station Operations Review Committee in accordance with TS 6.3.1, 6.3.2, 6.3.3,
and 6.3.4,.were not being routinely provided to the Safety Review and Audit
Board for their required review in meetings No. 115 through 130, dated January.
1987 through September 1988.
This is a Severity Level IV Violation.
(Supplement I) (298/8824-02)
~
d On ,v .s
'
-
0
ivvv
IG-M4Q3
i
-
- Powerful Pride in Nebraska
'
___
_
NLS8900184
i ,Pags 2
C '
May 22, 1989
'.
-
-
Renson for Violation
The violation occurred as a result of the District's misinterpretation of what
constitutes a safety evaluation for changes to procedures.
The District now
agrees that the " Safety Evaluation Applicability review" conducted on every
procedure change constituted a safety evaluation and under CNS Technical
i
Specification 6.2.1.B.4.a, these evaluations must be provided to end revicued
by the Df. strict's Safety Review and Audit Board (SRAB).
Corrective Stens Which Have Been Taken and the Results Achieved
Commencing with SORC Meeting S88-154, dated October 13 and 14, 1988 the SRAB
began reviewing procedure change cover sheets completed in accordance with CNS
Procedure 0.4,
" Preparation, Review and Approval of Procedures".
These cover
sheets include the safety evaluation in question.
Corrective Stens Taken to Avoid Further Violation
As indicated in Reference 2,
the District has revised CNS Procedure 0.4 to
clarify the purpose of, and difference between, a preliminary and a detailed
safety evaluation.
To avoid further violations in this area, all preliminary
and detailed safety evaluations will be presented to the SRAB for review.
Date When Full Compliance Will be Achieved
Full compliance will be achieved by June, 1989.
f
Please contact me if you have any questions regarding this response.
l
Sincerely,
i
!
l
i
G. A. Trevors
j