Forwards IE Insp Repts 50-416/81-28 & 50-417/81-12 on 810721-24.No Noncompliance Noted
ML20005B693
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/06/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20005B694 List:
References
NUDOCS 8109010241
Download: ML20005B693 (2)


See also: IR 05000416/1981028

Text

r

kbp1)

~.

~.

!

AUG 0 61981

-

b

%

b-A

p

Mississippi Power and Light Company

ig

ATTN: Mr. N. L. Stampley

-

ggg g l ygg1,, g

Vice President of Production

Q M TM** y

P. O. Box 1640

.2, ..

Jackson, MS 39205

,.4

\\b

s.

Gentlemen:

4

-.

_

.

Subject: Report NosQ-416 c i

and 50-417/81-12.

This refers to the routine a;et/ inspection conducted by Mr. T. D. Gibbons of

this office on July 21-24.

4,

of activities authorized by NRC Construction

Permit Nos. CPPR-118 and Cr A.-119 for the Grand Gulf facility and to the discus-

sion of our findings held with Mr. G. B. Rogers, Jr. , Site Manager, at the

conclusion of the inspection.

Areas ex, mined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of tSis

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of you inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter nas been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a rew due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

!

information which identifies the document. or pac t thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a se,arate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

g

_

68 'l

8109010241 010906

PDR ADOCK 05000416

G

PDR

__

_

_

_

_

_

. . _

_,.

..

o.

AUG 0 6198;

Mississippi Power and Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/s/

P. J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure: Insoection Report Nos.

50-416/81-28 and 50-417/81-12

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII)$n

Af2

RII

RII

RII

RII

'

,

Af

[

4

.

TDGibbons:aw

TEConlon

C

rp y

AFGibson

PJK logg

ff/ /81

/81

'[J0f/ [/81

/81

01/0181

4

,