ML20042E737

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-416/OL-89-01 Administered During Wks of 891113 & 27
ML20042E737
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/16/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cottle W
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20042E738 List:
References
NUDOCS 9005030020
Download: ML20042E737 (2)


Text

[

~

lt-April 16., 1990 i

System Energy Resources Inc.

l ATTN: Mr. W. T. Cottle i

Vice President.

p Nuclear Operations

?

Grand Gulf Nuclear Station i j P. O. Box 469 Port Gibson, MS 39150 l

Gentlemen:

SUBJECT:

GRAND GULF REQUALIFICATION EXAMINATION REPORT 416/0L-89-01

(

1 1 The NRC administered examinations during the weeks of November 13 and 27 1989, to employees of your company who currently hold licenses to operate the

)

Grand Gulf Nuclear Station.

At the conclusion of the site visit, preliminary i

findings were discussed with those members of your staff-identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided in Enclosure 2.

Comments made by your training staff concerning the accuracy of some of the answers to questions in the written. examination are l

contained in Enclosure 3.

Copies of the written examinations ~and answer keys are included in this report as Enclosure 4.

A Requalification Program Evaluation is included as Enclosure 5.

This Evalua-tion Report finds that the Grand Gulf requalification program is satisfactory based upon performance of the licensed operators on this examination.

Included in this evaluation are any identified operator weaknesses or program areas f

needing improvement.

These concerns have been discussed with your training staff.

A Simulation Facility Fidelity Report is provided in this report as Enclosure 6.

In accordance with 10 CFR 2.790(a) of the Coninission's regulations, a copy of this letter and Enclosures 1, 3, 4, 5, and 6 will be placed in the NRC's Public Document Room. is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, (0RIGINAL SIGNED BY P. KELLOGG FOR)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

(See page 2)

(f Y006030020 900416 PDR ADOCK 05000416 V

PDC T

7

b System Energy Resources, Inc.

2 April 16, 1990

Enclosures:

1..

Examination Repcrt No. 50-416/0L-89 2.

Requalification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.

Facility Coments on Written Exam Items 4.

R0/SRO Examination and Answer _ Keys 5.

Requalification Program Evaluation Report-6.

Simulation Facility Fidelity Report cc w/encls 1, 2, 5, and 6:

C. R. Hutchinson, General Plant Manager cc w/encls 1, 2, 3, 4, 5, and:6:

W. M. Shelly, Site Training Director cc w/ encl 1:

State of Mississippi bec w/encls 1, 3, 5 and 6:

L. Kintner, NRR F. Cantrell, DRP E. Merschoff, DRS C. Christiansen, Senior Resident Inspector-G. Hopper, DRS bec w/encls=1, 5-and 6:

Operator Licensing Branch, DLPQ:NRR bec w/encls 1, 3, 4, 5, and 6:

'lbocumentlCo'ntroEDeskyn i

RII:Dh RI RS RII:DRS RII Olh

)Y fd n

t ne GBeto&udte \\#Cantrell T

es 4/g/90 443 /90 4/@/90 4 g/90

.. - -