ML20005B693
| ML20005B693 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/06/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20005B694 | List: |
| References | |
| NUDOCS 8109010241 | |
| Download: ML20005B693 (2) | |
See also: IR 05000416/1981028
Text
r
kbp1)
~.
~.
!
AUG 0 61981
-
b
%
b-A
p
Mississippi Power and Light Company
ig
ATTN: Mr. N. L. Stampley
-
ggg g l ygg1,, g
Vice President of Production
Q M TM** y
P. O. Box 1640
.2, ..
Jackson, MS 39205
,.4
\\b
s.
Gentlemen:
4
-.
_
.
Subject: Report NosQ-416 c i
and 50-417/81-12.
This refers to the routine a;et/ inspection conducted by Mr. T. D. Gibbons of
this office on July 21-24.
4,
of activities authorized by NRC Construction
Permit Nos. CPPR-118 and Cr A.-119 for the Grand Gulf facility and to the discus-
sion of our findings held with Mr. G. B. Rogers, Jr. , Site Manager, at the
conclusion of the inspection.
Areas ex, mined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of tSis
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of you inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter nas been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a rew due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
!
information which identifies the document. or pac t thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a se,arate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
g
_
68 'l
8109010241 010906
PDR ADOCK 05000416
G
__
_
_
_
_
_
. . _
_,.
..
o.
AUG 0 6198;
Mississippi Power and Light Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
P. J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure: Insoection Report Nos.
50-416/81-28 and 50-417/81-12
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
RII)$n
Af2
RII
RII
RII
RII
'
,
Af
[
4
.
TDGibbons:aw
TEConlon
C
rp y
AFGibson
PJK logg
ff/ /81
/81
'[J0f/ [/81
/81
01/0181
4
,