ML20136H196

From kanterella
Revision as of 00:42, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Certain Review Costs Associated W/Unit 1 Inadvertently Charged to Unit 2.Revised Bill Encl Which Replaces Bill D0192.Payment Due Date Extended 15 Days from Date Shown on Bill.Documentation Supporting Fees Encl
ML20136H196
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/14/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Dale L
MISSISSIPPI POWER & LIGHT CO.
References
NUDOCS 8508200225
Download: ML20136H196 (4)


Text

-.

.. ~~

(

i AUG.141985 s

Docket Nos. 50-416-and 50-417 i

+

Mississippi Power & Light Company ATTN: Mr. L. F. Dale, Director i

Nuclear Licensing & Safety Department P.O. Box.1640 Jackson, Mississippi 39215-1640 Gentlemen:

On June' 16,1982, the NRC issued NPF-13 to your Company authorizing the operatica of Grand Gulf Unit No. I at 5%. As required by_10 CFR 170.21 of the March 23, 1978 regulations, an operating license fee of $1,024.500 was paid by you upon issuance of the initial license. The license was amended on August 31, 1984, to authorize full power (100%) operation. In i

accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the operating license (i.e., full power. license) s i

have been reviewed and they substantially exceed the maximum fee of $1,024,500 j

prescribed by the Cossiission's regulations. Since the maximia fee required by i

l 10 CFR 170 has been paid, no additional operating license fee is required for i

Grand Gulf Unit No.1.

On February 15, 1985, the Commission issued Bill No. 00192 in the amount of 4

$1,032,937 for professional staff review time through June 23, 1984, and contractual support costs through May 31, 1984, expended in the operating license review of Grand Gulf Unit No. 2.

In the NRC internal verification i

of costs it was found that certain review costs associated with Grand Gulf i

i -

Unit No. 1, costing $307,594 were charged to Grand Gulf Unit No. 2 when they should have been charged to Grand Gulf Unit No. 1.

Accordingly a new bill has been issued for Unit 2. It is for $725,343 and replaces Bill No. D0192. The payment due date has been extended 15 days from the date i

shown_on the enclosed bill. This debt owed the Government should be paid before the due date expires to avoid interest charges.

If it is not paid on or before the due date. interest from the date of the original bill becomes due and payable, l

I 8508200225 850814

' ~~

PDR-ADOCK 05000416 I

o me>

P PDR

. SUNNAME >

7 j;

pare >

rme ror.u na no-somacu ouo -

OFFICIAL F2ECORD COPY.

-g, y

/

..?

AUS 14 3WE Mississippi Power & Light Company Enclosed for your information is a copy of the "NRC Procedures for Reviewing Disputed License Fee Billings" and a copy of the NRR activity codes which define review activities.

If you have any questions, concerning the above, please contact us.

Sincerely, i

. Original Signedby wm. o.muer Willian 0. Miller. Chief License Fee Management Branch Office of Administration

Enclosures:

1.

Revised Bill 2.

Documentation Supporting Fees 3.

Procedures 4.

NRR Activity Codes DISTRIBUTION w/ Encl. 1:

PDR LPDR JWRoe, ED0 PGNorry, ADM MLSpringer, ADM RSmith, OELD JFunches, NRR LSolander, NRR GJohnson, RM/A RRakowski, RM/A MRodriguez, RM/A LKintner, LB-4 MDuncan, LB-4 WOMiller LFMB CJHolloway, LFMB RMDiggs, LFMB-atory Docket Files MB Grand Gulf 1/2 A/M Files (w/Encis, 1 & 2)

LFMB Reactor Files-LFMB R/F' n fclt3W Dn A3g.Emff..,,RMagg... LM,:ADM OFFICE >

$"=#

boy

.8 Smith......

,,8Ra kpws ki,,,,,WOM111er,,,

^">,8/,,/9J... 8/.W/85,,,,,,8/,7,/85,,,,,p/ 4, /gs.,

i NRC FORM 318 (10 80) NHCM O240 OFFICIAL RECORD COPY

Pe= age a:LL sevesotampse en remercance A BILL FOR COLLECTION REVISED 00192 MAKE CHECKS PAY ASLE TO 1HE U $ tvCLE aa af GUL ATORY COMulS$10% AND Walt To sill Datt U.S. NUCLEAR REGULATORY COMMISSION August 14. 1985 OFFICE OF RESOURCE MANAGEMENT PAYMENT DUE DaTE DIVISION OF ACCOUNTING AND FINANCE August 29. 1985 WASHINGTON.DC 20655 Licenst wuwetatst appi, cab /e/

TD:

a f ' t R E NC E NUM e t a ist spaticabdel Mississippi Power & Light Company l

Attn: Mr. J. B. Richard CONTACTe Sr. Vice President, Nuclear P.O. Box 23054 Janet M. Rodriguez Jackson, MS 39205

'"'*"E g juuusta 301 492 4200 DE SC RIPTION AMOUNT Operating License Review for Grand Gulf 2

$725,343.00 f

NOTE: THE DUE DATE CAN BE EXTENDED ONLY IF A REQUEST FOR REVIEW STATING WHY THE DEBT IS INCORRECT IN ACT OR IN LAW IS RECEIVED BY NRC BEFORE THE DUE DATE.

10 CFR 15.31,170.51.

i AMOUNT DUE fs. r,umi

$725,343.00

l TE RMS.

Interest wil accrue from the bill date at the annual rate o, 9.00 s,,,c,p, th., no in,,,,,,,ii, de en.,,,o i, the,moun, o, i, paid in full by the payment due date.

I k

NOTE.

The NRC debt collection regulations are found in 10 CFR 15 and are based on the Federal Claims Collection Act as amended by the Debt i

Collection Act of 1982. If there are any questions about the existence or amount of the debt, refer to these regulations and statutes,or contact the individual named above. The revocation of a license does not waive or effect any debt then due the NRC from the licensee.

PRESENT AND SEPARATED EMPLOYEES:

The attached Notia of Due Process Rehts applies to both current and former employees.

b

/h

r r

Mississippi Power 8 Light Company

~

Operating License Review Costs Through June 23, 1984 FACILITY: Grand Gulf 2 DOCKET NO.: 50-417 Costs Per Professional Program Office Professional Sta ff-hours staff-hour Contractual Total Review

_ Sta ff-hour

_ Expended Costs Costs Costs 1.

NRR

$39 1.900.0 574.100

$805,167 5879.?C-2.

IE-HQ 36 52.0 1,8 72 1,E7; 3

REG 10NS 36

',618.8 3

130,277 130,277 4.

ACRS 50 203.0 10,150 10,150 5.

NMSS 38 299.25 11,371 11,371

?

Total Cost: 31.032,937 Less 8/85 Correction:

-307,594 i

Total Due:

5725,343*

  • (See 8/14/85 Letter and its attached documentation accompanying revised Bill 0 e

.r..

-