ML23110A014
Letter Sequence Meeting | |
---|---|
EPID:L-2023-SLE-0000, Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 (Approved, Closed) | |
Initiation Questions
| |
MONTHYEARL-MT-23-001, Application for Subsequent License Renewal Appendix E - Applicant’S Environmental Report2023-01-0909 January 2023
[Table View]Application for Subsequent License Renewal Appendix E - Applicant’S Environmental Report Project stage: Request PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application Project stage: Meeting ML23110A0132023-03-14014 March 2023, 22 March 2023, 18 April 2023, 1 May 2023 Public March 22 Public Meeting Summary Project stage: Request ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 Project stage: Request PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application Project stage: Meeting ML23108A3132023-04-18018 April 2023 March 22, 2023, Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting Transcript Project stage: Meeting ML23110A0152023-05-0101 May 2023 Summary March 22, 2023, Monticello Units 1 Subsequent License Renewal Application Public Environmental Scoping Meeting Project stage: Meeting ML23115A4382023-05-0101 May 2023 March 29, 2023, Meeting Summary for Environmental Review of Subsequent License Renewal Application for Monticello Nuclear Generating Plant, Unit 1 Project stage: Meeting ML23110A0142023-05-0101 May 2023 Memo March 22, 2023, Monticello Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting Project stage: Meeting ML23047A1182023-06-0202 June 2023 Notice of Intent to Conduct Scoping Process and Prepare an EIS Project stage: Other ML23199A2802023-07-0303 July 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application Wright and Sherburne Counties, Minnesota Project stage: Request ML23215A1312023-08-0909 August 2023 – License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Project stage: Approval ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs Project stage: Other ML24059A3292024-03-18018 March 2024 Scoping Summary Report Cover Letter Project stage: Other ML24059A2882024-03-18018 March 2024, 31 March 2024 Scoping Summary Project stage: Request ML24059A3422024-03-31031 March 2024 Scoping Summary Report Project stage: Request NRC-2023-0031, Comment (5) of Diane and Jim Schrack on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Northern States Power Company-Minnesota; Monticello Nuclear Generating Plant, Unit 12024-05-29029 May 2024 Comment (5) of Diane and Jim Schrack on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Northern States Power Company-Minnesota; Monticello Nuclear Generating Plant, Unit 1 Project stage: Request ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR Project stage: Other 2023-05-01 |
ML23110A014 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 05/01/2023 |
From: | Jessica Umana NRC/NMSS/DREFS/ELRB |
To: | Tanya Smith NRC/NMSS/DREFS/ELRB |
Shared Package | |
ML23110A013 | List: |
References | |
EPID L-2023-SLE-0000 | |
Download: ML23110A014 (2) | |
Similar Documents at Monticello | |
---|---|
Category:Meeting Summary
MONTHYEARML24143A1832024-05-23023 May 2024
[Table view]Summary of the May 07, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML24039A1802024-02-23023 February 2024 January 29, 2024 Teleconference Between the U.S. Nuclear Regulatory Commission and Xcel Energy ML23313A1592023-11-0909 November 2023 U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticellos Condensate Backwash Receiving Tank Fatigue Evaluation ML23275A0222023-10-0505 October 2023 Summary of September 21, 2023, Public Meeting with Northern States Power Company Regarding Proposed License Amendment Request to Revise the Pressure Temperature Limits Report ML23200A2602023-07-20020 July 2023 Summary of July 14, 2023, Public Meeting with Northern States Power Company Regarding Proposed Alternative to Defer Periodic Verification Testing of Reactor Water Clean-Up Inboard Isolation Valve ML23157A0432023-06-0808 June 2023 Summary of Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML23115A4382023-05-0101 May 2023 March 29, 2023, Meeting Summary for Environmental Review of Subsequent License Renewal Application for Monticello Nuclear Generating Plant, Unit 1 ML23110A0142023-05-0101 May 2023 Memo March 22, 2023, Monticello Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting ML23115A4642023-05-0101 May 2023 Summary, March 29, 2023, Monticello Units 1 Subsequent License Renewal Application Public Environmental Scoping Meeting ML23110A0152023-05-0101 May 2023 Summary March 22, 2023, Monticello Units 1 Subsequent License Renewal Application Public Environmental Scoping Meeting ML23074A1212023-04-0303 April 2023 March 8, 2023, Summary of Public Meeting with Northern States Power Company Regarding Monticello Nuclear Generating Plant Alternative Request PR-08 to Defer Quarterly Testing of Components of High Pressure Coolant Injection System ML22292A0122022-10-24024 October 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022 ML22208A2192022-08-0303 August 2022 Summary of July 25, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment to Adopt Advanced Framatome Inc. Methodology for Determining Core Operating Limits for Monticello Plant ML22208A1952022-08-0303 August 2022 Summary of July 26, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Alternative Request for Excess Flow Check Valves at Monticello Nuclear Generating Plant ML22130A7172022-05-10010 May 2022 Summary of the May 3, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML22084A3852022-03-31031 March 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application on March 15, 2022 ML22032A0112022-02-0303 February 2022 Summary of January 27, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned Relief Request to Test Excess Flow Check Valve ML21285A0312021-10-15015 October 2021 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to Planned License Amendment to Extend Allowed Outage Time for Fuel Oil Storage Tank for Monticello Nuclear Plant ML21167A1842021-06-16016 June 2021 Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21098A0742021-04-13013 April 2021 Summary of March 25, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Adopt Advanced Framatome Methods ML21040A4612021-02-11011 February 2021 Summary of February 3, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Combine the Emergency Plans and Create a Common Emergency Operations Facility ML20281A5092020-10-16016 October 2020 Summary of October 2, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Amendment to Revise the Safety Limit Minimum Critical Power Ratio for Monticello Nuclear Generating Plant ML20218A4462020-08-0505 August 2020 Summary of the July 16, 2020 Public Outreach to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML20077L8312020-03-20020 March 2020 Summary of February 27, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment to Adopt TSTF-505 Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML19130A1672019-05-14014 May 2019 May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 ML18046B2072018-02-26026 February 2018 Summary of February 8, 2018, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Exemption from Fire Protection Requirements at Monticello Nuclear Generating Plant Units 1 and 2 ML17353A0242018-01-0202 January 2018 Summary of December 12, 2017, Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-425 ML17341A1292017-12-11011 December 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Changes to the Security Plans at the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17300A0362017-10-31031 October 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Emergency Diesel Generator Technical Specifications ML17270A0072017-09-29029 September 2017 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control ML17235B1542017-08-23023 August 2017 July 11, 2017,Summary of the Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Monticello ML17090A2442017-04-0606 April 2017 Summary of February 28, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on the Integrated Leak Rate Test License Amendment Request for Monticello Nuclear Generating Plant CAC No. MF7359) ML17034A1202017-02-0909 February 2017 Summary of January 24, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Revision to the Emergency Action Level ML16334A0112016-12-0606 December 2016 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Exemption Request from Fire Protection Requirements ML16172A0662016-06-20020 June 2016 Summary of the May 26, 2016, Monticello Public Meeting ML15271A2072015-10-0202 October 2015 July 9, 2015 Summary of Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S, Nuclear Regulatory Commission and Northern States Power Company- Minnesota to Discuss Flood Analysis Associated with Monticello Nuclear ML15195A4472015-08-0505 August 2015 Summary of Public Meeting with Xcel Energy and Areva to Discuss Changes to the Proposed Technical Specifications and COLR in Support of the Areva Extended Flow Window License Amendment Request ML15093A2342015-04-0303 April 2015 Summary of Monticello Public Meeting ML14297A1272014-10-31031 October 2014 Summary of October 1, 2014, Public Meeting with NSPM and Areva to Discuss Areva Fuel Transition License Amendment Request and Future License Amendment Application Regarding Use of Areva Atrium 10XM Fuel in Extended Flow Window Domain ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14153A0252014-06-20020 June 2014 Meeting Summary - Public Meeting on May 16, 2014, to Discuss Xcel Energy'S Flood Hazard Reevaluation Extension Request for the Monticello and Prairie Island Nuclear Generating Plants ML14168A0182014-05-16016 May 2014 Xcel Energy Responses to NRC Questions Regarding Flood Hazard Reevaluation Report Extension Requests ML14111A0352014-04-21021 April 2014 Summary of Monticello Public Meeting to Discuss the 2013 Annual Assessment Results ML13351A3422013-12-30030 December 2013 December 4, 2013 Summary of Public Meeting with Northern States Power Company of Minnesota to Discuss the Future License Amendment Application Regarding the Use of Areva Atrium 10XM Fuel in Extended Flow Window Operating Domain ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13169A0352013-06-14014 June 2013 Email Miller to Wilson Summary of Call with Monticello Flooding Audit ML13135A0312013-05-31031 May 2013 Summary of May 3,2013, Conference Call with Northern States Power Company - Minnesota (NSPM) to Discuss Application of 10 CFR 26.205(d)(6) During the Current Refueling Outage ML12338A0062012-12-13013 December 2012 November 20, 2012, Summary of Public Meeting with Northern States Power Company of Minnesota to Discuss the Extended Power Uprate Gap Analysis ML12188A2582012-07-20020 July 2012 Summary of Meeting with Monticello Regarding a Future Amendment to Approve Use of Areva Atrium 10XM Fuel ML12093A4772012-05-0101 May 2012 April 2, 2012, Summary of Meeting with NSPM to Discuss Issue Related to Containment Accident Pressure Credit for Extended Power Uprate Operation 2024-05-23 Category:Memoranda MONTHYEARML24192A2452024-10-0909 October 2024
[Table view]Memo Meeting Summary Monticello Draft Environmental Impact Statement Monticello Public Meetings ML24039A1802024-02-23023 February 2024 January 29, 2024 Teleconference Between the U.S. Nuclear Regulatory Commission and Xcel Energy ML23332A1652023-11-30030 November 2023 – Second Limited Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML23313A1592023-11-0909 November 2023 U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticellos Condensate Backwash Receiving Tank Fatigue Evaluation ML23110A0142023-05-0101 May 2023 Memo March 22, 2023, Monticello Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting ML23115A4382023-05-0101 May 2023 March 29, 2023, Meeting Summary for Environmental Review of Subsequent License Renewal Application for Monticello Nuclear Generating Plant, Unit 1 ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML22292A0122022-10-24024 October 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022 ML22084A3852022-03-31031 March 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application on March 15, 2022 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21055A7342021-03-25025 March 2021 Memo to File (EA-FONSI) ML20218A4462020-08-0505 August 2020 Summary of the July 16, 2020 Public Outreach to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML20022A1982020-01-17017 January 2020 Summary of the Public Open House to Discuss NRC Activities and the 2018 End-of-Cycle Performance Assessment ML18319A2462018-12-0707 December 2018 TSTF-425 Electronic Audit Summary (181115) ML18067A0062018-03-12012 March 2018 Forthcoming Closed Meeting with Northern States Power Company Related to Security Plan Changes at Monticello Nuclear Generating Plant ML17089A1502017-03-30030 March 2017 Memo to A. Hsia Summary of March 2, 2017, Meeting with Xcel Energy to Discuss Xcel Energy'S Proposed Exemption Request for Dry Storage Nuhoms Canisters, Numbers 11-15 at the Monticello Nuclear Generating Plant (W/Enclosure 1: Attendance Lis ML16159A2182016-06-0808 June 2016 Memorandum to C. Bladey Notice of Availability of Exemption for Xcel Energy, Monticello Nuclear Generating Plant, Independent Spent Fuel Storage ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15127A5692015-05-0707 May 2015 Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) ML15105A0142015-04-22022 April 2015 Request for Additional Information: Monticello Nuclear Generating Plant Physical Security Plan Revision 14 L-MT-14-104, Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information2014-12-16016 December 2014 Withdrawal of Exemption Request for Dry Shielded Canisters 11 - 16 Due to Nonconforming Dye Penetrant Examinations, Supplemental Information ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML13204A3182013-11-13013 November 2013 Federal Register Notice Regarding the ACRS Power Uprates Subcommittee Meeting, December 3, 2013 ML13154A4702013-06-0404 June 2013 Rai'S Following Ifib Analysis 2013 Decommissioning Funding Status Report for Prairie Island 1 and 2 and Monticello ML12311A3342012-11-0707 November 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota to Discuss the Monticello Nuclear Generating Plant Extended Power Uprate Review ML12174A1562012-06-28028 June 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota (NSPM) to Discuss the Licensee'S Future Proposed Amendment Regarding Transition to Areva Astrium 10 Xm Fuel ML11356A2082011-12-30030 December 2011 Notice of Meeting with NSPM to Discuss a Future Proposed Amendment Regarding Revised Fuel Storage Criticality Analysis ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0932302042009-11-20020 November 2009 Notice of Meeting with Northern States Power Company to Discuss Issues Related to a Future Application for Amendment to Use the Maximum Extended Load Line Limit Analysis Plus (Mella+) Methodology ML0927303492009-09-30030 September 2009 Task Interface Agreement (TIA) - Unacceptable Preconditioning of Safety-Related Pressure Switches During Required Surveillance Testing at Monticello (TIA 2009-006) ML0826310122008-09-18018 September 2008 Special Inspection Charter for Loss of Normal Offsite Power to Non-Safety Buses and Resultant Reactor Scram on 9/11/2008 ML0813005872008-05-0909 May 2008 Notice of Meeting with Nuclear Management Company to Discuss the March 31, 2008, License Amendment Application for Extended Power Uprate for Monticello Nuclear Generating Plant ML0811302612008-04-25025 April 2008 Meeting Notice with Nuclear Management Co., to Discuss the 03/31/08 License Amendment Application for Extended Power Uprate for Monticello ML0811306982008-04-0707 April 2008 Notice of Meeting Cancellation with Nuclear Management Co., to Discuss the 03/31/2008 License Amendment Application for Extended Power Uprate for Monitcello ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0627604432006-10-31031 October 2006 Renewal of Full-Power Operating License for the Monticello Nuclear Generating Plant - Memo to Chairman and Commissioners from L. Reyes ML0612405562006-05-0909 May 2006 Operated by Nuclear Management Company (Nmc), LLC Safety Evaluation for the Conversion to the Improved Technical Specifications (TAC No. MC7505). Transmittal Memo ML0605906122006-02-28028 February 2006 03/22/2006 - Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal at Monticello Nuclear Generating Plant (Monticello) ML0602502942006-01-25025 January 2006 Canceled Notice of Meeting with Nuclear Management Company Regarding Fleet Transition to NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants ML0601300042006-01-10010 January 2006 Summary of Telephone Conference Call Held on December 21, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC Concerning Information Pertaining to the Monticello Nuclear Generating Plant License Renewal ML0535001712006-01-0505 January 2006 Safety Evaluation on Proposed Emergency Action Levels Based on Revision 4 to NEI 99-01, Methodology for Development of Emergency Action Level for Monticello Nuclear Generating Plant TAC No. MC5017, Docket No. 50-263 ML0535000842005-12-16016 December 2005 Docketing of the Sign-up Sheet and Slides for the Meeting of December 8, 2004, Regarding Independent Spent Fuel Storage Installation ML0516000812005-06-0909 June 2005 Memo Issuing Audit and Review Plan for Plant Aging Management Reviews and Programs for the Monticello Nuclear Generating Plant 2024-02-23 |
Text
MEMORANDUM TO: Theodore Smith, Chief Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards FROM: Jessica M. Umana, Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards
SUBJECT:
MEETING
SUMMARY
- PUBLIC SCOPING MEETING FOR THE ENVIRONMENTAL REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION FOR MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 (EPID NO.: L-2023-SLE-0000)
On March 22, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a scoping meeting to gather information necessary to prepare an environmental impact statement to evaluate the environmental impacts for the subsequent license renewal of the operating license for Monticello Nuclear Generating Plant, Unit 1. Enclosed is the meeting summary.
If you have any questions or comments, please contact me via e-mail at Jessica.Umana@nrc.gov.
Docket No. 50-263
Enclosures:
- 1. Meeting Summary
- 2. List of Attendees
- 3. NRC slide presentation
- 4. Meeting transcript cc: w/encls: Listserv CONTACT: Jessica Umana, NMSS/REFS 301-415-5207May 1, 2023 Signed by Umana, Jessica on 05/01/23
T. Smith
SUBJECT:
MEETING
SUMMARY
- PUBLIC SCOPING MEETING FOR THE ENVIRONMENTAL REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION FOR MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 (EPID NO.: L-2023-SLE-0000)-
DATED: May 1, 2023
DISTRIBUTION:
PUBLIC RidsNrrPMMonticello Resource
RidsNrrDnrl Resource THererra, OEDO RidsACRS_MailCTR Resource MBailey, OEDO/AO RidsRgn3MailCenter Resource DRoth, OGC RidsRgn3Dnms Resource CWolf, OCA RidsRgn3Drp Resource TMcGowan, RIII/DORS RidsRgn3Drs Resource CNorton, RIII/DORS RidsRgn3Ora Resource HPeterson, RIII/DORS RidsRgn3Opa Resource NFeliz-Adorno, RIII/DORS RidsNrrOd Resource MDomke, RIII/DORS LGibson, NRR/DNRL ABarker, RIII/FCO JHammock, NRR/DNRL HLogaras, RIII/FCO BSmith, NRR/DNRL VMitlyng, RIII/OPA BThomson, NRR/DNRL PChandrathil, RIII/OPA TSmith, NMSS/REFS Max.W.Smith@xcelenergy.com JUmana, NMSS/REFS paul.b.young@xcelenergy.com BBallard, NRR/DORL stephen.sollom@xcelenergy.com NSalgado, NRR/DORL
ADAMS Accession Nos.: ML23110A013 (pkg); ML23110A014 (memo), ML23110A015 (summary); ML23108A313 (Transcript); ML23073A041 (Application); ML23081A039 (Slide) concurred via email*
OFFICE PM/ELRB/REFS LA/ERMB/REFS BC/ELRB/REFS PM/ELRB/REFS NAME Jumana AWalker-Smith TSmith JUmana
DATE 4/27/23 4/27/23 4/28/23 5/1/23