April 13, 2021 LICENSEE: Northern States Power Company, a Minnesota Corporation FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF MARCH 25, 2021, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY, RELATED TO A PLANNED LICENSE AMENDMENT TO ADOPT ADVANCED FRAMATOME METHODS (EPID L-2021-LRM-0021)

On March 25, 2021, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of Northern States Power Company, doing business as Xcel Energy (Xcel Energy, the licensee). The purpose of the meeting was for Xcel Energy to provide information about a planned amendment for Monticello Nuclear Generating Plant (Monticello). The planned amendment would allow for the licensee to transition to the Framatome ATRIUM 11 fuel design using advanced Framatome methods. The meeting notice and agenda, dated March 3, 2021, are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML21063A110. The licensees presentation is available in ADAMS at Accession No. ML21082A470. A list of attendees is provided as .

The licensee presented information on the content and timing of the planned amendment. The licensee stated that the amendment would address applicable NRC guidance and would allow for the use of the ATRIUM 11 fuel design beginning in 2023. The licensee plans to submit the license amendment request by July 2021.

The licensee discussed the use of advanced Framatome methods to support the planned ATRIUM 11 fuel deployment. The licensee included a list of generic reports to be used for the planned amendment and referenced previously approved advanced Framatome methods for other licensees. The NRC queried the licensee on the use of the Best Estimate Enhanced Option III (BEO-III) methodology. The licensee responded that all advanced methods topical reports used for the planned amendment request will have received NRC approval prior to the submittal.

Additionally, the licensee presented the planned technical specification changes. The NRC staff queried the licensee on the analyses to be included with the planned amendment request. The licensee responded with an intent to submit equilibrium cycle reports with the application. The NRC staff indicated the importance of ensuring the analyses are bounding for cycle specific parameters. The NRC staff also recommended including short term containment pressure and temperature response, long term suppression pool temperature response, and the impact on the licensed containment accident pressure used for the calculation of net positive suction head

for emergency core cooling and containment heat removal pumps. The NRC staff also recommended addressing the impact of fluence on the reactor pressure vessel.

No members of the public were in attendance. No public comments were received.

Please direct any inquiries to me at Robert Kuntz at 301-415-3733 or Robert.Kuntz@nrc.gov.

/RA/

Robert Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-263

Enclosure:

List of Attendees cc: Distribution via Listserv

LIST OF ATTENDEES MARCH 25, 2021, MEETING WITH NORTHERN STATES POWER COMPANY POTENTIAL AMENDMENT REQUEST TO ADOPT ADVANCED FRAMATOME METHODS Nuclear Regulatory Commission Robert Kuntz Jacquelyn Harvey Ahsan Sallman Ashley Smith Adam Rau Diana Woodyatt Summer Sun Northern States Power Company Darius Ahrar Sara Scott Sean Martin Tamara Malaney Kevin Austin Keith Dehnbostel Rich Martin Rick Loeffler Framatome (Northern States Power Company Contractor)

Dan Tinkler Stan Jones Alan Meginnis Roland DeSteese Dirk Howlett Dang Patchana Kris Mitchell Kevin Quick Tanner Davis Jeff Morris Robert Schnepp Enclosure

ML21098A074 OFFICE NRR/DORL/LPL3 NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME JHarvey RKuntz SRohrer DATE 4/8/2021 4/8/2021 4/8/2021 OFFICE NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME NSalgado RKuntz DATE 4/13/2021 4/13/2021