Letter Sequence Meeting |
|---|
TAC:MD9990, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis, L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer, L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report, L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710682, ML090710683, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092090321, ML092290250, ML092790191, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100980009, ML101890915, ML102010461... further results
|
MONTHYEARML0920903212003-10-15015 October 2003 Drawing NX-7831-197-1, Rev D, Monticello Nuclear Generating Plant Reactor Vessel & Internals, Monticello, Unit 1 Project stage: Other ML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other 05000263/LER-2008-001, Re Non-Conservative High Energy Line Break Analysis Discovered During Extended Power Uprate Review2008-03-31031 March 2008 Re Non-Conservative High Energy Line Break Analysis Discovered During Extended Power Uprate Review Project stage: Request ML0914101242008-08-11011 August 2008 Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other ML0826310122008-09-18018 September 2008 Special Inspection Charter for Loss of Normal Offsite Power to Non-Safety Buses and Resultant Reactor Scram on 9/11/2008 Project stage: Request ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate Project stage: Request L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis Project stage: Other ML0832301112008-11-0505 November 2008 License Amendment Request: Extended Power Uprate Project stage: Request ML0832301142008-11-0505 November 2008 Steam Dryer Dynamic Stress Evaluation Project stage: Request ML0831106732008-11-0707 November 2008 Notice of Meeting with Nuclear Management Company to Discuss the November 05, 2008, License Amendment Application for Extended Power Uprate for Monticello Nuclear Generating Plant Project stage: Meeting ML0832507042008-11-26026 November 2008 Meeting Summary, Meeting with Northern States Power Company to Discuss the November 5, 2008, Application for an Extended Power Uprate Amendment Project stage: Meeting ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Extended Power Uprate (USNRC TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate Project stage: Other ML0914101222008-12-18018 December 2008 Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101212008-12-19019 December 2008 Calculation CA-95-073, Revision 4, Reactor Low Water Level Scram Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other ML0907106822009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other L-MT-09-004, Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 20082009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI 2009-01-14
[Table View] |
Text
~p.1\\ REGuZq UNITED STATES 0~"v'"
"'°11...
NUCLEAR REGULATORY COMMISSION
~
()
WASHINGTON, D.C. 20555-0001 0
\\n
~
0 V";.
~
b
~')
~o Decem er 13, 2012
>t***i<
LICENSEE:
Northern States Power Company of Minnesota FACILITY:
Monticello Nuclear Generating Plant
SUBJECT:
SUMMARY
OF THE NOVEMBER 20, 2012, PUBLIC MEETING WITH NORTHERN STATES POWER COMPANY OF MINNESOTA TO DISCUSS THE EXTENDED POWER UPRATE GAP ANALYSIS (TAC NO. MD9990)
On November 20, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Northern States Power Company of Minnesota, doing business as Xcel Energy, at NRC headquarters. The purpose of the meeting was for the licensee to present the results of its extended power uprate (EPU) gap analysis. The gap analysis identifies changes to information previously submitted to the NRC in the EPU license amendment request (LAR) application and supplements. The enclosure to this summary contains the list of participants.
The licensee introduced its EPU gap analysis in a slide presentation (docketed at Agencywide Documents Access and Management System (ADAMS) Accession No. ML12335A173). The presentation summarized the history and current status of the Monticello EPU review, and provided the methodology for how the gap analysis results were identified and dispositioned.
The focus of the meeting was a discussion of the gap analysis results, which Xcel Energy summarized in a table (docketed at ADAMS Accession No. ML12335A176). The NRC staff questioned the licensee on various aspects of the table and provided the following comments listed below:
Topic NRC Staff Comment(s) on Proposed Disposition Identify the ten MOVs Motor-Operated Valves Identify the impact on functional performance (MOVs)
Discuss compliance with generic guidance Discuss remaining in compliance with 10 CFR 50.55(a)
Grid Stability Staff requests MISO [Midwest Independent Transmission Assessment System Operator] letter be provided for review Environmental Staff requests a discussion of the changes and to provide Qualification (EQ) validation of EQ parameters Battery Capacity No specific comments
- 2 NRC Staff Comment(s) on Proposed Disposition Topic
- Staff understands that General Electric - Hitachi (GEH) is working on revising this calculation related to possible Main Steam Line High changes to choke flow rates Flow Trip
- Staff requests changes, when available, to be submitted for review
- Staff indicates a potential for follow-up discussions
- As long as changes are administrative in nature (i.e.,
results of calculations are unaffected), a brief description of Changes to Calculations the changes submitted on the docket should be sufficient
- If set point values are affected, then the staff requests the updated calculation be submitted for review Steam Dryer
- Staff requests that information related to change be Impact on Reactor Water submitted for review Quality EPU LAR for Pressure-Temperature Limits No specific comments Re~ort LAR
- Staff requests verification that offsite dose still meets the limits of 40 CFR 190 with the addition of hydrogen water Noble Metals chemistry and noble metal injection Modification
- Licensee informed that there may be follow-up requests for additional information from NRC staff Abnormal Operating
- Staff requests information regarding the AOP change if the Procedure (AOP) turbine backpressure limit is changed Change Energy Core Cooling System (ECCS) Pump
- No specific comments Post-Loss-of-Coolant Accident Heatup Final Feedwater Staff commented on how GEH evaluated the effect of the Temperature change TODic NRC Staff Comment(s) on Proposed Disposition Piping Components Requiring Further Analysis Staff indicates that the change needs to be submitted and placed on the docket Alternative Source Term Staff indicates that the change needs to be submitted and placed on the docket Describe the changes from the previous submittals Discuss if the changes are still bounding This will allow the staff to perform confirmatory calculations Condenser Free Volume Staff requests a table summarizing what changed and the assumptions being made Technical Support Center Dose Calc Staff requests a table summarizing what changed and the assumptions being made Risk Assessment Staff indicates that the change needs to be submitted and placed on the docket Staff requests a qualitative summary as to the change in Core Damage Frequency and Large Early Release Frequency Computer Codes Used No specific comments High-Energy Line Break No specific comments Turbine Bypass Valve Capacity No specific comments Appendix R Staff requests that the current licensing basis be clearly defined Clarification of the current requirement for 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to
- 200°F Note: NRC fire protection staff requested validation of any changes impacting the fire protection analyses Containment Accident Pressure Review of Appendix R No specific comments
- 4 NRC Staff Comment(s) on Proposed Disposition Togic Reactor Head Spray Nozzle Fatigue No specific comments Assessment Emergency Operating Plan (EOP) Flow Chart
- Staff requests a copy of the EOP flowchart for ATWS for Anticipated Transfer Without Scram (A TWS)
Avoidance of Trip of Both
- No specific comments, other than the staff will want to know Reactor Feed Pumps on if there is a commitment change Transients
- Staff indicates that information of what was reviewed to reach the conclusion that there are on impacts to the EA Environmental needs to be submitted and placed on the docket Assessment (EA)
- Staff recommends that the applicant refer to 10 CFR 50.92 when submitting changes list of Modifications No specific comments Required
- Provide a supplemental reload licensing report
- Provide an ECCS evaluation
- Staff requests a detailed discussion of changes to electrical equipment loading and capacities since the last submittal, Other NRC Staff including diesel generators Requests
- If Part 21 related to loss of stator cooling affects rvlNGP, provide an analytical assessment
- Staff requests review of RIS 2008-30 for applicability to MGNP Members of the public participated by telephone. No portion of this meeting was closed to the public because no proprietary information or security-related information was discussed by the participants. Before the meeting adjourned, all participants were given the opportunity to comment on any aspects of the meeting. No comment or feedback was provided.
- 5 Please direct any inquiries to me at 301-415-3049 or e-mail terry.beltz@nrc.gov.
~--
~
Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\\10. 50-263
Enclosure:
List of Participants cc w/encl: Distribution via ListServ
LIST OF PARTICIPANTS MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NORTHERN STATES POWER COMPANY OF MINNESOTA MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE GAP ANALYSIS PRESENTATION NOVEMBER 20,2012 NAME ORGANIZATION Briana Balsam f\\I RC/NRR/DLR/RERB Chakrapani Basavaratu N RC/NRR/DE/EMCB Terry Beltz NRC/NRR/DORLlLPL3-1 William Bentley **
TVA Joel Beres IVlNGP John Bjorseth Xcel Energy Kevin Borton Exelon Robert Carlson N RC/N RR/DORLlLPL3-1 William Cheever **
MNGP Nicholas DiFrancesco N RC/N RR/DORLlLPL3-2 DyLanne Duvigneaud NRC/NRR/DRNAADB Gene Eckholt Xcel Energy Steve Frankl NRC/RES/DSNRSAB Peter Glass **
Xcel Energy Steve Hammer **
MNGP Nathan Haskell Xcel Energy Denzel Housley **
TVA Naeem Iqbal NRC/NRR/DRNAFPB Chris Jackson NRC/NRR/DSS/SRXB William Jessup N RC/NRRIDE/EMCB Steve Jones NRC/f\\lRR/DSS/SBPB Aziz Khanifar Xcel Energy Michelle Kichline NRC/NRR/DRNAADB Jeff Kitsembel **
State of Wisconsin George Lapinsky **
NRC/NRRIDRNAHPB Nancy Martinez NRC/NRR/DLR/RERB Matthew McConnell NRC/NRR/DE/EEEB Tony McMurtray NRC/NRR/DE/EPTB Tim Mossman NRC/NRR/DE/EICB Marty Murphy I\\JRC/NRR/DE/EMCB Ivy Netzel **
Performance Power Systems Aloysius Obodoako NRC/NRR/DE/ESGB John Osborne **
TVA (Browns Ferry)
Ben Parks **
N RC/N RR/DSS/SRXB Jigar Patel NRC/NRR/DRNAPLA Enclosure
LIST OF PARTICIPANTS (continued)
NAME Roger Pedersen Dave Pennington **
Ahsan Sallman Travis Tate Jeff Tollefson **
Alexander Tsirigotis
- Participated by telephone ORGANIZATION NRC/NRRIDRAlAHPB MNGP N R CIt\\! R RIDSS/SCVB I'J RC/NRRIDRAIMDB MNGP NRC/NRRIDE/EMCB Acronyms for List of Participants MDB AFPB AHPB APLA DE DLR DORL DRA DSS EEEB EICB EMCB ESGB EPTB LPL3-1 LPL3-2 rvlNGP NRC NRR RERB RES SBPB SCVB SRXB TVA Accident Dose Branch Fire Protection Branch Health Physics & Human Performance Branch PRA Licensing Branch Division of Engineering Division of License Renewal Division of Operating Reactor Licensing Division of Risk Assessment Division of Safety Systems Electrical Engineering Branch Instrumentation and Controls Branch Mechanical & Civil Engineering Branch Steam Generator Tube Integrity & Chemical Engineering Branch Component Performance & Testing Branch Plant Licensing Branch 111-1 Plant Licensing Branch 111-2 Monticello Nuclear Generating Plant U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Environmental Review & Guidance Update Branch Office of Nuclear Research Balance-of-Plant Branch Containment and Ventilation Branch Reactor Systems Branch Tennessee Valley Authority 2
- 5 Please direct any inquiries to me at 301-415-3049 or e-mail terry.beltz@nrc.gov.
Terry A. Beltz, Senior Project Manager IRAJ Plant Licensing Branch" 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263
Enclosure:
List of Participants cc w/encl: Distribution via ListServ DISTRIBUTION :
PUBLIC LPL3-1 R/F BBalsam, NRR MMcConnell, NRR RidsAcrsAcnw_MailCTR Resource CBasavaratu, NRR AMcMurtray, NRR RidsNrrDorlLpl3-1 Resource DDuvigneaud, NRR TMossman, NRR RidsNrrLASRohrer Resource Nlqbal, NRR MMurphy, NRR RidsNrrPMMonticelio Resource CJackson, NRR AObodoako, NRR RidsRgn3MailCenter Resource WJessup, NRR BParks, NRR RidsOgcRp Resource SJones, NRR JPatel, NRR TWertz, NRR MKichline, NRR ASallman, NRR TSantos, EDO Region 3 GLapinsky, NRR TTate, NRR NMartinez, NRR ATsirigotis, NRR Package: ML12338A007 Meeting Notice: ML12311A334 Meeting Summary: ML12338A006 EPU Gap Analysis Results Presentation Slides: ML12335A173 EPU Ga~Analysis - Details of Differences with NRCCorrespondence: ML12335A176 OFFICE LPL3-1/PM LPL3-1/LAit LPL3-2/LA LPL3-1/BC LPL3-1/PM NAME TBeltz ELee SRohrer RCarlson TBeltz DATE 12/12/12 12/12/12 12/12/12 12/13/12 12/13/12 OFFICIAL RECORD COpy