ML20054F548

From kanterella
Revision as of 10:39, 21 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/82-04 & 50-441/82-04 on 820301-0430.No Noncompliance Noted
ML20054F548
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/01/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20054F549 List:
References
NUDOCS 8206170092
Download: ML20054F548 (2)


See also: IR 05000440/1982004

Text

e

'

h

r

i

UUN f 1982

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating -j

Company

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. L. Gildner

of this office on March 1 through April 30, 1982, of activities at the

Perry Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings

with Mr. R. L. Farrell at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

'

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel,

i

'

No items of noncompliance with NRC requirements were identified during the

i course of this inspection.

l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

I 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8206170092 820601

PDR ADOCK 05000440

0 PDR

- --. .-- _ _ . - - - . - . . _- _- __ . ,_- _ .-. ., -,_ _ .

f!kOf,

W

.

The Cleveland Electric Illuminating 2

Company

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

, e

J. F. eter, Chief

Projects Branch 2

Division of Project and

Resident Programs

Enclosure: Inspection Report

i No. 50-440/82-04(DPRP) and

l No. 50-441/82-04(DPRP)

cc w/ enc 1:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Daniel D. Wilt, Attorney

IIelen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of IIealth

!

l

l

l

RI I RI

l

'

'onk lin tret er

l 5/28/82