Forwards IE Inspec Rept 50-317/78-22 & 50-318/78-16 on 780808-18 & Notice of Violation
ML20062C500
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/13/1978
From: Crocker H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20062C494 List:
References
NUDOCS 7811090032
Download: ML20062C500 (2)


See also: IR 05000317/1978022

Text

.

'

.

-

, ..

- *

g

.[ N % *

UNITED STATES

,,5 ,)*. NUCLEAR REGULATORY COMMisslON

e S REGION 1  !

' $O ' / j S31 PARK AVENUE

,7 KING OF PRUSSI A. PENNSYLVANI A 19408

Y..v.. . / ,

-

Docket Nos. 50-317

50-318 SEP 13 im

I

I

Baltimore Gas and Electric Company .

!

ATTN: Mr. A. E. Lundvall, Jr. '

Vice President Supply

P. O. Box 1475

Baltimore, Maryland 21203

'

Gentlemen:

Subject: Inspection 50-317/78-22; 50-318/78-16

.

This refers to the inspection conducted by Mr. John R. White of this  :

. office on August 8-11, 1978, at Calvert Cliffs Nuclear Power Plant Units

i

J

1 and 2, of activities authorized by NRC License Nos. DPR-53 and DPR-69

and to the discussions of our findings held by Mr. White with Mr. R.

Douglass of your staff at the conclusion of the inspection, and to a

subsequent telephone discussion between Mr. A. J. Kaupa and Mr. White on

August 17, 1978.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.  !

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, i

as set forth in the Notice of Violation, enclosed herewith as Appendix  :

A. These items of noncompliance have been categorized into the levels  ;

, as described in our correspondence to you dated December 31, 1974. This  :

"

notice is sent to you pursuant to the provisions of Section 2.201 of the '

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20) k

, days of your receipt of this notice, a written statement or explanation

'

in reply including: (1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

,

'

l

avoid further items of noncompliance; and (3) the date when full compliance  ;

-

will be achieved.

76J,$9#$3z  :

,

3/70 >

-

me9  ;

'

. .. . _ _ . . . _ . . . .

l

. .

"

i

l

Baltimore Gas and Electric 2 SEP 13 IN8

Company

Item number A, shown in the Notice of Violation enclosed with this

letter, is a recurrent item. In your response please give this matter

your particular attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the i

enclosures will be placed in the NRC's Public Document Room. If this

'

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Comission as listed in subparagraph (b)(4) of Section 2.790. The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit. If we do not hear from you in

this regard within the specified period, the report will be placed in

i the Public Document Room.

i Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

. . . ~

7 Sincerely,

~

'

t-

$ 8 a- Pf

s i

J .

WITilbert W. Crocker, Acting Chief

.. . L._.

Fuel Facility and Materials Safety

Branch

Enclosures:

1. Appendix A, Notice of Violation '

2. Office of Inspection and Enforcement Inspection Report

Numbers 50-317/78-22; 50-318/78-16

cc w/encis:

R. W. Davies, Manager, Quality Assurance

R. M. Douglass, Chief Engineer

W. Gibson, Supervisor Operational QA

!

l