Monthly Operating Rept for Mar 1996 for Wateford 3 Ses.W/
ML20107B907
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1996
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0051, W3F1-96-51, NUDOCS 9604170139
Download: ML20107B907 (7)


Text

b, g- Ent y Operations,lnc.

l K&ra LA 70066 Tei 504 739 6774 R. F. Burski twur FA.o;ar 5 defy Wa%rfud 3 l W3F1-96-0051

A4.05 PR 1

1 l

April 15,1996

! U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk l Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 l Monthly Operating Report i Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the

month of March,1996. This report is submitted pe.r Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, 5 t-R.F. Burski Director Nuclear Safety RFB/DFL/ssf l Attachment i cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

> D0020 J.T. Wheelock (INPO Records Center)

NRC Resident inspectors Office y [

9604170139 960331 g i PDR ADOCK 05000382 i R PDR

NRC MONTHLY OPERATING REPORT l

SUMMARY

OF OPERATIONS WATERFORD 3 for March,1996 l

l l

The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.  ;

1 l

l l

4'196 Page : I of 6

l t

l l PRESSURIZER SAFETY VALVE I

FAILURES AND CHALLENGES I 1

WATERFORD 3 i l

for March,1996 r

There were no pressurizer safety valve failures or challenges experienced during the month, i l

l L

l l l t

l

( +w6 r : 2 or 6 l

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 5,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS

1. Reporting Period -

March,1996 Gross Hours in Reporting Period 744

2. Currently Authorized Power Level (MWt)
  • 3,390 Maximum Dependable Capacity (Net MWe) . 1,07s Design Electrical Rating (Net MWe) -

1,104

3. Power Level to which Restricted (if any)(Net MWe) N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 744.0 2,184.0 7s,216.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 2,184.0 77,270.2
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,516,925 7,391,948 256,088,389
10. Gross Electrical Energy Generated (MWH) 855,350 2,500,570 8s,358,940
11. Net Electrical Energy Generated (MWH) 820,s29 2,39s,663 81,404,47s
12. Reactor Service Factor 100.0 100.0 84.s
13. Reactor Availability Factor 100.0 100.0 84.s
14. Unit Service Factor 100.0 100.0 83.s
15. Unit Availability Factor 100.0 100.0 83.s
16. Unit Capacity Factor (using MDC) 102.6 102.2 82.1
17. Unit Capacity Factor (using DER) 99.9 99.5 80.0
18. Unit Forced Outage Rate 0.0 0.0 3.3 N3/96 Page ; 3 of 6

c-OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 l DATE OF REPORT : April 5,1996 j

COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE l

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation. j THIS YEAR TO MONTH DATE CUMULATIVE  !

l 22. Hours in Reporting Period 744 2,184 92,209

23. Unit Forced Outage Hours 0.0 0.0 2,673.2
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) .

1,120

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A l

I i

l i

gg Page : 4 of 6

AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 5,1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504)464-3352 Reporting Period : March,1996 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,106 16 1,105 2 1,069 17 1,106 3 1,074 18 1,106 4 1,104 19 1,105 5 1,105 20 1,105 6 1,106 21 1,105 7 1,106 22 1,106 I 8 1,106 23 1,106 9 1,105 24 1,105 10 1,106 25 1,105 11 1,106 26 1,105 12 1,107 27 1,105 13 1,107 28 1,105 14 1,106 29 1,105 15 1,104 30 1,106 31 1,106 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

4 n

S$96 Page: $ of 6

i UNIT SHUTDOWNS AND POWER REDUCTIONS l 1

DOCKET NUMBER : 50-382 .. I UNIT NAME : WATERFORD 3 DATE OF REPORT : April 5,1996 COMPLETED BY : D. S. Freeman l TELEPHONE : (504)464-3352 l l

REPORTING PERIOD : March,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hour ; Reason Method Corrective Actions NONE I

TYPE REASON F - Forced A - Equipment Failure (explain) l S - Scheduled B - Maintenance or Test C - Refueling ,

D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Pariod 5 - Power Reduction 6 - Other (explain) og Page : 6 of 6