ML20125E639

From kanterella
Revision as of 14:03, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1992 for Waterford 3.W/
ML20125E639
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/30/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0457, W3F1-92-457, NUDOCS 9212170161
Download: ML20125E639 (7)


Text

_ _ ______

g l"n'"a """ "*""*

== ENTERGY

' s tira L A 70006 Tc4 504 739 6774 R. F. Durski :

m, "AI'F-F S@i 7 ti d3-W3F1-92-0457 A4.05 QA December 11, 1992 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

-Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of November, 1992. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No.-NPF-38.

Very truly yours,

. +

RFB/TSB/ssf Attachment cc: J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost-(Utility Data-Institute, Inc.)

J.T. Wheelock (INP0 Records- Center)

NRC Resident-Inspectors Office I

170099 ,

9212170161 921130 PDR ADOCK 05000382' e /

/ '

l LT1 R PDR

. . , . _ ..~. _ . _ _ _ _ . ..

1 i ..

I 9

1 j

1 j NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS 1

WATERFORD 3 NOVEMBER 1992 i

! The unit operated at an average power of 64.8% and concluded Refuel Outage 5 l during the period.

i d

i i

2 W

4 i

k i

i E

4 I.

s t

1 k

4 i

i e

f

. . _ . .. . . . . _ . - . . . .. - . _ . ~ _ _ . .

4 1 ie l

  • 1 1 -

i i

i 1

1 1

4 4

i PRESSURIZER SAFETY VALVE i FAILURES AND CHALLENGES i

WATERFORD 3 i

1 During the month of Novemoer 1992, there were no pressurizer safety - valve 3 failures or challengen.

J i

i s

i i

f i

i I

1 l

l l

l l

l i

I i

r i

1.

I l

l

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE-OF REPORT: DECEM8ER, 1992 COMPLETED 8Y: P. M. CENTOLANEI TELEPHONE: 504-739-6683 OPERATING STATUS

1. Reporting Periods November, 1992 Gross Hours in Reporting Period 720-
2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor was Critical 557.9 6,562.6 51,649.0-
6. Reactor Reserve Shutdown Hours 7. Hours Generator was On-line 512.3 6,471.4 50,852.2 ,
8. Unit Reserve Sherdown Hours 9. Gross Thermal Energy Generated (MWH) 1,581,907- 21,612,251 167,161,726
10. Gross Electrical Energy _ Generated (MWH)

_ 518,570 7,158,730 56,030,150

11. Net Electrical Energy Generated (MWH) 489,173 6,824,977 53,374,437
12. Reactor Service Factor 77.5 81.6 82.0
13. Reactor Availability Factor 77.5 81.6 82.0
14. Unit Service Factor 71.2 -80.5 80.7
15. Unit Availability Factor 71.2 80.5 80.7
16. Unit capacity Factor (using MDC) 63.2 79.0 78.8 17.- Unit capacity Factor (Using DER)- 61.5 76.9 76.7
18. . Unit Forced Outage Rate 0.0 1.9 4.0 s m _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _

~

OPERATING DATA REPORT f DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: DECEMBER, 1992 COMPLETED BY P. H. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't)

19. Shutdowns Scheduled over next 6 Honths (type, date and duration of each):
20. If Shutdown at end of report period, estimated date of startup N/A
21. Unit in Commercial Operation THIS HONTH YR TO DATE CUNULATIVE
22. Hours in Reporting Period 720.0 8,040.0 63,001.0
23. Unit Forced Outage Hourn 125.9 2,110.7
24. Nameplate Rating (Gross HWe): 1200
25. If Changes Occur in capacity Ratings (Itema Number 2 and 24) Since Last Report, Give Reasons: N/A

4 4

J ,

< AVERAGE DAILY UNIT POWER LEVEL 4

j DOOKET NAME: 50-382 UNIT NAME: WATERFORD 3 ,

' DATE OF REPORT: DECEMBER, 1992

' COMPLETED BYt P. H. CENTOLANZI i

TELEPHONE: 504-739-6683 I MONTH NOVEMBER l

4 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1

l (MWe-Net) (MWe-Net) 1

! 1 (11) 17 1064 2 (11) 18 1066-i 3 (13) 19 1065 4 (25) 20 1063 f

! 5 (27) 21 1082 1

6 (39) 22 1088 l 7 (41) 23 1085 C (41) 24 1076 i

{ 9 (11) 25 1077 i

j 10 228 26 1076 11 606 27 1076 12 661 28 1077 __

j 13 927 29 1076 14 1006 30 1076 __.

)

15 1064 31 N/A I

16 1064 i INSTRUCTIONS i

On this format, list the average daily unit power level in MWe-Net for each day

in the reporting month. Compute to the nearest whole megawatt.

i 4

I 4

.. .. ~ . . _ . . _ . . _ . . . _ , _ _ _ . . . _ . . _ _ _ . . . , _ . . . _ , _ _ .-- .._

l .

l l

i ,

UNIT SHUTDOWNS AND POWER REDUCTIONS

, I i .;

4' DOCKET NUMBER: 50-382 i i

UNIT NUMBER: WATERFORD 3 i

! DATE OF REPORT: DECEMBER, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683

{

REPORT FOR NOVEMBER '

Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and '

Number Date S = Scheduled (Hours) Reason (1) Reducing Power (2) Corrective Actions 4 92-05 920919 S 207.7 C 4 Unit removed from service to begin Refuel Outage 5.

> Outage continued

} from previous period.

(1) REASON . (2) METHOD A = Equipment Failure (explain) 1 = Manual B = Maintenance or Test 2 = Manual Scram C = Refueling 3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative G = Orarational Error (explain)

H = Other (explain) i i

_ . , . ., ,, . . _ . . - , , _. _. . _ _