ML20126B629

From kanterella
Revision as of 14:16, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of Diodes
ML20126B629
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/20/1985
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-85177, TAC-55294, NUDOCS 8506140158
Download: ML20126B629 (2)


Text

.-

l O PublicService ......

Company of Colorado 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 May 20, 1985 Fort St. Vrain Unit No. 1 P-85177 Regional Administrator 3M@MOY

)

M Region IV '

MAY 311985  !

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 N Arlington, Texas 76011

}

Attn: Mr. E. H. Johnson Docket No. 50-267

SUBJECT:

CRD Brake and Limit Switch Diode Testing

REFERENCE:

Transcripts of PSC/NRC Meeting of February 22, 1985 (G-85087)

Dear Mr. Johnson:

As discussed in a site meeting on February 22, 1985, this letter is in response to PSC commitment log item CL-1055 and is providing you information concerning verification of operability of the surge diodes on the control rod drive brake and limit switch relays.

There are eight diodes per refueling region that are used for arc suppression or isolation. The first seven diodes listed below are located in the control room on panel I-03. The last diode listed is located in the breaker cubicle for each region in the CRD motor control center. The diodes and their function are as follows:

(1) DAS X In Limit Relay Arc Suppression (2) DAS X Out Limit Relay Arc Suppression (3) DAS X Slack Cable Relay Arc Suppression -

(4) CR 1-X - Slack Cable Reset Relay Isolation (5) CR 2-X - In Limit Light Isolation (6) CR 3-X - Slack Cable Light Isolation (7) CR 4-X - Out Limit Light Isolation jb[ $ ,/

/'

(8) CRD Brake Arc Suppression g h 'id r ()g Cf393 g

p w p g Pwo9o 67 po,61 PDR

,9 -

Presently there are no surveillances performed to verify operability of these. diodes. Anactionrequest(DCAR-704)hasbeeninitiated to provide relocation of the diodes so they can be tested on a regular basis without causing a less of control rod position indication or

[ control rod scram.

f Should you have any Mr. M.' H.. Holmes at303)

(questions 571-8409.concerning this matter, please contact I

Very truly yours, 4@C H. L. Brey, Manager Nuclear Licensing and Fuels Division HLB /JS:pa I