Other: 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided, ML20084C589, ML20084Q444, ML20092P626, ML20093K194, ML20094D774, ML20096C032, ML20098B305, ML20099K727, ML20100H112, ML20106B531, ML20106B533, ML20112G463, ML20117M059, ML20126B629, ML20127J822, ML20127K637, ML20127L885, ML20127N695, ML20132C948, ML20132E623, ML20132G502, ML20134E865, ML20138Q922, ML20206J841, ML20209E899
|
MONTHYEARML20084C5891984-04-16016 April 1984 Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant Monitoring Project stage: Other ML20084Q4361984-05-10010 May 1984 Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4221984-05-10010 May 1984 Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4441984-05-10010 May 1984 Proposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations Encl Project stage: Other ML20092P6261984-06-26026 June 1984 Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor Startup Project stage: Other ML20090C5261984-07-0606 July 1984 Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting Project stage: Meeting ML20094D7741984-07-18018 July 1984 Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action Described Project stage: Other ML20096C0321984-08-21021 August 1984 Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions Listed Project stage: Other ML20098B3051984-09-0707 September 1984 Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily Discontinued Project stage: Other ML20093K1941984-09-24024 September 1984 Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch Indication Project stage: Other ML20099K7271984-11-0808 November 1984 Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable Failure Project stage: Other ML20112C0491984-12-27027 December 1984 Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value Encl Project stage: Request ML20112G5061985-01-0404 January 1985 Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 Meetings Project stage: Meeting ML20106B5311985-01-25025 January 1985 Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be Submitted Project stage: Other 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided1985-01-28028 January 1985 Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided Project stage: Other ML20106B5331985-01-31031 January 1985 Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228 Project stage: Other ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart Project stage: Other ML20112G4631985-03-18018 March 1985 Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326 Project stage: Other ML20100H1121985-03-26026 March 1985 Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 Commitment Project stage: Other ML20117M0591985-04-26026 April 1985 Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High Quality Project stage: Other ML20132C9781985-05-17017 May 1985 Safety Evaluation Re CRD Instrumentation Project stage: Approval ML20126B6291985-05-20020 May 1985 Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of Diodes Project stage: Other ML20127J8221985-06-0707 June 1985 Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High Temps Project stage: Other ML20127K6371985-06-0707 June 1985 Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp Anticipated Project stage: Other ML20127L8851985-06-13013 June 1985 Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design Margins Project stage: Other ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys Project stage: Other ML20209E8991985-06-25025 June 1985 Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results Encl Project stage: Other ML20132C9481985-07-0101 July 1985 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co Project stage: Other ML20132E6231985-07-0303 July 1985 Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown Matl Project stage: Other ML20132C9391985-07-12012 July 1985 Forwards Eg&G 850701 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co, Per Util 850613 Submittal.Installed Bearings Acceptable Replacements for Original Design.Review of 850607 Submittal Also Encl Project stage: Approval ML20134E8651985-07-17017 July 1985 Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification Project stage: Other ML20134E8601985-07-31031 July 1985 Forwards Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification, in Response to Concerns Discussed at 850221 Meeting & in Project stage: Meeting ML20138Q9221985-12-19019 December 1985 Informs of Inability to Meet 851230 Completion Date of High temp,300 F,Crd Mechanism Test & Preliminary Evaluation,Due to Difficulties,Including Orifice Valve on Mechanism.Final Rept Will Be Submitted by 860331 Project stage: Other ML20199D3411986-06-11011 June 1986 Forwards Evaluation of Util Response to 851003 Review of Performance Enhancement Program.Method Should Be Provided to Confirm Functional Acceptability of Equipment Prior to Return to Svc Project stage: Approval ML20206B3301987-04-0606 April 1987 Requests Fr Publication of Notice of Issuance of Amend 52 to License DPR-34,increasing Circular Speed High Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Approval ML20206J9331987-04-0606 April 1987 Safety Evaluation Supporting Amend 52 to License DPR-34 Project stage: Approval ML20206J8411987-04-0606 April 1987 Amend 52 to License DPR-34,increasing Circulator speed-high Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Other ML20206J7481987-04-0606 April 1987 Forwards Amend 52 to License DPR-34 & Safety Evaluation. Amend Increases Circulator speed-high Steam Trip Setting in Table 4.4-3 of Tech Specs Project stage: Approval 1985-03-12
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl ML20247K7741989-09-15015 September 1989 Informs That Partial Review of 890125 & 0320 Submittals Re Helium Circulators complete.Ten-yr Insp Recently Conducted on Circulator C-2105.Insp Revealed No Defects or Unacceptable Conditions ML20247K4141989-09-15015 September 1989 Advises That Tech Specs Re Upgrade Program,Requested in NRC ,Must Be Approved by NRC Before Defueling ML20247D4691989-09-11011 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-15 ML20247H3431989-09-0808 September 1989 Ack Receipt of Informing NRC of Status of Security Sys Upgrades ML20247H2891989-09-0606 September 1989 Concurs W/Util 890714 Request for Changes to Basis for Limiting Condition for Operation 4.2.2 of Facility Tech Specs Re Statement About Automatic Initiation of Backup Bearing Water Sys ML20247B2661989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executives Meeting on 890818 in Arlington,Tx.Topics Discussed Included, Improving Communications,Salp Process in Region IV & Enforcement.List of Attendees & Agenda Encl ML20246J2911989-08-30030 August 1989 Forwards Amend 72 to License DPR-34 & Safety Evaluation. Amend Imposes Early Shutdown by Limiting Reactor Power to 2% of Full Power After 900630 ML20246E5941989-08-21021 August 1989 Forwards Insp Rept 50-267/89-14 on 890710-14 & Notice of Violation.Two Separate Findings of Missing Info in Semiannual Effluent Rept,Resulting in Failure to Satisfy Tech Spec Administrative Requirements Identified ML20246A2651989-08-16016 August 1989 Forwards Insp Rept 50-267/89-13 on 890626-30.Violations Noted But No Citation Issued.Expresses Concern About Status of Model FSV-1 & FSV-1A Shipping Casks ML20245J3511989-08-14014 August 1989 Forwards Amend 71 to License DPR-34 & Safety Evaluation. Amend Revises Provisions in Tech Specs Re Radiological Effluents ML20246A6841989-08-14014 August 1989 Forwards Exam Rept 50-267/OL 89-02 Administered During Wk of 890710 ML20245J5651989-08-10010 August 1989 Forwards Insp Rept 50-267/89-17 on 890717-21 & Notice of Violation ML20245H3891989-08-0808 August 1989 Forwards Insp Rept 50-267/89-12 on 890601-0715 & Notice of Violation ML20245J4421989-08-0808 August 1989 Forwards Safety Evaluation,Responding to Issues Re Tech Spec Upgrade Program & Defueling of Plant.Requests That Tech Spec Changes Be Requested within 30 Days of Ltr Date ML20248E0041989-08-0303 August 1989 Forwards Team Insp Rept 50-267/89-08 on 890522-26 & Notice of Violation.Response Should Include Corrective Actions Taken or Planned to Ensure That Reactor Water Cooling Sys 46 Operated as Designed IR 05000267/19890071989-07-28028 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-07 ML20247N7581989-07-26026 July 1989 Discusses Licensee 890616 Request Re Changes to Previous Commitments Concerning Plans to Shut Down Plant.Commitment 2c to Be Subj of Separate Correspondence.Commitment 7 to Be Considered Not Applicable.W/Revised Summary of Commitments ML20247M4281989-07-25025 July 1989 Responds to 890120 & 0616 Requests for Relief from Requirements of Fuel Surveillance Program.Nrc Considers Util Obligations Under Fuel Surveillance Program Will Terminate W/Planned Shutdown of Reactor by 900630 ML20247M4521989-07-25025 July 1989 Forwards Request for Addl Info Re Reactor Defueling.Info Needed within 30 Days of Ltr Date ML20247L9801989-07-14014 July 1989 Discusses 890711 Meeting in Region IV Ofc Re Introduction of AC Crawford & Future Plans for Facility.Slides Presented at Meeting & List of Attendees Encl ML20247L5971989-07-14014 July 1989 Forwards Insp Rept 50-267/89-15 on 890623-27 & Notice of Violation.Response Should Describe Corrective Actions to Assure That safety-related Changes Introduced by Other Parts of Organization Are Properly Incorporated Into Procedures ML20246M6941989-07-11011 July 1989 Forwards Agenda for 890808 Meeting of Senior Util Executives Sponsored by Region IV at Univ of Texas.Map to Facilitate Access to Meeting Room Also Encl ML20246F4851989-07-10010 July 1989 Discusses Util Re Alternative Compensatory Measures Instituted,Per Fire Protection Operability Requirement-16.Proposed Guidance Adequate ML20246J2791989-07-0707 July 1989 Forwards Safety Evaluation Concluding That Operators Role in Mitigating High Energy Line Break at Facility Acceptable. Technical Evaluation Rept Also Encl ML20245G4491989-06-22022 June 1989 Forwards Exam Rept 50-267/OL-89-01 Administered During Wk of 890523 ML20245G4831989-06-20020 June 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-06 ML20245F8161989-06-20020 June 1989 Proposes Meeting in Region IV to Discuss SALP Process in Region Iv,Improving Communication W/Licensee Mgt,Region IV Enforcement Philosophy,How to Improve Safety Performance & Topics Util Wishes to Discuss ML20245A2201989-06-15015 June 1989 Forwards Insp Rept 50-267/89-10 on 890501-31.No Violations or Deviations Noted ML20244C1221989-06-0808 June 1989 Forwards Insp Rept 50-267/89-07 on 890319-0430 & Notice of Violation ML20248B8741989-06-0505 June 1989 Forwards Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors, Task CE 025-4,for Use in Preparing Preliminary Decommissioning Plan for Plant 1990-08-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20128G1421996-09-25025 September 1996 Advises NRC Approved Decommissioning Plan, Impact Of... Fsv Final Decommissioning, Satisfies All Elements of License Termination Plan as Required by Rev to Reactor Decommissioning Rule 10CFR50.82(a)(9) ML20136B2561996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Falsification of Radiation Survey Records.Revised NOV Encl ML20136B2731996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Util Failure to Assure Compliance w/10CFR50.9 Concerning Accuracy of Radiation Survey Records. Revised NOV Encl ML20136B3241996-04-0202 April 1996 Informs That NRC Will Be Withdrawing NOV ,based on Reevaluation of Evidence Provided & Response to NOV ML20058G9671993-12-0707 December 1993 Ack Receipt of Ltrs of 931110,responding to Notice of Violation & Proposed Imposition of Civil Penalty Issued on 931013 IR 05000267/19930021993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Rept 50-267/93-02. Deficiency Determined to Have Contributed to 930527 Crane Overload Event IR 05000267/19930011993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/93-01 ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20128D6931992-12-0101 December 1992 Forwards Exemption from Requirement in 10CFR50,app E,Section IV.F.2 to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise. EA & SE Also Encl ML20198C7511991-06-25025 June 1991 Suggests That Region Iv/Senior Util Executive Conference Be Held During Month of Sept 1991 in Arlington,Tx to Provide Open Forum for Candid Discussions Limited to Topics of General Interest & Not Pertain to Plant Specific Issues ML20058K0231990-11-30030 November 1990 Forwards Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted ML20062H8131990-11-29029 November 1990 Forwards Partially Withheld Insp Rept 50-267/90-18 on 901022-26 & Notice of Violation ML20062H2041990-11-21021 November 1990 Forwards Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted ML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247K9051989-09-19019 September 1989 Advises That 890726 Request for Approval of Route to Transport Spent Reactor Fuel Approved.Route,From Facility to DOE Inel in Idaho,Encl ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl 1998-07-20
[Table view] |
Text
-
s
. , April 6, 1987-g,
' Docket No. 50-267 Mr..R. O. Williams, Jr. .
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado '80201-0840
Dear Mr. Williams:
SUBJECT:
FORT ST. 'VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO. 52 TO FACILITY OPERATING LICENSE NO. DPR-34 The Commission has issued the enclosed Amendment No. 52 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical Specifications in response to your application dated May 10, 1984 (P-84137) as supplemented _by letter dated December 27, 1984 (P-84537).
This amendment increases the Circulator Speed-High Steam trip setting listed in Table 4.4-3 of the Fort St. Vrain Technical Specifications.
, A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next Bi-weekly Federal Register notice.
Sincerely, original signed by Herbert N. Berkow for Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Off.fce of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 52 to DPR-34
- 2. Safety Evaluation cc w/ enclosures:
i See next page DISTRIBUTION:
. 2 Docket Fileg) OGC WJones l PBSS Reading PNoonan EJordan ACRS (10)
NRC PDR KHeitner BGrimes OPA Local PDR 0 Lynch JPartlow LFMB HBerkow TBarnhart(4) LHarmon l
f5 dnan:cw PBSS h KHeitner PB [
OL' 'ch PB OGCryETH A phtA c
3[Q3/87 03/d/87 03 j/87 Hhe,6/87 O!f/ Op'/o//87 8704160173 870406 j PDR ADOCK 05000267 _
p PDR
t =
e SKfig Y
![gk k p, UNITED STATES NUCLEAR REGULATORY COMMISSION 5 :l' WASHINGTON, D. C. 20555
- %,,,,, April 6, 1987
{ Docket No. 50-267 4
Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
FORT ST. VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO. 52 TO FACILITY OPERATING LICENSE NO. DPR-34 -
The Commission has issued the enclosed Amendment No. 52 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical Specifications in response to your application dated May 10, 1984 (P-84137) as supplemented by letter dated December 27, 1984 (P-84537).
This amendment increases the Circulator Speed-High Steam trip setting listed in Table 4.4-3 of the Fort St. Vrain Technical Specifications.
A copy of the Safety Evaluation is enclosed., The Notice of Issuance will ' -
be included in the Connission's next Bi-weekly Federal Register notice. ,
Sincerely. -
enneth L.-Heftner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 52 to DPR-34
- 2. Safety Evaluation cc w/ enclosures:
See next page i .
l
.,m -- - -
,-+,,,-,y%- , ,, , .+----..,---,--,,----,..-r-y--- ....w--.--, . . , -.-. . , - - .- .-, .
Y Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain ec:
Mr. D. W. Warembourg, Manager Albert J. Hazie, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220
.._~_
Denver, Colorado 80201 Mr. David Alberstein,14/159A Mr. R. O. Williams, Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 '
Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager .
Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2
~
Plattevili , Colorado 80651
- Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 02nver, Colorado 80201-0840 E Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program
- 31 -
Room 900 . Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 ,
Regional Administrator, Region IV "
U.S. Nuclear Regulatory Commission ~ ~
611 Ryan Plaza Drive, Suite 1000 Arlington Texas 76011 Chairman, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 a