Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20084C58916 April 1984Xcel Energy
Warembourg D
Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant MonitoringOther
ML20084Q43610 May 1984Xcel Energy
Lee O
Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective ActionsRequest
ML20084Q42210 May 1984Xcel Energy
Lee O
Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective ActionsRequest
ML20084Q44410 May 1984Xcel EnergyProposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations EnclOther
ML20092P62626 June 1984Xcel Energy
Lee O
Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor StartupOther
ML20090C5266 July 1984Xcel Energy
Lee O
Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 MeetingMeeting
ML20094D77418 July 1984Xcel Energy
Lee O
Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action DescribedOther
ML20096C03221 August 1984Xcel Energy
Lee O
Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions ListedOther
ML20098B3057 September 1984Xcel Energy
Gahm J
Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily DiscontinuedOther
ML20093K19424 September 1984Xcel Energy
Gahm J
Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch IndicationOther
ML20099K7278 November 1984Xcel Energy
Gahm J
Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable FailureOther
ML20112C04927 December 1984Xcel Energy
Lee O
Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value EnclRequest
ML20112G5064 January 1985Xcel Energy
Lee O
Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 MeetingsMeeting
ML20106B53125 January 1985Xcel Energy
Brey H
Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be SubmittedOther
05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided28 January 1985Xcel Energy
Brey H
Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be ProvidedOther
ML20106B53331 January 1985Xcel Energy
Warembourg D
Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228Other
ML20132G50212 March 1985Bennett D
LOS ALAMOS NATIONAL LABORATORY
Fly G
Fugelso L
Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain RestartOther
ML20112G46318 March 1985Xcel Energy
Warembourg D
Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326Other
ML20100H11226 March 1985Xcel Energy
Warembourg D
Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 CommitmentOther
ML20117M05926 April 1985Xcel Energy
Singleton L
Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High QualityOther
ML20132C97817 May 1985Office of Nuclear Reactor RegulationSafety Evaluation Re CRD InstrumentationApproval
ML20126B62920 May 1985Xcel Energy
Brey H
Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of DiodesOther
ML20127J8227 June 1985Xcel Energy
Warembourg D
Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High TempsOther
ML20127K6377 June 1985Xcel Energy
Lee O
Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp AnticipatedOther
ML20127L88513 June 1985Xcel Energy
Warembourg D
Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design MarginsOther
ML20127N69514 June 1985Xcel Energy
Brey H
Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical SysOther
ML20209E89925 June 1985Xcel Energy
Lee O
Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results EnclOther
ML20132C9481 July 1985INC.
EG&G IDAHO
Barnes B
Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of CoOther
ML20132E6233 July 1985Xcel Energy
Lee O
Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown MatlOther
ML20132C93912 July 1985Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Forwards Eg&G 850701 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co, Per Util 850613 Submittal.Installed Bearings Acceptable Replacements for Original Design.Review of 850607 Submittal Also EnclApproval
ML20134E86517 July 1985Xcel EnergyIssue 1 to Procedure SR-TE-9-X, Inserted Rod Position VerificationOther
ML20134E86031 July 1985Xcel Energy
Gahm J
Forwards Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification, in Response to Concerns Discussed at 850221 Meeting & inMeeting
ML20138Q92219 December 1985Xcel Energy
Warembourg D
Informs of Inability to Meet 851230 Completion Date of High temp,300 F,Crd Mechanism Test & Preliminary Evaluation,Due to Difficulties,Including Orifice Valve on Mechanism.Final Rept Will Be Submitted by 860331Other
ML20199D34111 June 1986Office of Nuclear Reactor Regulation
Heitner K
Forwards Evaluation of Util Response to 851003 Review of Performance Enhancement Program.Method Should Be Provided to Confirm Functional Acceptability of Equipment Prior to Return to SvcApproval
ML20206B3306 April 1987Berkow H
Office of Nuclear Reactor Regulation
Requests Fr Publication of Notice of Issuance of Amend 52 to License DPR-34,increasing Circular Speed High Steam Trip Setting Listed in Table 4.4-3 of Tech SpecsApproval
ML20206J9336 April 1987NRCSafety Evaluation Supporting Amend 52 to License DPR-34Approval
ML20206J8416 April 1987Berkow H
Office of Nuclear Reactor Regulation
Amend 52 to License DPR-34,increasing Circulator speed-high Steam Trip Setting Listed in Table 4.4-3 of Tech SpecsOther
ML20206J7486 April 1987Office of Nuclear Reactor Regulation
Heitner K
Forwards Amend 52 to License DPR-34 & Safety Evaluation. Amend Increases Circulator speed-high Steam Trip Setting in Table 4.4-3 of Tech SpecsApproval