ML20098B305
Letter Sequence Other | |
---|---|
TAC:55294, (Approved, Closed) | |
Questions
Results Other: 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided, ML20084C589, ML20084Q444, ML20092P626, ML20093K194, ML20094D774, ML20096C032, ML20098B305, ML20099K727, ML20100H112, ML20106B531, ML20106B533, ML20112G463, ML20117M059, ML20126B629, ML20127J822, ML20127K637, ML20127L885, ML20127N695, ML20132C948, ML20132E623, ML20132G502, ML20134E865, ML20138Q922, ML20206J841, ML20209E899 | |
MONTHYEARML20084C5891984-04-16016 April 1984
[Table View]Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant Monitoring Project stage: Other ML20084Q4361984-05-10010 May 1984 Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4221984-05-10010 May 1984 Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4441984-05-10010 May 1984 Proposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations Encl Project stage: Other ML20092P6261984-06-26026 June 1984 Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor Startup Project stage: Other ML20090C5261984-07-0606 July 1984 Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting Project stage: Meeting ML20094D7741984-07-18018 July 1984 Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action Described Project stage: Other ML20096C0321984-08-21021 August 1984 Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions Listed Project stage: Other ML20098B3051984-09-0707 September 1984 Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily Discontinued Project stage: Other ML20093K1941984-09-24024 September 1984 Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch Indication Project stage: Other ML20099K7271984-11-0808 November 1984 Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable Failure Project stage: Other ML20112C0491984-12-27027 December 1984 Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value Encl Project stage: Request ML20112G5061985-01-0404 January 1985 Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 Meetings Project stage: Meeting ML20106B5311985-01-25025 January 1985 Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be Submitted Project stage: Other 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided1985-01-28028 January 1985 Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided Project stage: Other ML20106B5331985-01-31031 January 1985 Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228 Project stage: Other ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart Project stage: Other ML20112G4631985-03-18018 March 1985 Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326 Project stage: Other ML20100H1121985-03-26026 March 1985 Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 Commitment Project stage: Other ML20117M0591985-04-26026 April 1985 Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High Quality Project stage: Other ML20132C9781985-05-17017 May 1985 Safety Evaluation Re CRD Instrumentation Project stage: Approval ML20126B6291985-05-20020 May 1985 Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of Diodes Project stage: Other ML20127J8221985-06-0707 June 1985 Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High Temps Project stage: Other ML20127K6371985-06-0707 June 1985 Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp Anticipated Project stage: Other ML20127L8851985-06-13013 June 1985 Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design Margins Project stage: Other ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys Project stage: Other ML20209E8991985-06-25025 June 1985 Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results Encl Project stage: Other ML20132C9481985-07-0101 July 1985 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co Project stage: Other ML20132E6231985-07-0303 July 1985 Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown Matl Project stage: Other ML20132C9391985-07-12012 July 1985 Forwards Eg&G 850701 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co, Per Util 850613 Submittal.Installed Bearings Acceptable Replacements for Original Design.Review of 850607 Submittal Also Encl Project stage: Approval ML20134E8651985-07-17017 July 1985 Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification Project stage: Other ML20134E8601985-07-31031 July 1985 Forwards Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification, in Response to Concerns Discussed at 850221 Meeting & in Project stage: Meeting ML20138Q9221985-12-19019 December 1985 Informs of Inability to Meet 851230 Completion Date of High temp,300 F,Crd Mechanism Test & Preliminary Evaluation,Due to Difficulties,Including Orifice Valve on Mechanism.Final Rept Will Be Submitted by 860331 Project stage: Other ML20199D3411986-06-11011 June 1986 Forwards Evaluation of Util Response to 851003 Review of Performance Enhancement Program.Method Should Be Provided to Confirm Functional Acceptability of Equipment Prior to Return to Svc Project stage: Approval ML20206B3301987-04-0606 April 1987 Requests Fr Publication of Notice of Issuance of Amend 52 to License DPR-34,increasing Circular Speed High Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Approval ML20206J9331987-04-0606 April 1987 Safety Evaluation Supporting Amend 52 to License DPR-34 Project stage: Approval ML20206J8411987-04-0606 April 1987 Amend 52 to License DPR-34,increasing Circulator speed-high Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Other ML20206J7481987-04-0606 April 1987 Forwards Amend 52 to License DPR-34 & Safety Evaluation. Amend Increases Circulator speed-high Steam Trip Setting in Table 4.4-3 of Tech Specs Project stage: Approval 1985-03-12 |
ML20098B305 | |
Person / Time | |
---|---|
Site: | Fort Saint Vrain |
Issue date: | 09/07/1984 |
From: | Gahm J PUBLIC SERVICE CO. OF COLORADO |
To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
References | |
P-84341, TAC-55294, NUDOCS 8409260019 | |
Download: ML20098B305 (2) | |
Similar Documents at Fort Saint Vrain | |
---|---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20085N1451991-11-0505 November 1991
[Table view]Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20141D9651986-03-27027 March 1986 Ro:On 860314,compensatory Measures Implemented Due to Announcement of Bomb at Level 5 Reactor Door.Caused by Contract Employee,Unaware of Seriousness of Threat.No Bomb Found & No Threat to Security Existed ML20099C9631984-10-29029 October 1984 Ro:On 840911,moisture Discovered in Purified Helium Supply Line Wells During Installation of New Moisture Sensing Probes.Tests Indicate Leak Source Is Circulator Penetration A.Rate of Leak Approx .05 Gpm ML20098B3051984-09-0707 September 1984 Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily Discontinued ML20092N4741984-06-18018 June 1984 Ro:Re Failure of Masoneilan C-domotor Actuator During Steam Line Rupture Simulation Testing.Corrective Actions:Closed Shutoff Valves Installed Between Gauges & Taps.Gauges, W/Welded Stainless Steel Bourdon Tubes,Ordered ML20082A8431983-11-0707 November 1983 RO 83-43:on 831011,util Notified NRC of Various Nonconservative Errors Made in Original Analyses Which Constitute Basis of Tech Spec 4.1.9.GA Technologies Provided Interim Curves Which Corrected Deficiencies ML20069H1061983-03-17017 March 1983 RO 83-007:on 830215,instrument Power Inverter 1B Failed. Caused by Blown 150 Amp Fuse.Reactor Manually Scrammed, Instrument Bus re-energized & Blown Fuse Replaced ML20054F8461982-06-0909 June 1982 Ro:On 820605,one of Two Undervoltage Relays Which Monitor Reserve Auxiliary Transformer Tripped,Causing Load Shedding of Essential Busses 1 & 2.Caused by Procedural Inadequacy ML20054H2391982-05-0404 May 1982 Ro:On 820426,crack Found Extending Across Min cross-section Between Coolant Hole & One Face of Fuel Element 1-2415 Down Full Length of Block to Lower Exit.Caused by Mishandling. Damage Does Not Extend to Dowel Pin ML20064G7251978-12-0707 December 1978 Suppl Info to RO 50-267/78-05/03-X-1 on 781107:during Oper at 13% Thermal & 0 Elec Pwr,One of Three 1A Circulator Speed Indication Channels Was at 0,due to Bridge Unbalance.Similar Problem Occurred 7 Times Since 780425 ML20064G5661978-12-0505 December 1978 on 781129 at 4:00 Pm,Due to Problem in Heluim Circulatory Sys,There Was a Minute Release of Radioactivity in Reactor Bldg.No Hazard to Public ML20085L6121976-09-30030 September 1976 RO 50-267/75/05B:on 750323,helium Circulators 1A & 1B Tripped & Buffer Differential Pressure Indication of Helium Circulators 1C & 1D Dropped.Caused by Increased Pressure in Surge Tanks Due to Water Inflow.Procedures Revised ML20085M6621975-12-18018 December 1975 RO 50-267/75/17A:on 750912,orifice Valve Assembly Associated W/Control Rod Drive Observed Falling Vertically from Normally Installed Position.Caused by Improper Final Assembly of Control Rod Drive Unit ML20085M5851975-12-15015 December 1975 RO 50-267/75/18A:on 750924,while Removing Boron Carbide Balls from Reserve Shutdown Assembly of Control Rod Drive, Serial Number 28,core Region 13,light Deposit of White Crystal Noted on Surface of Several Balls ML20085M5141975-11-18018 November 1975 RO 50-267/75/20:on 751024,reactor Plant Supply Fan 1B Developed Fault,Causing Reactor Plant MCC 3 Essential Bus to Be Out of Svc During Repair of Fan 1A.Caused by Loose Electrical Connection.Bus & Motor Meggered & Verified ML20085M5381975-10-17017 October 1975 RO 50-267/75/16:on 751009,apparent Failure of Control Sys for Circulator High Pressure Separator C Resulted in Flooding of High Pressure Separator.Low Selector Removed, Disassembled,Inspected & Cleaned ML20085M6141975-10-17017 October 1975 RO 50-267/75/19:on 750926,spare Control & Orifice Assembly Modified by Addition of New Seals to Reduce Helium Bypass Flow.Caused by Seal Ring Larger in Outside Diameter than Inside Diameter at Refueling Penetration ML20085M6021975-10-13013 October 1975 RO 50-267/75/13A:on 750911,fan Start Relay for 480-volt Transformer 1B Failed.Caused by Component Failure & Design Flaw.Relays Replaced W/Better Application & Relay Logic Circuitry Reversed to Require Deenergized Relay ML20085M6071975-10-0909 October 1975 RO 50-267/75/13:on 750911,fan Start Relay for 480-volt Tansformer 1B Failed.Caused by Component Failure & Design Flaw.Relays Replaced W/Better Application & Relay Logic Circuitry Reversed Requiring Deenergized Relay ML20085M5521975-10-0202 October 1975 RO 50-267/75/17:on 750912,orifice Valve Assembly Associated W/Control Rod Drive Observed to Have Fallen Vertically Downward from Installed Position.Caused by Improper Final Assembly of Control Rod Drive Unit ML20085M5941975-09-30030 September 1975 RO 50-267/75/18:on 750924,during Removal of Boron Carbide Balls from Reserve Shutdown Hopper Assembly of Control Rod Drive,Serial Number 28,core Region 13,light Deposit of White Crystal Noted on Surface of Several Balls ML20081J5621975-09-29029 September 1975 RO 50-267/75/14:on 750829,480-volt Bus Tie Breaker Between Bus 2 & 3 Opened Removing Power from 280-volt Bus 2.Caused by Opening of Bus Tie Breaker.Tie Breaker Trip Settings Adjusted ML20085L6381975-07-21021 July 1975 RO 50-275/75/8:on 750428,insp Revealed That Adequate Fire Stops in Vertical Cableways Between Floors in Reactor Bldg, in Horizontal Cable Trays & in Vertical Cable Ducts Not Installed Per FSAR Commitment.Cause Not Stated ML20085L5981975-06-18018 June 1975 RO 50-267/75/10:on 750428,analysis of Pcrv Cooling Tube Outlet Temps Revealed Four Tubes W/Temp of 24 F.Caused by Differential Pressure Driving Control Rods Into Annulus. Drive Housings Will Be Modified ML20085M7461975-06-17017 June 1975 RO 50-267/75/2A:on 750115,both Secondary Coolant Loops Appeared Isolated Simultaneously by PPS Action.Caused by Design Error.Capacitors Added Across Collector Load of Output Buffer Transistors ML20085L6341975-05-29029 May 1975 RO 50-267/75/12:on 750516,engine B Failed to Start Due to Fuel Sys Airlock.Caused by Fuel Being Shut Off W/O Engine Being Removed from Svc.Procedure Will Be Revised ML20085L6221975-05-0707 May 1975 RO 50-267/75/7:on 750428,temporary Cables from Auxiliary Electrical Equipment Cabinets Not Segregated from Permanent Cables.Cause Not Stated.Work Authorization Issued to Correct Color Coding ML20085L6391975-04-30030 April 1975 RO 50-267/75/6:on 750402,bearing Water Makeup Pump P-2105 Handswitch Insp Revealed Discrepancies in Maintaining Bus Segregation Requirements.Cause Not Stated.Field Change Notice Issued to Correct Discrepancies ML20085L6981975-04-18018 April 1975 RO 50-267/75/5:on 750323,circulators a & B Tripped Off & Buffer Indications on Circulators C & D Dropped.Caused by Increased Pressure in Surge Tanks Due to Water Inflow Displacing Helium & Increasing Suction Pressure ML20085L6521975-03-14014 March 1975 RO 50-267/75/4:on 750213,control Rod & Orifice Position Indicators Operated Erratically Due to High Moisture Levels in Primary Coolant Circuit.Caused by Shutdown of Purification Sys.Potentiometer Test Developed ML20085L7251975-03-0404 March 1975 RO 50-267/75/3:on 750203,drop in Loop 2 Instrument Bus Voltage Caused Loop 1 Helium Circulator to Trip.Cause Not Stated ML20085L7791975-03-0404 March 1975 RO 50-267/75-1-A:on 750117,insp Revealed Discrepancies in Maintaining Loop & Bus Segregation Requirements.Caused by Error in Installation.Wires,Switches & Relays Not Meeting Segregation Requirements Separated ML20085L7831975-01-31031 January 1975 RO 50-267/75/1:on 750117,insp Revealed Discrepancies in Maintaining Loop & Bus Segregation.Caused by Error in Installation.Wires,Switches & Relays Separated ML20085L7971975-01-14014 January 1975 RO 50-267/75/2:insp of Steam/Water Dump Valves Revealed That Portions of Electrical Conduit Runs to Valves Violated Loop & Bus Segregation Criteria.Caused by Improper Installation. Cables,Switches,Solenoids & Junction Boxes to Be Modified ML20086E2261974-11-0606 November 1974 RO 50-267/74/1:on 741106,during Review,Short That Could Potentially Lead to Loss of Both Power Supplies on Circulatory Auxiliary Control Panel I-29 Discovered.Caused by Design Error.Three Wires Removed ML20086E2091974-01-14014 January 1974 Ro:On 740112,during Insp of Permanent Half Size Top Reflector,Seven Elements Failed to Meet Specs for Chips & Gauges.Spare Reflectors Replaced Failed Elements.Great Lakes Carbon,Supplier of Elements,Contacted ML20086E1951974-01-14014 January 1974 Ro:On 740114,during Insp of Metal Clad Keyed Top Reflector Elements,Burrs Found on Drilled Holes in Bottom of Distribution Plate.Seven Elements Installed Will Be Removed. Procedure from Ga Co Awaited ML20086B1431971-10-29029 October 1971 Ro:On 710514,0819 & 0924,reactor Trip Breakers Failed to Open When Trip Signal Applied.After Investigation, Westinghouse Determined Undervoltage Device Latch Spring Pressure Improperly Set.Devices Adjusted 1991-11-05 Category:TEXT-SAFETY REPORT MONTHYEARML20196G6731997-07-0101 July 1997
[Table view]Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01 |
Text
r: -(
l Y CCEGI"S$D l
16805 WCR 19 1/2, Platteville, Colorado 80651 1 I
$ ~L b 7 il.y September 7, 1984 h pr n ja gg gh - Fort St. Vrain i Unit #1
! P-84341 SEP i 4 884
[l;n __
C' Mr. John T. Collins Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 -
Arlington, TX 76011 ATTN: Eric Johnson s
SUBJECT:
Existing Condition on the Fort St. Vrain Refueling Floor
Dear Mr. Johnson:
This . letter is to provide you with a description of a situation at Fort St. Vrain that has temporarily delayed control rod drive refurbishing efforts. This situation was discussed with you and Phil Wagner during a telecon on September 4, 1984.
While removing a control rod drive and orifice assembly (CRD0A) from Region 7 for maintenance, a motor over-current condition on the auxiliary transfer cask (ATC) shutters occurred, preventing their full closure. Work was discontinued, and an investigation of the possible causes bega-The'"ATC shutters were opened, and an attempt to lower and reinstall the CRDOA into the core was made. The mechanism could not be completely seated in the penetration, so the CRDOA was again withdrawn from the core into the ATC. Once this -was completed, a radiation survey was performed around the ATC. This indicated an abnormal radiation profile for a fully retracted control rod pair in the ATC, introducing the possibility that the control rod (s) were not fully retracted. The ATC shutter drive shafts were removed, and a borescope was inserted for visual examination. These examinations revealed that one of the two control rod strings was not fully retracted.
8409260019 840907
- - PDR ADOCK 05000267 8 eD" foo (pp ll0 'M
y ,
3
'O A special test was conducted- on September 5, 1984, with Messrs. Chaney and Plumlee of the NRC on-site and cognizant. This test involved lifting the ATC approximately 4 inches to verify borescope observations and to obtain radiation level data. Video tape taken during the test revealed that indeed only one control rod string was not . fully retracted. Radiation levels at the circumference of the ATC were on the order of 5 R/hr. This corresponds to approximately 80 R/hr at one foot from the control rod string.
All CRD0A work has been discontinued until it is established that the CRDOA can be removed fr,m the reactor in accordance with Fort St.
Vrain licensing -requirements and without causing unnecessary health hazards to plant personnel.
As always,- Public Service Company will keep the Nuclear Regulatory Commission abreast of the existing conditions. If you have any questions please . contact Mr. Chuck. Fuller, of my staff, at (303) 785-2224, extension 202.
Sincerely, 4 W. Gahm
,f ).
Manager, Nuclear Production JWG/dkh J