ML20006B209

From kanterella
Jump to navigation Jump to search
Forwards Fire Operability Requirements 3 & 14,Issues 3 & 4, Respectively,To Fire Protection Program Plan,Section FP.6.1. Changes Cover Halon Sys & Basis & Records Ctr Halon Sys
ML20006B209
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/26/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006B210 List:
References
P-90019, NUDOCS 9002010096
Download: ML20006B209 (5)


Text

r , a h..Public Service

P.O. Box 840 Denver CO 80201 0840 A. Clegg Crawford January 26, 1990 vu p,niaoni Nuclear operations Fort St. Vrain Unit No. 1 P-90019 U.S . Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Docket No. 50-267

SUBJECT:

FPOR-3, Issue 3 FPOR-14, Issue 4

REFERENCE:

NRC Letter Heitner to.

Williams, dated May 18, 1989 (G-89185)

Gentlemen:

Enclosed is one signed original and ten additional copies of the Fire Protection Operability Requirements (FPO.is) 3 and 14 (Issue 3 and Issue 4, respectively) and the revised Table of Contents (TOC), Issue

6. The TOC and FPORs are contained in Section FP.6.1 of the Fort St.

Vrain (FSV) Fire Protection Program Plan as approved in the referenced letter. FPOR-3 and FPOR-14 are being submitted under the requirements of 10CFR50.71(e),

The attachment to this letter is a summary of the changes to the FPORs. A 100FR50.59 safety evaluation was performed on these issues l of FPOR-3 and FPOR-14. The evaluation determined that the revisions l were not safety related, were not safety significant and did not involve or create an unreviewed safety question. The revisions do' not require changes to the FSV Technical Specifications.

If you have any questions or comments, please contact Mr. M. H.

Holmes at (303) 480-6960.

Very truly yours,

(/ .

A. Clegg Crawford Vice President Nuclear Operations 9002010096 900126 "

PDR ADOCK 05000267 1 F PDC [

7-s f1 r- .

' !x  ;

r -,- .

l P-90019 January'26, 1990 ACC/DLF/km .-

Atta'chment Enclosures Regional Administrator,; Region-IV cc:

ATTN: Mr. T. F-. Westerman, Chief Projects Section B .

(with one copy of Enclosures)

Mr. R. J. Farrell Senior Resident Inspector-Fort St. Vrain ,;

~

(Enclosures previously delivered)- -

1

'l2

\',

'*+

<I h

l l: - ~ 4- . m, _ m 4m . . ,,~%,, m. sm. .* Ed

7, 7 s

S

SUMMARY

OF CHANGES FPOR-3 For consistency between the FPOR, FPPP and FSAR, the." Records Center" name is changed in the list of Halon Systems and the BASIS for FPOR-3.

The operability ' requirement for the Records Center Halon System 1s moved from ACTION statement 2 'to ACTION statement 1. ACTION-statement 2 applies only to the Security Computet Room.

The BASIS FOR FPOR-3 has been updated to discuss and explain the ACTION statements for the different Halon systems.

FPOR-14 Table .FPOR-14-1 has been updated to include three Records Center:

doors..

Bi 11 ding 10 door. D9, name has been corrected.

i l1

<