Other: 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided, ML20084C589, ML20084Q444, ML20092P626, ML20093K194, ML20094D774, ML20096C032, ML20098B305, ML20099K727, ML20100H112, ML20106B531, ML20106B533, ML20112G463, ML20117M059, ML20126B629, ML20127J822, ML20127K637, ML20127L885, ML20127N695, ML20132C948, ML20132E623, ML20132G502, ML20134E865, ML20138Q922, ML20206J841, ML20209E899
|
MONTHYEARML20084C5891984-04-16016 April 1984 Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant Monitoring Project stage: Other ML20084Q4361984-05-10010 May 1984 Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4221984-05-10010 May 1984 Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions Project stage: Request ML20084Q4441984-05-10010 May 1984 Proposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations Encl Project stage: Other ML20092P6261984-06-26026 June 1984 Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor Startup Project stage: Other ML20090C5261984-07-0606 July 1984 Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting Project stage: Meeting ML20094D7741984-07-18018 July 1984 Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action Described Project stage: Other ML20096C0321984-08-21021 August 1984 Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions Listed Project stage: Other ML20098B3051984-09-0707 September 1984 Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily Discontinued Project stage: Other ML20093K1941984-09-24024 September 1984 Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch Indication Project stage: Other ML20099K7271984-11-0808 November 1984 Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable Failure Project stage: Other ML20112C0491984-12-27027 December 1984 Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value Encl Project stage: Request ML20112G5061985-01-0404 January 1985 Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 Meetings Project stage: Meeting ML20106B5311985-01-25025 January 1985 Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be Submitted Project stage: Other 05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided1985-01-28028 January 1985 Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided Project stage: Other ML20106B5331985-01-31031 January 1985 Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228 Project stage: Other ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart Project stage: Other ML20112G4631985-03-18018 March 1985 Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326 Project stage: Other ML20100H1121985-03-26026 March 1985 Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 Commitment Project stage: Other ML20117M0591985-04-26026 April 1985 Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High Quality Project stage: Other ML20132C9781985-05-17017 May 1985 Safety Evaluation Re CRD Instrumentation Project stage: Approval ML20126B6291985-05-20020 May 1985 Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of Diodes Project stage: Other ML20127J8221985-06-0707 June 1985 Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High Temps Project stage: Other ML20127K6371985-06-0707 June 1985 Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp Anticipated Project stage: Other ML20127L8851985-06-13013 June 1985 Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design Margins Project stage: Other ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys Project stage: Other ML20209E8991985-06-25025 June 1985 Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results Encl Project stage: Other ML20132C9481985-07-0101 July 1985 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co Project stage: Other ML20132E6231985-07-0303 July 1985 Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown Matl Project stage: Other ML20132C9391985-07-12012 July 1985 Forwards Eg&G 850701 Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co, Per Util 850613 Submittal.Installed Bearings Acceptable Replacements for Original Design.Review of 850607 Submittal Also Encl Project stage: Approval ML20134E8651985-07-17017 July 1985 Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification Project stage: Other ML20134E8601985-07-31031 July 1985 Forwards Issue 1 to Procedure SR-TE-9-X, Inserted Rod Position Verification, in Response to Concerns Discussed at 850221 Meeting & in Project stage: Meeting ML20138Q9221985-12-19019 December 1985 Informs of Inability to Meet 851230 Completion Date of High temp,300 F,Crd Mechanism Test & Preliminary Evaluation,Due to Difficulties,Including Orifice Valve on Mechanism.Final Rept Will Be Submitted by 860331 Project stage: Other ML20199D3411986-06-11011 June 1986 Forwards Evaluation of Util Response to 851003 Review of Performance Enhancement Program.Method Should Be Provided to Confirm Functional Acceptability of Equipment Prior to Return to Svc Project stage: Approval ML20206B3301987-04-0606 April 1987 Requests Fr Publication of Notice of Issuance of Amend 52 to License DPR-34,increasing Circular Speed High Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Approval ML20206J9331987-04-0606 April 1987 Safety Evaluation Supporting Amend 52 to License DPR-34 Project stage: Approval ML20206J8411987-04-0606 April 1987 Amend 52 to License DPR-34,increasing Circulator speed-high Steam Trip Setting Listed in Table 4.4-3 of Tech Specs Project stage: Other ML20206J7481987-04-0606 April 1987 Forwards Amend 52 to License DPR-34 & Safety Evaluation. Amend Increases Circulator speed-high Steam Trip Setting in Table 4.4-3 of Tech Specs Project stage: Approval 1985-03-12
[Table View] |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20246J3261989-08-30030 August 1989 Safety Evaluation Supporting Amend 72 to License DPR-34 ML20245J3781989-08-14014 August 1989 Safety Evaluation Supporting Amend 71 to License DPR-34 ML20245J4511989-08-0808 August 1989 Safety Evaluation Responding to Issues Re Tech Spec Upgrade & Plant Defueling.Stated Tech Spec Sections Should Be Upgraded ML20246J3131989-07-0707 July 1989 Safety Evaluation Concluding That Operators Role in Mitigating High Energy Line Break at Facility Acceptable ML20247R2261989-05-26026 May 1989 Final Safety Evaluation Re LER 87-20 Concerning Interactions Between Steamline Rupture Detection/Isolation Sys,Plant Protective Sys & Control Sys at Facility ML20245C5031989-04-18018 April 1989 Safety Evaluation Supporting Amend 70 to License DPR-34 ML20248D6501989-03-31031 March 1989 Safety Evaluation Supporting Amend 69 to License DPR-34 ML20236A1401989-02-27027 February 1989 Safety Evaluation Supporting Amend 68 to License DPR-34 ML20235T4511989-02-24024 February 1989 Safety Evaluation Re Facility Core Support Flow Vent Sys. Continued Operation of Facility W/Current Core Support Flow Sys Configuration Acceptable ML20235J3421989-02-16016 February 1989 Safety Evaluation Supporting Util Action in Response to Generic Ltr 83-28,item 2.1 (Part 2) Confirming Establishment of Interface W/Either NSSS Vendor or Vendors of Each Component in Reactor Trip Sys ML20235J3841989-02-13013 February 1989 Safety Evaluation Concluding That Continued Operation of Facility Not Affected by Steam Generator Tube Failures Experienced by Advanced gas-cooled Reactors ML20195D3911988-10-27027 October 1988 Safety Evaluation Supporting Corrective Actions of LER 86-017 ML20205G0021988-10-24024 October 1988 Safety Evaluation Supporting Amend 65 to License DPR-34 ML20154J8021988-09-15015 September 1988 Safety Evaluation Supporting Amend 64 to License DPR-34 ML20154J4621988-09-15015 September 1988 Safety Evaluation Supporting Amend 63 to License DPR-34 ML20207F0571988-08-10010 August 1988 Safety Evaluation Supporting Util 870206 Submittal Re Safe Shutdowns During Postulated Accident Conditions ML20207F0431988-08-0505 August 1988 Safety Evaluation Supporting Amend 61 to License DPR-34 ML20207F2411988-08-0505 August 1988 Safety Evaluation Supporting Amend 62 to License DPR-34 ML20151M1601988-07-21021 July 1988 Safety Evaluating Supporting Requirements for Redundancy in Responding to Rapid Depressurization Accident ML20151A9961988-06-20020 June 1988 Safety Evaluation Supporting Amend 60 to License DPR-34 ML20195K0651988-06-15015 June 1988 SER Concurring W/Util Proposed Corrective Actions in Engineering Rept Entitled, Rept of Helium Circulator S/N 2101 Damage & Inlet Piping S/N 2001 Repair & Mod Activities ML20195F9661988-06-15015 June 1988 Safety Evaluation Re Destructive Exam Rept for Fuel Test Assembly-2.Fuel Represented by Fuel Test Assembly-2 Predicted to Be Safe for Operation in Facility for 1,800 EFPDs ML20154F8891988-05-10010 May 1988 Safety Evaluation Re Proposed Safe Shutdown Sys & Exemption Requests Concerning 10CFR50,App R.Licensee Request for Exemptions in Listed Areas Should Be Granted.Concept for Providing post-fire Shutdown Acceptable ML20148S6031988-04-0707 April 1988 Safety Evaluation Supporting Amend 59 to License DPR-34 ML20151B6651988-04-0101 April 1988 Supplemental Safety Evaluation Supporting Util Compliance w/10CFR50.App R Re Safe Shutdown DHR Capacity ML20150C4541988-03-10010 March 1988 Safety Evaluation Concluding That Seismic Analysis Methods for Bldg 10 & Walkover Structure Conservative.Gaps Provided Adequate to Accommodate Relative Motions Which Occur Between Subj Structures & Walkover Structure & Turbine Bldg ML20147C8181988-02-25025 February 1988 Safety Evaluation Supporting Changes to Interim Tech Specs 3/4.1.7, Reactivity Change W/Temp NUREG-1220, Safety Evaluation Accepting Plant Special Senior Licensed Fuel Handler Initial & Requalification Operator Training Program,Per NUREG-1220, Training Review Criteria & Procedures1988-01-13013 January 1988 Safety Evaluation Accepting Plant Special Senior Licensed Fuel Handler Initial & Requalification Operator Training Program,Per NUREG-1220, Training Review Criteria & Procedures ML20237D7631987-12-18018 December 1987 Safety Evaluation Updating 861118 Fire Protection Sys Safety Evaluation.Util Alternate Fire Protection Configuration Acceptable ML20149E1621987-12-18018 December 1987 Marked-up Safety Evaluation Re Proposed Safe Shutdown Sys & Exemption Requests Concerning 10CFR50,App R ML20236U6961987-11-23023 November 1987 Safety Evaluation Supporting Amend 57 to License DPR-34. Addendum to Review of Proposed Tech Spec Change:Core Inlet Valves/Min Helium Flow & Max Core Region Temp Rise,Limiting Condition for Operation..., Technical Evaluation Rept Encl ML20236U5761987-11-20020 November 1987 Safety Evaluation Re Helium Circulator S/N C-2101 Damage. Util Corrective Action Program Initiated ML20236R3001987-11-13013 November 1987 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Programs for All safety-related Components ML20238C7621987-09-0202 September 1987 Safety Evaluation Concurring W/Util 870702 & 27 Ltrs & 870818 Telcon Re Elimination or Reduction of Maint Requirements on Certain Fire Seals ML20235N6491987-07-13013 July 1987 Safety Evaluation Supporting Amend 56 to License DPR-34 ML20235F5281987-07-0202 July 1987 Safety Evaluation Re Safe Shutdown of Steam Generator Matls. Under Severe Transient Conditions,Fuel Temp Can Be Maintained Under Accepted Temp Limits & Plant Can Be Safely Shutdown ML20235F5151987-07-0202 July 1987 Safety Evaluation Re Safe Emergency Shutdown of Reactor Sys. Operation at 82% Acceptable ML20235F5441987-07-0202 July 1987 Safety Evaluation Re Effect of Firewater Cooldown on Steam Generator Structural Integrity.All Tests Acceptable ML20235E5281987-06-29029 June 1987 Safety Evaluation Supporting Amend 55 to License DPR-34 ML20216G9511987-06-24024 June 1987 Revised Safety Evaluation Re Steam Line Rupture Detection & Isolation Sys (Slrdis).Slrdis Meets Requirements of 10CFR50, App A,Gdc 20 & GDC 4 ML20216G9911987-06-24024 June 1987 Supplemental Safety Evaluation Supporting Application for Amend to License DPR-34 Re Tech Specs for Steam Line Rupture Detection & Isolation Sys ML20215J5401987-06-22022 June 1987 Draft Safety Evaluation Re Safe Emergency Shutdowns.Facility Operation at 82% Power Acceptable ML20216J1921987-06-17017 June 1987 Safety Evaluation Re Mods to Reduce Moisture Ingress Into Reactor Vessel.Periodic Insps & Preventive Maint Should Be Performed on Pertinent Components.Operational Performance Should Be Continuously Upgraded ML20214M4681987-05-20020 May 1987 Safety Evaluation Supporting Amend 54 to License DPR-34 ML20215J8271987-05-0505 May 1987 Safety Evaluation Supporting Amend 53 to License DPR-34 ML20209D7561987-04-22022 April 1987 Safety Evaluation Supporting Util 870211 Submittal Re Performance Enhancement Program,Finding 4-10 ML20206J9331987-04-0606 April 1987 Safety Evaluation Supporting Amend 52 to License DPR-34 ML20205S1141987-03-31031 March 1987 Safety Evaluation Accepting Util 831104 Response to Generic Ltr 83-28,Item 4.5.2, Reactor Trip Sys Reliability On-Line Testing. Facility Designed to Permit on-line Functional Testing,Including Testing of Reactor Trip Contactors 1997-05-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20196G6731997-07-0101 July 1997 Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01
[Table view] |
Text
.. .
ki y
/$ Ag UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 E j
\...../
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 52 TO FACILITY OPERATING LICENSE NO. DPR-34 PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION DOCKET NO. 50-267
1.0 INTRODUCTION AND BACKGROUND
By letter dated May 10, 1984 (P-84137), Pyblic Service Company of Colorado (PSC) requested the Circulator Speed-High Steam trip setting listed in Table 4.4-3 of the Fort St. Vrain Technical Specifications be changed. PSC stated that the proposed increase in trip setting would increase circulator availability while still providing for initiation of the necessary protective actions prior i to the maximum credible overspeed condition or the blade shedding 4 safety limit. This new setting would avoid unnecessary actuations of the circulator protective circuitry due to normal system transients - '
at or near 100% power operation. The proposed increase in maximum trip setting, from 11,000 rpm (115% of rated) to 11,700 rpm (123% of rated), would still provide the automatic protective actions
- conservatively prior to the credible overspeed condition (135%) as ,
1 designed. Due to the almost instantaneous overspeed reaction under
, postulated control or piping failures, the proposed increase would-be -
insignificant from a system sensing and time response standpoint.
- Additional information was provided in a letter dated December 27, 1984(P-84537).
2.0 EVALUATION 2.1 Materials Considerations It does not appear that the overspeed setpoint is, in any way, a materials engineering consideration because a change in the setpoint would not change the overspeed actually experienced by the turbine.
Therefore, from the materials aspect, such a setpoint change is of no consequence. It should be noted that the calculated blade shedding speed is 273% of design and the proposed setpoint increase is from B704160214 870406 -
{DR ADOCK 05000267 PDR
\. ,
l l
I U
115% to 123% of rated speed. Generally, a plant trip imposes themal stress upon materials and is, therefore undesirable, and, in l
the case of the subject turbine setpoint, unnecessary. The basis is that the higher setpoint will not increase the probability of an accident, but will decrease the number of plant trips. The staff therefore concludes that the higher setpoint would not involve a significant increase in the probability or consequences of an accident previously evaluated, nor create the possibility of a new or different kind of accident, nor involve a significant reduction in any margin of safety. Additionally, a r' eduction in trips would probably be beneficial to the materials involved.
2.2 Instrumentation Consideration '
The current setpoint for the trip of the helium circulator on steam -
turbine drive is 11,000 rpm. This provides protection to assure that the circulator does not exceed the design speed limit of 13,000 rpm.
For steam line ruptures downstream of the circulator steam turbine, the maximum speed is 13,264 rpm with.no centrol action or overspeed trip. Therefore, this event does not establish a limit for an acceptable high speed setpoint.
With the presently assumed overspeed trip value, the maximum transient ovespeed for a loss of restraining torque event (blade shedding) is 13,050 rpm. Reanalysis with an assumed overspeed trip value of 11,500 rpm results in a maximum transient overspeed of 13,267 rpm. Based on these ,
i analyses, it is extrapolated that an assumed overspeed trip at .
11,700 rpm would result in a maximum transient overspeed of 13,370 rpm or less.
Therefore, based on this analysis, the staff concludes that an assumed 4 overspeed trip value of 11,700 rpm provides an acceptable basis for .
I determining the trip setpoint for this protection function. With .
the allowance for instrument uncertainty the overspeed trip setpoint will be 11,495 rpm.
O 2.3 Systems Consideration The circulator trip overspeed function is primarily provided to protect the individual circulators from damage due to an overspeed transient. However, even the loss of an individual circulator is not critical, since only one of four circulators is needed for safe shutdown. Hence, this change to an equipment protective function has very little consequence for overall plant safety, and is, therefore, acceptable.
l
3.0 ENVIRONMENTAL CONSIDERATION
The amendment involves a change in the installation or use of a ,
facility component located within the restricted area. The staff.has determined that the amendment involves no significant increase in the '
amounts, and no significant change in the types, of any effluents L
~ ~ . _ _ _ _ _ _ , - _ _ _ _ _ _ _ _ . _
[
l that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that this amendment involves no significant hazards consideration and there has been no public comment on such finding. Accordingly, this amendment meets the eli for categorical exclusion set forth in 10 9). CFR $51.22(c)(gibili Pursuant to 10 CFR 551.22(b), no Environmental Impact Statement or Environmental Assessment need be prepared in connection with the issuance of this amendment.
4.0 CONCLUSION
We have concluded, based on the' considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2)'such' activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public. ,
Dated: April 6, 1987 Principal Contributor: K. Heitner, DPWRL-B t