Forwards Rev 4 to Updated Fire Protection Plan
ML20055H281
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/20/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055H282 List:
References
P-90230, NUDOCS 9007260001
Download: ML20055H281 (4)


Text

- -

O hJulyPublic Service'  :::"'".L.-

8 20, 1990 $J , "cE 80201 0840 Fort St. Vrain Unit No. 1 A. Clegg Crawford EcN*oNEn.

V. S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

Fort St. Vrain Updated FPPP, Revision 4

REFERENCE:

1) PSC Letter, Bre i 18, 1990 (P-90227) y to Document Control Desk, dated July Gentlemen:

Enclosed is one (1) signed original and ten (10) additional copies of~

Revision 4 to the Fire Protection Program Plan (FPPP) for Fort St.

Vrain (FSV) which has been prepared and is being submitted in accordancewith10CFR50,Section50.71(e).

This revision includes the effects of changes made to the facility and procedures as described in the Updated FSAR; safety evaluations performed by PSC, either in support of license amendments or in support of conclusions that changes did r.ot involve an unreviewed safety question; and analyses of new etiety issues performed by or on behalf of PSC at Commission request.

Brief descriptions of the principal changes or additions to affected sections of the FPPP, Revision 4, are included in the' attachment.

-10CFR50.71(e)(ii) requires that this submittal identify changes made-under the provisions of 10CFR50.59 but not previously submitted to the Commission. All changes reflected in Revision 4 of the FPPP, that were under the provisions of 10CFR50.59, are identified in the 'i l 1990 10CFR50.59 annual report (Reference 1) or-previous 10CFR50.59 annual reports.

I l-In accordance with Generic Letter 86-10, 10CFR50.59 safety evaluations were performed on Revision 4 changes to the FPPP. The g

l evaluations determined that the revisions were not safety related or l' safety significant, and did not involve or create an unreviewed

! safety question. The revisions do not require changes to the FSV L Technical Specifications.

1

! FSV was permanently shutdown in August, 1989. PSC began defueling the reactor in November, 1989. The affect of these events have been reflected in Revision 4. The removal.from operational service of some systems, or portions thereof, has also been reflected in Revision 4.

900726g00k A OC h % 67 gDR FDC

U .. ,

, ' 1.

July c20,1990 ,

' Fort Sta Vrain Unit No. 1 P-90230

.If you' have any ' questions' or comments, please contact Mr. M. H.

~

Holmesat(303)480-6960. '

Very truly yours.-

A. Clegg Crawford Vice President Nuclear Operations ACC/BRD:faw Attachment Enclosure cc: Regional Administrator, Region'IV Attention: Mr. J. B. Beird Technical Assistant Division of Reactor Projects

(with one copy of Revision 4 to the FPPP)

Mr. R. E. Farrell Senior Resident Inspector Fort St. Vrain (with one copy of Revision 4 to the FPPP).-

I

)

UNITED STATES OF AMERICA-NUCLEAR REGULATORY COMMISSION In the Matter Public Service Company of Colorado Docket No. 50-267 Fort St. Vrain Unit No.^ 1 l

-AFFIDAVIT A. Clegg Crawford being first duly sworn, deposes and sayt.: That he is Vice President, Nuclear Operations, of Public Service Company of Colorado, the Licensee herein. that he has_ read the'information presented in the attached letter and knows the contents thereof, and that the statements and matters set' forth therein are true and correct to the best of his knowledge,_information and belief.

A. Clegg Crawford" Vice President Nuclear Operations-aTATE OF h/444/a )

COUNTY OF ML/I Subscribp and sworn o before me, a Notary Public on this

_ 2 D ta day of _ //> ,199g.

VY8/u n2+ , ~

Notary Pu pic /

i My connission expires T6##/ /L 167 ,199/.

.w?-

a P-90230 Attachment Page 1 of 2 July 20, 1990 Description of Principal Changes Incorporated in Revision 4 of the FPPP

.Section FP.1 Revised the text based on Nuclear Operation's reorganization. Stated that fire brigade duties will not interfere with an operator's duties to perform plant cooldown (restoration of cooling can be delayed for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) or other essential functions. Added a statement that assures the provisions of the FPPP will be maintained for all systems required by the FPPP during FSV defueling unless NRC concurrence to deviate is obtained.

Section FP.2 Reflected the addition of fire detectors that are located in the three Battery Rooms. Stated that PSC will administrative 1y maintain approximately 12 million gallons in one of the storage ponds for contingency makeup requirements as opposed to the required 10 million gallons in a combination of both ponds. Clarified the titles of the Storage Basin Circulating Water Makeup Pumps and the Electric Motor Driven Fire Water Pump. Added the Reactor Building locations of eight-hour battery pack lights. Added the Turbine Building and Circulating Water Pump House locations of battery powered lights.

Added a description of the Building 10 HVAC system. Revised the description of how water damage is avoided in the Control Room.

i Revised the year of compliance with NFPA 78 to agree with the description in Section FP.5.5. Added the location of the Security Diesel.to the FSV Plot Plan figure. Added fire detectors and fire brigade information to general location figures.

Section FP.3 Removed the oil mist detector system from the Reactor Building list of fire detectors based on the hydraulic oil system being drained and removed from operational service. Reflected the addition of fire 1 detectors that are located in the three Battery Rooms. '

Section FP.4 Clarified the titles of the Storage Basin Circulating Water Makeup Pumps and the Electric Motor Driven Fire Water Pump. Revised various equipment and instrument numbers that were typographical errors.

-, ; c, .7 .- -

3 P-90230

"' -Attachment Page 2 of,2-July 20, 1990, p t '

f Section FP.5 Stated that' PSC will ' administrative 1y ' maintain 1approximately 12

million gallons in one of the storage ponds for _ contingency, makeup.

requirements. as -opposed Lto the required 10 million gallonsein a combination of both ponds. Revised the year of compliance .with NFPA 49 : to' agree -with the description-Lin . Section FP.S.S. Added the-reference to the NRC approval of the. FPPP, _ Revision 3. ,

4