Responds to NRC Re Violations Noted in Insp Rept 50-344/88-04.Corrective Actions:Work in Progress in Vicinity of Hot Spots Halted,Access to Area Restricted & Area Resurveyed & Labelled
ML20151V816
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/27/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805030195
Download: ML20151V816 (3)


Text

,

I- Elll PortlandGeneralElechicCorpany David W. Cockfield Vice President, Nuclear April 27, 1988 Trojan Nuclear Plant Docket 50-344-License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555

Dear Sir:

Reply to a Notice of Violation Your letter of March 28, 1988 transmitted a Notice of Violation associated with Nuclear Regulatory Commission Inspectior. Report 50-344/88-04.  ;

Attached is our response to that Notice of Violation.  !

Sincerely, j l

I Attachment  ;

1 c: Mr. John B. Martin l Regional Administrator, Region V I U.S. Nuclear Regulatory Commission Mr. William Dixon i State of Oregon )

Department of Energy j I

Mr. R. C. Barr NRC Resident Inspector l Trojan Nuclear Plant 8805030195gj80344 ADOCK PDR PDR

  • O 121 S W En rron &mt Ponnd. Oreyn 07204

3 v

Trojan Nuclear Plant Document Control Desk ,

Docket 50-344 April 27, 1988 License NPF-1 Attachment Page 1 of 2 REPLY TO A NOTICE OF VIOLATION Violation (Trojan) Technical Specification 6.11 requires that procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure.

The licensee's Radiation Protection Manual, established-pursuant to the above Technical Specification,Section II.D.2.e states, in part, that hot spots will be posted when the contact radiatien level is equal to or greater than five times the general area radiation level and the contact radiation level exceeds 100 mrom/hr.

Contrary to the above, on February 9,1988, in a work area, with a general background radiation level of 15 mrem /hr, four hot spots that exhibited contact radiation levels from 800 mrem /hr to 1200 mrem /hr were not posted.

t This is a Severity Level V Violation (Supplement IV).

J Response Portland General Electric Company-(PGE) acknowledges the violation.

1. Reason for Violation The reason for the violation was personnel error in that the Radiation Protection technician assigned to the radwaste system modification work i being performed in the area of the hot spots failed to survey and label the hot spots, as required by the Radiation Protection Manual.
2. Corrective Action Taken and Results Achieved All work in progress in the vicinity of the hot spots was immediately halted. Access to the area was restricted by locking the door (to the pipe chase area), with the key controlled by the Operations Shift Super-visor. The area was resurveyed by Radiation Protection personnel and the hot spots were labelled in accordance with approved radiation protection procedures. Other accessible areas of the Plant with potential hot spots have subsequently been resurveyed and hot spot labelling has been corrected as required.
3. Corrective Action Taken to Avoid Further Violations
a. The contract Radjetion Protection technician involved in the violation was counselled on the procedural requirements for properly locating and labelling radiation hot spots, and on requirements for following procedures. He was also given a disciplinary letter.

' Trojan Nuclear Plant Document Control Desk Docket 50-344 April 27, 1988

- License NPF-1 Attachment Page 2 of 2

b. Trojan procedural requirements for locating and labelling radiation hot trots were discussed at a staff meeting with the Radiation-Protection technicians,
c. The Radiation Protection Manual and implementing procedures will be revised to more clearly define the requirements for locating and labelling radiation hot spots.
4. Date When Full Compliance Will Be Achieved corrective action for Item 3.c will be completed by June 30, 1988. The other corrective actions have been implemented, and full compliance has been achieved.

ARA /kal 2595P.488 L