Forwards Safety Evaluation Re Util 871106 Submittal of Rept Re Verification of Adequate Borated Water Mixing & Natural Circulation Cooldown.Nrc Concerns Re Borated Water Mixing & Natural Circulation Cooldown Adequately Addressed
ML20155J406
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/18/1988
From: Jaffe D
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20155J410 List:
References
TAC-66694, NUDOCS 8810260091
Download: ML20155J406 (2)


Text

. - -. . .. . . - . - - _ . .

t e .

h0Il 8 y DISTRIBUTION:

.SVarga N e- NRC 8 Local PDRs BBoger Docket No. 50-423 DKatze ACRS(10).

SNorris DJaffee EJordan BGrimes  :

Mr. Edward J. I;roczka GPA/PA ARH/LFMB l

Senior Vice President Gray File i t Nuclear Engineering and Operation; Northeast Nuclear Energy Ccepany  !

i- Post Office Box 270  !

j Hartford, Connecticut 06141-0270

[

Dear Mr. Mroczka:

SUBJECT:

VERIFICATION OF ADEQUATE BORATED WATER MIXING AND NATURAL F l CIRCULATIONC00LDOWN(TACNO.66694) [

! In NUREG-1031, "Safety Evaluation Report Related to the Oparation of Millstone Nuclear Power Station, Unit No. 3 " the NRC staff requested that  ;

Northeast Utilities (NU) address the natural circulation capability of ^

Millstone Unit 3. Section 5.4.7.5 of NUREG-1031 re
uested that NU provide a 4 verification of adequate mixing of borated water adced to the reactor coolant system under natural circulation conditions and confim the abi'lity of 4

l Hillstone Unit 3 to cooldown under natural circulation, r By letter dated November 6,1987, NU submitted a report which compared i

, Mi?lstone unit 3 to Diablo Canyon, which had completed successful natural '

circulation tests, for the purpose of confirming the Millstone Unit 3 natural '

circulation capability. Based upon our review of the November 6, 1987  ;

submittal, as supplemented by letter dated August 3, 1988, we conclude that j

the Diablo Canyon tests are applicable to Millstone Unit 3 and that the NRC i i staff's concerns regarding borated water mixing and natural circulation {
cooldown have been adequately addressed.  ;

l- Sincerely, '

j original signed by 1 i j David H. Jaffe, Project Manager Project Directorate I-4 Division of Reactor Projects I/II f Office of Nuclear Reactor Regulation

{

l Enclosure- I As stated i

. I J  !

a .

LA:l PM:P I D:PIl 4

SNorris DJaffe .c JSto) '

j 10/ $ /88 10/lj/88 10// / 8- -4

)

G810260091 as1oga f gDR ADOCK O'500og3 p j

~.

. l Fr. E. J. Mroczka Millstene Nuclear Power Station  !

Northeast Nuclear Energy Company Unit Nc. 3 cc:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut C6103-3499 Hartford, Connecticut 06141 9270 W. D. Romberg, Vice President D. O. Nnrdquist Nuclear Operations Vanage uf Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region !

Cepartrient of Environmental Protection U. S. Nuclear Regulatory Connission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division '

Town of Waterford '

Office of Policy and Fanagerent Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Comission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut C6357 C. H. Clement, Unit Superintendent M. R. Ceully, Executive Director I

Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 268 Thomas Road Waterford, Connecticut 06385 Groton, Connecticut 06340 Ms. Jane Spector Michael L. Jones, Manager
Federal Energy Regulatory Comission Pro.iect Management Department '

825 N. Capitol Street, N.E. Massachusetts Municipal Wholesale Room 8608C Electric Company 1 Washington, D.C. 20426 Post Office Box 426 Ludlow Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher Esq.

271 South Union Street Burlington, Vermont 05402 '

I l

1