Requests Addl Info Re License Amend Application Under Generic Ltr 87-09 for Facility.Affirms That Remedial Measures Prescribed for Affected Action Statements Consistent W/Updated SAR & Supporting Safety Analysis
ML20058M771
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/09/1990
From: Jaffe D
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
GL-87-09, GL-87-9, TAC-77180, NUDOCS 9008130052
Download: ML20058M771 (3)


Text

- - - - _ _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

h( g UNITED STATES 1* g

, . f NUCLEAR REGULATORY COMMISSION a w ash tNe ton, D. C. 20555

.g

,,,,, August 9. 1990 Docket No. 50-423 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations c Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut. 06141-0270

Dear Mr. Mroczka:

~

SUBJECT:

REQUEST FOR A PITIONAL INFORMATION ON THE LICENSE AMENDMENT '

APPLICATION UNDER GENERIC LETTER 87-09 r0R MILLSTONE UNIT 3 (TACN0.77180)

The basis for accepting Specification 3.0.4-related amendments under Generic Letter 87-09 is predicated on two assumptions, namely: 1)thattheremedial measures prescribed by the Technical Specification ACTION STATEMENTS for which the exception will be granted provide a sufficient level of protection to permit operational mode changes and safe long-term operation consistent with the licensing basis described in the Updated Safety Analysis Report for Millstone Unit 3; and 2) that it will be the exception when plant startup commences with important safety features inoperable, irrespective of the exceptions granted in response to applications under Generic Letter 87-09.

We have reviewed your license amendment application under Generic Letter 87-09, s9bmitted by your letter dated July 17 1990. In order, for the NRC stafftoconcludethatthesafetybasisrelatIvetotheabovestated assumptions is satisfied, we request that for each proposed Technical S)ecification exception to be granted under Generic Letter 87-09, you affirm t1at remedial measures prescribed for the affected ACTION STATEMENTS are ,

consistent with the Updated Safety Analysis Report and its supporting safety i analyses. In addition, we request that you identify and affirm those administrative controls (e.g., maintenance program provisions,) plant operating procedures, management directives, onsite safety reviews, etc. that have been established to limit the use of the Specification 3.0.4 exceptions granted.

Your affirmation should address training necessary for ensuring that plant operators are made aware of, and are instructed to exercise the controls promulgated in limiting the use of such exceptions.

Please advise, within five days after receipt of this letter, when we may expect to receive your response. Should there be any questions concerning this request, please let me know, bk$$Oh8h ex j

'M, -

{0,g 59

'Mr. E. J. Mroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 cc:

Gerald Garfield Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Er'tironmental Protection U. S. Nuclear Regulator) Comission '

State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Nuclear Station Director W. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Nuclear Unit Director M. R. Scully, Executive Director Millstone Unit No. 3- Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 30 Stott Avenue Waterford, Connecticut 06385 Norwich, Connecticut 06360 Ms. Jane Spector Mr. Alan Menard, Manager Federal Energy Regulatory Commission Technical Services 825 N. Capitol Street, N.E. Massachusetts Municipal Wholesale Room 8608C Electric Company Washington, D.C. 20426 Post Office Box 426 Burlington Electric Department c/o Robert E. Fletcher, Esq.

271 South Union Street Burlington, Vermont 05402

(.:

I

i i

, ,: , ja 2

4. i i-  ;

t -The request in this letter affects fewer than ten respondentsi therefore, OMB o clearance is not required under P.L.96-511.  ;

Sincerely, e n ,

/s/

f L-David H. Jaffe.. Project Manager  !

Project Directorate I-4 -

Division of Reactor Projects Office of Nuclear Reactor Regulation cc: See next page_ '

DISTRIBUTION

    • 9eisiiHAf44e* ~l NRC & L PDRs

,i PDI.4 Rdg

  • SYarga

< BBoger SNorris i DJaffe i JStolz OGC EJordan *

-ACRS(10)

OFC- :PDI.4:LA' :PDI.4:PMI :PDI-4'  :  :  :

. . . . . . . : . . . . . . . . .y . . . : . . . . . . . d .T'e .... .

NAME; :Skrris :Mfe y ::JStol  :  :  : (

7,. ....:....... ....:..............:..............:...........

-DATE  : S $ NO  :  ; DW: q q (v  :  :  :

OFFICI?.L RECORD COPY Document Name: RAI 77180 i

f i

l b

o I l

C u __________________--__)