Forwards Safety Evaluation Accepting pressure-temp Limits Re Generic Ltr 88-11.Current pressure-temp Limits for Heatup, Cooldown,Leak Test & Criticality of RCS Acceptable
ML20059N406
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/03/1990
From: Vissing G
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059N407 List:
References
GL-88-11, TAC-71515, NUDOCS 9010120202
Download: ML20059N406 (2)


Text

ge

@ # :., l *L Octobe.r 3, 1990 D:cket 50-336 m

fJ Mr.-Edward J. Mroczka.

Senior Vice President

-Nuclear ~ engineering and Operations Connecticut Yankee Atomic Power Company-Northeast Nuclear Energy Company.

Post Office Box 270 Hartford,-Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

MILLSTONE, UNIT NO.'2, PRESSURE-TEMPERATURE LIMITS RELATED TO GENERIC ~ LETTER 88-11 (TAC 71515)'

By. letter dated November 1,,1988, with supplements dated April 6, 1990 2.4.o July 18, 1990, you responded to Generic Letter 88-11 which recommends Regulatory.

Guide 1.99, Rev. 2, be used in calculating the nil-ductility reference tempera '

ture of reactor vessel beltline materials. =The reference temperature relates 1

to the' pressure-temperature limits in.the Millstone, Unit.No. 2 Technical-1 Specifications, Section 3.4.

We-have-reviewed your.submittals with the assistance from.EG&G,-Idaho. m

~

1q Based on our evaluation, we1 conclude that the current pressure-temperature limits for heatup,<cooldown, leak; test and criticality of the reactor coolant:.

i system-are acceptable for 12 EFPY and they may be maintained in-the M111 stone' Unit 2 Technical Specificetions.

i We have enclosed our Safety Evaluation that supports our conclusion.

H

-Sincerely,

/s/

1 i

Guy S.'Vissing, Senior Project' Manager Project Directorate I j

-Division of Reactor-Projects - I/II y

I Office af Nuclear Reactor Regulation l

I

Enclosure:

As stated-1 4

cc w/ enclosure:

j See next page-DISTRIBUTION

    • DocketuFiler NRC & Local PDRs Plant File S. Varga (14E4). B.:Boger (14A2)

S. Norris 1

G. Vissing-K. Jabbour (9H3)'

C.Y. Cheng J. Tsao (7D4)

OGC' E. Jcrdan (MNBB 3302)

'ACR3 (10)

E. Wenzinger'(Region I) l OFC

LA:PDI-4
PM:PDI-4
POI-4 NAME SNNW

$0

$JStolz

______..___......__.._...........____.___7.._--.h..,

ng DATE :10/A /90,

10/t /90
10/# /90 0FFICIAL RECORD COPY 0 W' 3

. Document Name: -TAC 71515 g\\

901012O202 901003 6

PDR ADOCK 05000336 g

k\\

P

, PDC..

g.

.+

,s;

[

Mr. Edward J. Mroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 2 f

cc:

a Gerald Garfield, Esquire

.R. M. Kacich, Manager.

Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford,-Connecticut 06141-0270 l

W. D. Romberg, Vice President-D. O. Nordquist Nuclear Operations Director of Quality Services Northeast. Utilities Service Company Northeast Utilities Service Company:

Post Office Box 270 Post Office Box 270.

Hartford, Connecticut 06141-0270

= Hartford, Connecticut 06141-0270.

Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region.I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building -

475 Allendale Road _

y Hartford,, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First' Selectmen Energy Division Town of Waterford-1 Office of Policy and Management LHall of Records 80 Washington Street 200 Boston Post Road i

Hartford, Connecticut 06106 Waterford, Connecticut <06385 S. E. Scace, Nuclear Station Director W. J. Raymond, Resident Inspector?

Millstone Nuclear Power Station Millstone Nuclear Power Station 1

Northeast Nuclear Energy Company c/o U. S.-Nuclear Regulatory Commission-Post Office Box 128 Post Office. Box 811 Waterford, Connecticut 06385 Niantic,_ Connecticut 06357 J. S. Keenan, Nuclear Unit Director

_ Charles Brinkman, Manager Millstone Unit No. 2 Washington Nuclear Operations Northeast Nuclear Energy Company-C-E Power Systems j-Post Office Box 128 Waterford. Connecticut 06385

- Combustion Engineering.Inc.

12300 Twinbrook Pkwy Suite 330 a

=Rockville, Maryland 20852 t

j 1

.....