Forwards Notice of Withdrawal of Amend Request for Allowed Outage Time Extensions for Emergency Diesel Generators & Low Pressure Safety Injection Trains of Emergency Core Cooling Sys
ML20212J075
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/1999
From: Eaton R
NRC (Affiliation Not Assigned)
To: Necci R
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20212J079 List:
References
TAC-M93353, TAC-M94029, NUDOCS 9906280353
Download: ML20212J075 (5)


Text

_ _- .

DISTRIBUTION:

1 Dockst Fils

, PDI-2 r/f i TClark l REaton June 15e 1999 MEMORANDUM TO: Rules and Directives Branch Division of Administrative Services Office of Administration FROM: Office of Nuclear Reactor Regulation

SUBJECT:

W RTHEAST MUCLEAR ENENGY C0frANY - MILLSTONE NUCLEAR POWER STATION UNIT NO.2 One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( Five ) of the  ;

Notice are enclosed for your use. I l

Notice of Receipt of Application for Construction Permit (s) and Operating License (s).

]

Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): l Time for submission of Views on Antitrust matters.

Notice of Consideration of issuance of Amendment to Facility Operating License. (Call with 30-day insert date).

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility License (s) and Notice of Opportunity for Hearing.

Notice of Availability of NRC Draft / Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availability of Safety Evaluation Report.

Notice of Issuance of Construction Permit (s).

Notice of Issuance of Facility Operating License (s) or Amendment (s).

'O H Order. .

E I Exemption.

Notice of Granting Exemption. g g Environmental Assessment.

o Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206. I issuance of Final Director's Decision Under 10 CFR 2.206, e H Other: WTICE OF WI111DRAMAL OF APPLICATION FOR AfMIMENT TO FACILITY OPERATING LICENSE DOCKET NO. 50-336 Attachment (s): As stated

Contact:

R.'Estan Telephone: 415-30481 DOCUMENT NAME: W1193353.WPD

""uUl3

! To rec 3ve a copy of this document, indmate m the box: 'C' = Copy without attachment / enclosure "E" - Copy with attachment / enclosure *N" = No copy I OFFICE PDI-2fLA lL l l l l l l l NAME TClahW DATE b /ifl /99 OFFICIAL RECORD COPY

Mr. R. P. Nicci - Vics Przeident Junn 15,1999 -

Nucinr Ov:rsight end Rigul: tory Affairs c/o Mr. David A. Smith Northeast Nuclear Energy Company P. O. Box 128 Waterford,CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 2 - WITHDRAWAL OF AMENDMENT REQUESTS FOR ALLOWED OUTAGE TIME EXTENSIONS FOR l THE EMERGENCY DIESEL GENERATORS AND THE LOW PRESSURE SAFETY INJECTION TRAINS OF THE EMERGENCY CORE COOLING SYSTEM (TAC NOS. M93353 AND M94029)

Dear Mr. Necci:

By letters dated August 23 and November 3,1995, you applied for amendments to the Millstone Nuclear Power Station, Unit 2, Operating License No. DPR-65.

The proposed change would have modified the facility technical specifications pertaining to allowed outage time for the Low Pressure Safety injection System and the Emergency Diesel Generators. Subsequently, by letter dated May 14,1999, you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, ORIGINAL SIGNED BY:

Ronald B. Eaton, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-336

Enclosure:

Notice of Withdrawal cc w/ encl: See next page DISTRIBUTION:

Docket File PUBLIC R. Eaton PD#1-2 Reading E. Adensam (e-mail only) J. Clifford OGC ACRS S. Durr, Rl T. Clark To receive a copy of tnis accument, indicate "c" In the Dox g OFFICE PDI-@ / PDI-2/LA, [ PDl-2/SC (

NAME REatN:Icc TC h h JCdord (i DATE Y/ M /99 I b / ll /99 4 /d /99 DOCUMENT NAME: G:\PDI-2\ Millstone 2\Wil93353.wpd ,

OFFICIAL RECORD COPY i l

I

.c.

.: {p  % ' UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066tM001

%*****/ June 15, 1999 Mr. R. P. Necci - Vice President Nuclear. Oversight and Regulatory Affairs

' c/o Mr. David A. Smith Northeast Nuclear Energy Company P. O. Box 128

.Waterford, CT 06385

~

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 2 - WITHDRAWAL OF AMENDMENT REQUESTS FOR ALLOWED OUTAGE TIME EXTENSIONS FOR THE EMERGENCY DIESEL GENERATORS AND THE LOW PRESSURE

- SAFETY INJECTION TRAINS OF THE EMERGENCY CORE COOLING SYSTEM (TAC NOS. M93353 AND M94029) -

Dear Mr. Necci:

By letters dated August 23 and November 3,1995, you applied for amendments to the Millstone Nuclear Power Station, Unit 2, Operating License No. DPR-65.

The proposed change would have modified the facility technical specifications pertaining to allowed outage time for the Low Pressure Safety injection System and the Emergency Diesel Generators. Subsequently, by letter dated May 14,1999, you withdrew the amendment request.

-The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to

' Facility Operating License with the_ Office of the Federal Register for publication.

Sincerely,

./4 onald B. Eaton, Sr. Project Manager, Section 2 Project Directorate l Division of Licensing Project Management

~ Office of Nuclear Reactor Regulation Docket Nos. 50-336 l

Enclosure:

Notice of Withdrawal -

cc w/ encl: See next page i

j

y,_ l l

  • ~

Millstons Nucinr Pow:r Station Unit 2 cc:

Ms. L. M. Cuoco- Eniest C. Hadley, Esquire l Senior Nuclear Counsel 1040 B Main Street  !

Northeact Utilities Service Company P.O. Box 549 i P. O. Box 270 West Wareham, MA 02576 -

Hartford, CT 06141-0270 -

Mr. R. P. Necci  !

Edward L. Wilds, Jr., Ph.D. Vice President - Nuclear Oversight Director, Division of Radiation and Regulatory Affairs Department of Environmental Protection Northeast Nuclear Energy Company

- 79 Elm Street - P. O. Box 128 Hartford, CT 06106-5127 Waterford, CT 06385 Regional Administrator, Region 1 Mr. J. T. Carlin

. U.S. Nuclear Regulatory Commission Vice President - Human Services 475 Allendale Road Northeast Utilities Service Company King of Prussia, PA 19406. P. O. Box 128 l Waterford, CT 06385  ;

. First Selectmen Town of Waterford Mr. Allan Johanson, Assistant Director

- 15 Rope Ferry Road Office of Policy and Management Waterford, CT 06385 Policy Development and Planning Division i Mr. Wayne D. Lanning, Director 450 Capitol Avenue - MS# 52ERN ,

Millstone inspections P. O. Box 341441 i Office of the Regional Administrator Hartford, CT 06134-1441 475 Allendale Road King of Prussia, PA 19406-1415 Mr. M. H. Brothers Vice President - Millstone Operations  ;

Charles Brinkman, Manager Northeast Nuclear Energy Company

~ Washington Nuclear Operations P.O. Box 128 ABB Combustion Engineering Waterford, CT 06385 12300 Twinbrook Pkwy, Suite 330

- Rockville, MD 20852 Mr. J. A. Price Director - Unit 2 Operations .

. Senior Resident inspector Northeast Nuclear Energy Company  !

Millstone Nuclear Power Station P.O. Box 128 c/o U.S. Nuclear Regulatory Commission Waterford, CT 06385 P.O. Box 513 Niantic,CT 06357 Mr. L. Olivier Senior Vice President and Chief Mr. F. C. Rothen Nuclear Officer - Millstone

. Vice President - Nuclear Work Services Northeast Nuclear Energy Company Northeast Utilities Service Company -

P.O. Box 128 P. O. Box 128 Waterford, CT 06385 Waterford, CT 06385 y

l l

1

. j l

. ' Mill:tc .e Nucl:a: oowsr Station Unit 2 l cc: Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Citizens Regulatory Commission ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, C7 06385 Deborah Katz,' President Citizens Awareness Network

. P. O. Box 83 Shelburne Falls, MA 03170

, Ms. Terry Concannon Co-Chair Nuclear Energy Advisory Council 1 Room 4100 -

Legislative Office Building Capitol Avenue

' Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair -

Nuclear Energy Advisory Council 128 Terry's Plain Road I Simsbury, CT 06070 Little Harbor Consultants, Inc.

Millstone -ITPOP Project Office P. O. Box 0630 Niantic, CT 06357-0630

)

Attomey Nicholas J. Scobbo, Jr.

Ferriter, Scobbo, Caruso, Rodophele, PC .

75 State Street,7th Floor - 4 Boston, MA 02109 Mr. D. B. Amerine Vice President - Engineering Services Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT. 06385 Mr. D. A. Smith

' Manager- Regulatory Affairs Northeast Nuclear Energy Company P. O. Box 128 -

Waterford, CT 06385