Forwards Insp Rept 50-336/90-19 on 900910-14.No Violations Noted
ML20058A979
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/17/1990
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20058A983 List:
References
NUDOCS 9010290336
Download: ML20058A979 (2)


See also: IR 05000336/1990019

Text

i

i

-

.

..g

OCT 171990

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report No. 50-336/90-19

,

This letter refers to the routine inspection conducted by Mr. D. Bessette of

this office on September 10 - 14, 1990, at the Millstone 2 site in Waterford,

Connecticut. The inspection examined the actions by the licensee to resolve

issues identified in NRC Inspection Report 50-336/89-13, dated October 11, 1990.

'

Also examined were licensee's actions regarding allegations submitted to the NRC

subsequent to the NRC Inspection Report 10-336/89-13.

This inspection was of

activities authorized by NRC License No. DPR-65.

Discussions of our findings

were held by Mr. Bessette with Mr. S. Scace and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations'of procedures and quality

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

'

,

.

Lee H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report Number 50-336/90-19

" (' M

l

0FFICIAL RECORD COPY

IR MILL 2 90-19 - 0001.0.0

10/11/90

Obbk$$$8d[36

nc

j

i

.J.

.;

e

o.

-

.

.'

.-

!

Northeast Nuclear Energy Company

2

!

I

cc w/ enc 1:-

W. D. Romberg, Vice President, Nuclear Operations

l

S. E. Scace, Station Director, Millstone

i

D. O. Nordquist, Director of Quality Services

,

R. M. Kacich, Manager, Generation Facilities Licensing

!

E. A. DeBarba, Station Director, Haddam Neck

Gerald Garfield, Esquire

i

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

,

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

3

State of Connecticut

t

bec w/ enc 1:

!

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

i

J. Caldwell, EDO

4

G. Vissing, PM, NRR-

1

R. Bellamy, DRSS

L. Bettenhausen. DRS

'

N. Blumberg, DRS

W. Baunack, DRS

,

A. Finkel, DRS

I

ORP Section Chief

.

W. Oliveira, DRS

J. Stewart, DRP

s

' J. Shediosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports

'

DRS Files (3)

,

RI:DRS .

RI:DRS

.

Bes tie /ms/ajk

Be),tenhausen

10/h/90.-

l

10//7/90

^

._

0FFICIAL RECORD COPY-

IR MILL 2 90-19 - 0002.0.0

10/16/90-

-

-

. . - .-.