.e.

.

.

.

OCT o j jggg Docket No. 50-336 Northeast Nuclear Energy Company ATTN: Mr. E. J. Mroczka Senior Vice President -

Engineering and Operations Group P.O. Box 270 Hartford, CT 06141-0270

Dear sir:

Subject:

Inspection No. 50-336/90-09

!

This refers to your letters dated July 27 and September 7,1990, in response,to

our letter dated J*ne 28, 1990, concerning the violation involving the improper u

performance of main station battery surveillances. We note that your updated reply on September 7 corrected a previously documented error concerning actions to prevent recurrence.

.

Thank you for informing us of the corrective and preventive actions documented

{

in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

L

Sincerely, i

Edward C. Wenzinger. Chief ~

-j Projects Branch 4 '

'i Division of Reactor Projects-

!.

DISTRIBUTION:

W.D. Romberg, Vice President, Nuclear Operations S.E. Scace, Station Director, Millstone D.O. Nordquist, Director of Quality. Services R.M. Kacich, Manager, Generation Facilities Licensing-Gerald Garfield, Esquire J.S. Keenan, Nuclear Unit Director, Millstone 2 Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

i NRC Resident Inspector State of Connecticut

.!

'

,

OFFICIAL RECORD COPY NE INFORM CORRECTION - 0001.0.0 9010230122 901oot 12/09/82

{tR ADOCK 0500 3}6 y }\\,

,

'.

..

.

bec:

Region I Docket" Room '(w/ concurrences)e, Management Assistant, DRMA (w/o enc 1)

R. Bellamy, DRSS DRP Section Chief J. Shediosky, SRI, Haddam Neck W. Raymond, SRI, Millstone G. Vissing, PM, NRR K. Abraham, PA0 J. Caldwell, EDO i

i

!

i l

l l

f

!

i

i l'

i i

!

i DR :FI, DRP:RI DRP:J31 D

(

(

Q ( kamp

.

,

\\

ghorst ymond Haver Wenzinger f/Jf,/90 f/t4/90 7/1.(/90

/

!

/0 Ol /90

,

..

_.

_. - - - -.--_ ___ _

-

_..

.

_.

.

-

.

.

.

.

,

!

M General Offices * Selden Street, Bothn, Connecticut ART OR ONNECTICUT 06141-0270

.

!'

'

,

September 7, 1990

!

Docket No. 50-336 B13628 Re:

10CFR2.201-

'

i Mr. Thomas T. Martin Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Reolv to a Notice of Violation By letter dated June 28,1990,(1) the NRC transmitted its Notice of Violation

'

(NOV) relating to Inspection Report No. 50-336/90-09.

The inspection was a l

routine resident safety inspection conducted from April 17 to May 29, 1990, at Millstone Nuclear Power Station, Unit No. 2.

t Pursuant to 10CFR2.201, Northeast Nuclear Energy Company (NNECg)provided its

,

response to the subject NOV in a letter dated July.27,?1990.

'In Attach-ment 1, page 4, Section 6, entitled Actions to Prevent = Recurrence,.of this letter, an error was discovered by NNECO after. submittal to the NRC.

NNEC0 made the statement that "Certain contract personnel, that have long-term assignments with the department have been certified ' as OA insoectors in accordance with ACP-QA-8.16." This should have read "Certain contract person-nel that have long-term assignments with the department have been certified as Certified Testina Personnel in accordance with ACP-QA-8.16'."

This error was due to administrative oversight, and NNECO apologizes for any

inconvenience-this may have caused.

'

.

.

(1)

E. C. Wenzinger letter to E

J. Mroczkai "NRC Region li Inspection

.

No. 50-336/90-09," dated June 28, 1990.

(2)

E. J. Mroczka letter to T. T. Martin, " Millstone ~ Nuclear. Power Station,

~

Unit No. 2, Reply to a Notice of Violation," dated, July 27,-1990.,

feS3422.REV. 4-88

.

E

.

.. _.

..

_ _ _ _

.~

T

~.

'

^

,

p j

.

..

'

~

Mr. Thomas T. Martin B13628/Page 2 September 7, 1990

,

'

Please contact us if you have any additional questions.

,

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I

Senio/rIroczka y E. 7.

Vice President cc:

G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit'Nos. 1, 2, and 3

,

'

E. C. Wenzinger, Chief, Projects Branch No. 4, Division of Reactor Projects

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 STATE OF CONNECTICUT ss. Berlin COUNTY OF HARTFORD Then personally appeared before me, E. J. Mroczka, who being duly sworn, did

>

'

state that he is Senior Vice President of Northeast Nuclear Energy Company, a l

Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein, and that the statements contained in said information are true and correct to the best of his knowledge and belief.

2hns>2 Y

.

~

'