Forwards Training Effectiveness Team Insp Rept 50-423/90-06 on 900604-08.Training Programs Well Implemented & Personnel Effectively Trained.Few Weaknesses Identified
ML20059J848
Person / Time
Site: Millstone 
Issue date: 08/16/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059J854 List:
References
NUDOCS 9009210001
Download: ML20059J848 (2)


See also: IR 05000423/1990006

Text

9 .

m.

-

-

-

-

- - -

- - -

-

--

q

,

_

?"*%,

1

uNnto STATES

%g

NUCLEAR REGULATORY COMMISS!ON

"a

}

REGION i

g g 1 g 1990

  • .

N

8

476 ALLENDALE ROAD

af

KING oF PRUS$6A, PENNSYLVANIA 1H06

_

e...+

Docket No.

50-423

Northeast Nuclear' Energy Company

,

ATTN

Mr. E. J. Nrocska

senior vice President - Nuclear

Engineering and operations aroup

P. O. Box 270

Hartford, Connecticut

06141-0270

Gentlemen:

SUBJECT:

Inspection Na=her 50-423/90-06

This letter transmits the results of the training effectivenons

team inspection led by Mr. Barry Norris of this office from June 4-

to June 8,1990, at the Millstone Nuclear Power Station, Unit 3e in

Waterford, Connecticut.

The team's findings were discussed with

members of your staff at the conclusion of the inspection on

June 8, 1990.

This inspection is in keeping with NRC policy as stated in the

" Commission Policy Statement on Training and Qualification of

Nuclear Power Plant Personnel" (as published in Federal Register-

53 FR 46603), which states that the NRC.will expand the method by'

which it monitors the industry training programs by performing

training inspections at selected sites. Areas examined during this

inspection are described in the enclosed NRC Region I inspection-

report. Within these areas, the inspection consisted of interviews

with personnel, observations of ongoing training, and reviews of

procedures and representative documentation.

Within the areas inspected, the team concluded that the Millstone,

Unit 3, training programs are well implemented and that personnel

are effectively trained, with only a few identified-weaknesses.

The results of.the inspection are summarised in the Executive

summary to the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy.of this letter and its enclosure will be placed in the NRC

Public Document Room.

OFFICIAL RECORD COPY 8/16/90

~5009210001 900816

PLR

ADOCK 05000423

-0 ? $ 0?)

n

-

,.

.

.

'

.

.'

,

'

Martheast Muclear Energy Co.

3

1-

If you have any gusstions regarding this report, please contact the

undersigned at 215/337-5291.

!

Sincerely,

l

ROBERT M. CALLO

Robert M. Gallo, Chief

operations tranch

Division of Reactor Safety

Raclosures

as stated

oc w/Enclosurest

W. D. Romberg, Vice President, Nuclear operations

D. O. Norquist, Director of Quality Services

R. M. Racich, Manager, Generation Facilities Licensing

8.

E. Scace, Station Superintendent

D. B. Miller, Station Superintendent, Maddam Neck

NRC Senior Resident Inspector-

Public Document Room-(PDR)

Local Publio Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

bec w/Enclosurest

Region I Docket Room (w/ Concurrences)

,

R. Bellamy, DRSS

_

D. Haverkamp, DRP Section Chief

P. Eselgroth, DRS Section Chief

S. Pindale, RI, Beaver Valley

R. Abraham, PAO (2)

J. Caldwell, EDO

D. Jaffe, LPN, NRR

I

1B . Norris, DRP

P. Bonnett, DRS

l

J. Dixon, DRS

L

R. Pelton, NRR

DRS Piles (2)

bec w/o Enclosurest

Management Assistant, DRMA

l

l

'

RItDRP

RK

RItDRS

BNorris

PE

h

RGallo

L

og/tv/90

og//f/90

o$/l5/So

i

I

lL

.

- . .

. .

..

.