Text
9 .
m.
-
-
-
-
- - -
- - -
-
--
q
,
_
?"*%,
1
uNnto STATES
%g
NUCLEAR REGULATORY COMMISS!ON
"a
}
REGION i
g g 1 g 1990
- .
N
8
476 ALLENDALE ROAD
af
KING oF PRUS$6A, PENNSYLVANIA 1H06
_
e...+
Docket No.
50-423
Northeast Nuclear' Energy Company
,
ATTN
Mr. E. J. Nrocska
senior vice President - Nuclear
Engineering and operations aroup
P. O. Box 270
Hartford, Connecticut
06141-0270
Gentlemen:
SUBJECT:
Inspection Na=her 50-423/90-06
This letter transmits the results of the training effectivenons
team inspection led by Mr. Barry Norris of this office from June 4-
to June 8,1990, at the Millstone Nuclear Power Station, Unit 3e in
Waterford, Connecticut.
The team's findings were discussed with
members of your staff at the conclusion of the inspection on
June 8, 1990.
This inspection is in keeping with NRC policy as stated in the
" Commission Policy Statement on Training and Qualification of
Nuclear Power Plant Personnel" (as published in Federal Register-
53 FR 46603), which states that the NRC.will expand the method by'
which it monitors the industry training programs by performing
training inspections at selected sites. Areas examined during this
inspection are described in the enclosed NRC Region I inspection-
report. Within these areas, the inspection consisted of interviews
with personnel, observations of ongoing training, and reviews of
procedures and representative documentation.
Within the areas inspected, the team concluded that the Millstone,
Unit 3, training programs are well implemented and that personnel
are effectively trained, with only a few identified-weaknesses.
The results of.the inspection are summarised in the Executive
summary to the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy.of this letter and its enclosure will be placed in the NRC
Public Document Room.
OFFICIAL RECORD COPY 8/16/90
~5009210001 900816
ADOCK 05000423
-0 ? $ 0?)
n
-
,.
.
.
'
.
.'
,
'
Martheast Muclear Energy Co.
3
1-
If you have any gusstions regarding this report, please contact the
undersigned at 215/337-5291.
!
Sincerely,
l
ROBERT M. CALLO
Robert M. Gallo, Chief
operations tranch
Division of Reactor Safety
Raclosures
as stated
oc w/Enclosurest
W. D. Romberg, Vice President, Nuclear operations
D. O. Norquist, Director of Quality Services
R. M. Racich, Manager, Generation Facilities Licensing
8.
E. Scace, Station Superintendent
D. B. Miller, Station Superintendent, Maddam Neck
NRC Senior Resident Inspector-
Public Document Room-(PDR)
Local Publio Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Connecticut
bec w/Enclosurest
Region I Docket Room (w/ Concurrences)
,
R. Bellamy, DRSS
_
D. Haverkamp, DRP Section Chief
P. Eselgroth, DRS Section Chief
S. Pindale, RI, Beaver Valley
R. Abraham, PAO (2)
J. Caldwell, EDO
D. Jaffe, LPN, NRR
I
1B . Norris, DRP
P. Bonnett, DRS
l
J. Dixon, DRS
L
R. Pelton, NRR
DRS Piles (2)
bec w/o Enclosurest
Management Assistant, DRMA
l
l
'
RItDRP
RK
RItDRS
BNorris
h
RGallo
L
og/tv/90
og//f/90
o$/l5/So
i
I
lL
.
- . .
. .
..
.