Forwards Radiological Controls Insp Repts 50-245/90-14, 50-336/90-15 & 50-423/90-13 on 900723-27.One Noncited Violation Identified
ML20059E220
Person / Time
Site: Millstone  
Issue date: 08/24/1990
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059E222 List:
References
NUDOCS 9009100093
Download: ML20059E220 (3)


See also: IR 05000245/1990014

Text

,.

L

,',

W'..

-

,.

t

l'

AUG 2 4.1990

L

l

Docket Nos. 50 245

L

50-336

.

50-423

Northeast Nuclear Energy Company

'i

ATTN: Mr. E. J. Mroczka-

-Senior Vice President - Nuclear

f

r-

L

Engineering and Operations Group

P. 0. Box 270

.

Hartford, Connecticut 06141-0270

.,

1

'

Gentlemen:

'

Subject: Combined Inspection No. 50-245/90-14;50-336/90-15;50-423/90-13

A routine radiological controls inspection was conducted on July 23-27, 1990, by~

.;

-

Mr. R. L.'Nimitz of this office at the Millstone Nuclear Power Station Units 1,

'

the conclusion of the inspection. pection were discussed with Mr. S..E. Scace at

2,'and 3.

The findings of the ins

The areas reviewed during the inspection are described-in the enclosed-

inspection report and included action on previous NRC findings, organization and

staffing, and contamination control.

One non-cited violation was-identified and is described in the enclosed report.

The violation. involved lack of posting of a radioactive material starage-area.

Several areas for improvement were also identified. These included definition

of the responsibilities of.the radiation protection manager and. enhancement of

contamination control and external exposure control procedures.

,

No response to this letter-is required Your cooperation.with us is appreciated.

Sincerely,

orgim21 sigued 87:

k , h(M

V Ronald R. Bellamy, Chief

,

l)

Facilities Radiological Safety

c

and Safeguards Branch

Division of Radiation Safety-

and Safeguards

Enclosure:

Combined NRC Inspection Report Nos. 50-245/90-14;

-

50-336/90-15; 50-423/90-13

031 ?],

i\\

bI

90o910oo9a 9oos24 "

P DR . ADOCK 05000245.

O

.

PNU.i

s

.- .

. .

-.

-

_-.

-_.

- - . .

_ -

. .

A ,.

.'.

ys

.

,

Northeast Nuclear Energy

2

AUG 8 41990

J

.

Company

-

~

l

cc w/ enc 1:'

.

W.- D.= Romberg$tation Director, Millstone.Vice President. Nuclear Operations

S. E. Scace,.

D. O. Nordquist, . Direct' r of Quality Services

o

R. M. Kacich,' Manager. Generation Facilities Licensing

Gerald Garfield, Esquire perintendent, Haddam Neck

E. A. DeBarba Station Su

'-

Public Document Room.(PDR)-

>

'

Local' Public Document Room (LPDR)

'

NuclearSafetyInformationCenter(NSIC)

NRC Resident inspector

State of Connecticut

u

'

l

( ,.

'

.

.

'

.

l'

I

-

l

L

,

, , - .

- .

.

.

.

.

_ . _ _ _ _ . . . . . . .

-

-

-

-

-

- - - -

--

-

-

.

.

,.

,

'}i'

Northeast Nuclear Energy l

3

Company-

_

bec w/ encl:- -

.

Management Assistant,(with concurrences)

Region 1 Docket' Room

-

DRMA-(h,

encl)

DRP Section Chief

SRI, Haddam Neck

J.Shedlosky$RI. Millstone 3

W.Ramond[PM,NRR

M. Bo le,

G. Vi sing PM NRR

=K. Abraham (,PAb,RI(2)

D. Jaffa,

PM NRR

R. Bores DRS$

J. Caldwell, EDO

RI:DRSS

RI:

DRSS

[Bellamy

Pa

ak

Nig

8/g/90

8/l600

8/.tl/90

i

_ n~___

_

_ ___

_ __________

_ _ _ _ _ _ _

___._ ___________ _________ _ __

_________________;_j