ML20056A945
| ML20056A945 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/07/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20056A946 | List: |
| References | |
| NUDOCS 9008100194 | |
| Download: ML20056A945 (2) | |
See also: IR 05000423/1990080
Text
>
s
-
v
.w
.
7 1%
y
s
-
7
>
Oocket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut 06141
,
Gentlemen:
SUBJECT:
INSPECTION NO. 50-423/90-80
During the period of April 16 - 25, 1990, the NRC conducted an announced team
inspection of the emergency pror.<dures used by the operators et the Millstone
Station, Unit 3.
,
At.the conclusion of the inspectio.' the preliminary findings were discussed
with those members of your staff ide'tified in the. enclosed report. Within the
context of this report, the' term emersency procedures includes the Emergency
Operating Procedures (EOPs), Abnormal Operating Procedures (A0Ps), and all
procedures directly referenced within the E0Ps.
The overall assessment, by the inspection team, is that the program for the
development and maintenance of symptom based Emergency Operating Procedures at
the Millstone Station, Unit 3 is adequate.
It is noted that you are currently
reviewing and revising all emergency procedures.
Significant improvements were
p
identified for those procedures that had been revised, but not implemented,
prior to the conduct of this inspection.
Utilization of the emergency procedures
by licensed operators, as witnessed during simulator observations, was also
deemed acceptable.
Attachment 3 to the enclosed inspection report summarizes the weaknesses
identified relative to the emergency procedures. You are requested to respond
to'the Attachment 3 weatresses within sixty days of receipt of this letter,
identifying actions tahn or planned.
The response requested by this letter is not subject to the clearance procedures
'
of the Office of Management and Budget as required by the Paperwork Reduction
a
Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
"
letter and its enclosure will be placed in the NRC Public Document Reom.
'
OFFICIAL RECORD COPY
BISSETT/EOP/7/3/90 - 0001.0.0
08/06/90
,
.
$ N$
h
~
L
3
$
.
'D
W
,
,
I ;
,
Northeast Nuclear Energy Co.
2
,
Should you have any questions regarding this inspection, please contact me at
215-337-5291.
Sincerely,
Original Signed By 4
Ro rt
'G
Chief
Operations Branch
Division of Reactor Safety
Enclosure:
Inspection Report No. 50-423/90-80 w/ Attachments 1, 2, and 3
cc w/ enc 1:
W. D. Romberg, Vice President Nuclear Operations
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager,. Generation Facilities Licensing
S. E. Scace, Station Superintendent
D. B. Miller, station Superintendent, Haddam Neck
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
R. Bellamy, DRSS
-
S. Pindale, RI, Beaver Valley
W. Raymond, SRI, Millstone 1&2
J. Caldwell, ED0
D. Jaffe, LPM, NRR
DRP $ection Chief
P. Eselgroth, DR3
P. Bissett, DRS
DRS Files (2)
OL Facility File
'
DgA
DRS:RI
I
Bissett/aj
E r , . ..
G lo
07/h90
05/ 2 /90
08/h /90
,
0FFICIAL RECORD COPY
BISSETT/EOP/7/3/90 - 0002.0.0
07/20/90
3