Forwards Insp Rept 50-423/90-80 on 900416-25.Weaknesses Identified
ML20056A945
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/07/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20056A946 List:
References
NUDOCS 9008100194
Download: ML20056A945 (2)


See also: IR 05000423/1990080

Text

> s -

v

.w .

7

y

1% s

-

7

>

Oocket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

, Hartford, Connecticut 06141

Gentlemen:

SUBJECT: INSPECTION NO. 50-423/90-80

During the period of April 16 - 25, 1990, the NRC conducted an announced team

inspection of the emergency pror.<dures used by the operators et the Millstone

, Station, Unit 3.

At.the conclusion of the inspectio.' the preliminary findings were discussed

with those members of your staff ide'tified in the. enclosed report. Within the

context of this report, the' term emersency procedures includes the Emergency

Operating Procedures (EOPs), Abnormal Operating Procedures (A0Ps), and all

procedures directly referenced within the E0Ps.

The overall assessment, by the inspection team, is that the program for the

development and maintenance of symptom based Emergency Operating Procedures at

the Millstone Station, Unit 3 is adequate. It is noted that you are currently

reviewing and revising all emergency procedures. Significant improvements were

p identified for those procedures that had been revised, but not implemented,

prior to the conduct of this inspection. Utilization of the emergency procedures

by licensed operators, as witnessed during simulator observations, was also

deemed acceptable.

Attachment 3 to the enclosed inspection report summarizes the weaknesses

identified relative to the emergency procedures. You are requested to respond

to'the Attachment 3 weatresses within sixty days of receipt of this letter,

identifying actions tahn or planned.

'

The response requested by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

a Act of 1980, PL 96-511.

"

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

'

letter and its enclosure will be placed in the NRC Public Document Reom.

OFFICIAL RECORD COPY BISSETT/EOP/7/3/90 - 0001.0.0

08/06/90

h

~

L ,

.

$ N$ 3

.

$

'D W

,

,

I ; ,

Northeast Nuclear Energy Co. 2

,

Should you have any questions regarding this inspection, please contact me at

215-337-5291.

Sincerely,

Original Signed By 4

Ro rt 'G Chief

Operations Branch

Division of Reactor Safety

Enclosure: Inspection Report No. 50-423/90-80 w/ Attachments 1, 2, and 3

cc w/ enc 1:

W. D. Romberg, Vice President Nuclear Operations

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager,. Generation Facilities Licensing

S. E. Scace, Station Superintendent

D. B. Miller, station Superintendent, Haddam Neck

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

R. Bellamy, DRSS -

S. Pindale, RI, Beaver Valley

W. Raymond, SRI, Millstone 1&2

J. Caldwell, ED0

D. Jaffe, LPM, NRR

DRP $ection Chief

P. Eselgroth, DR3

P. Bissett, DRS

DRS Files (2)

OL Facility File

DgA

'

DRS:RI I

Bissett/aj E r , . .. G lo

, 07/h90 05/ 2 /90 08/h /90

0FFICIAL RECORD COPY BISSETT/EOP/7/3/90 - 0002.0.0

07/20/90

3