ML20217A082

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-336/90-18 on 900822-1001 & Notices of Violation & Deviation
ML20217A082
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/05/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20217A087 List:
References
NUDOCS 9011200176
Download: ML20217A082 (3)


See also: IR 05000336/1990018

Text

.-

.e

/,, ,

.

'y ,

,-

.

NOV o 5 $0

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P.O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: NRC Region I Inspection No. 50-336/90-18 l

This letter transmits the results of the routine safety inspection conducted by

Mr. P. Habighorst of this office on August 22 - October 1, 1990, at Millstone

Nuclear Power Station, Unit 2, Waterford, Connecticut, of activities authorized

by HRC License No. DPR-65. Our findings were discussed by Mr. Habighorst with

Mr. J. Keenan and others of your staff at the conclusion of the inspection.

Areas examined during the inspection are described in the NRC Region I

inspection report which'is enclosed with this letter. Within these areas, the

inspection consisted of observation of activities, interviews with personnel,

and document reviews.

Based on the results of this inspection, it appears that certain of your

'

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation and in the Notice of Deviation enclosed here-

with as Appendices A.and B. The violation involves the-unavailability of the

reactor vessel level monitoring system during reduced inventory operation, and'

the deviation involves a failure to implement a commitment for the spent fuel

pool'boraflex coupon surveillance program. You are required to respond to this

letter, and in preparing your response, you should follow the instructions in

-Appendices A and B.

With regard to operational events that occurred during and shortly after this

inspection,;we are concerned by the number of problems noted with. personnel

performance, as identified in tagging errors, procedural non-adherence, and

inadequate configuration controls. The examples are highlighted in report

details _ 2.3.1, 2.3.2, 2.5, and 7.1. Another example of poor personnel per-

formance'that occurred after the inspection period involved the dropping of the

incore instrumentation plate. We request that you respond to this matter

within 30 days of your receipt of this letter.- In your response,.you should

address these personnel performance _ problems and describe the actions taken [

individually and collectively to prevent recurrence. 1

-m 0FFICIAL RECORD COPY IR MILL 2 90-18 - 0001.0.0

--'A# 11/29/80

001120o176 9021o3

$DR ADOCK 0500o336

h-()

i

PDC $

.,

..

,

'. -

,. Northeast Nuclear Energy Company 2

, p ,, g3

The responses requested by this letter are not subject to the clearance

procedures of the Office of Management and Budget, as required by the

Paperwork Reduction Act of 1989, PL 96-511.

Your cooperation with us is appreciated.

Sincerely,

original Signed By:

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures:

1. Appendix A, Noti.:e of Violation

2. Appendix B, Notice of Deviation

3. NRC Region I Inspection Report No. 50-336/90-18

cc w/encis:

W. D. Romberg, Vice President, Nuclear Operations

D. O. Nordquist, Director of Quality Services

R. M. Kacich,. Manager, Generation Facilities Licensing

S. E. Scace, Station Director, Millstone

J. S. Keenan, Nuclear Unit Director, Millstone Unit 2

Gerald Garfield, Esquire  ;

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

i

.

,

i

a

I

0FFICIAL RECORD COPY IR MILL 2 90-18 - 0002,0.0

11/29/80

!

~'

,,  ;

  • . J

,

-

.' ,

. .

. Northeast Nuclear Energy Company 3

.

bec w/ enc 15:

Region I Docket Room (with concurrences)

Management Assistant DRMA (w/o enclosures)

DRP Section Chief

J. Shedlosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone

G. Vissing, NRR/PDI4

J. Joyner, DRSS

J. Caldwell, EDO

M. Conner DRP (See report detail 2.6)

bec w/ Appendicies A and B, Report Cover Sheet, and Executive Summary only:

C. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

L. Bettenhausen, DRS  !

J. Durr, DRS

M. Knapp, DRSS

R. Cooper, DRSS

J. Stolz, NRR/PDI-4

r

,

ef sAf ul1

g 10' $10-

'( (y) 3

L .

o-

/

bGo

S 93 - QSQ

R R .. R R

P.k bighorst W.Raymond D. .kamp inger '

- [1 - r

11/$ /90 (/ '11/3 /90 11/1 /90

11/f/90

.

OFFICIAL RECORD COPY IR MILL 2 90-18 - 0002.1.0.

11/29/80